Kentucky WRIS Portal
About Us
Loan Programs
Loan Calculator
WRIS
Internet Mapping
WRIS Portal
System Data
Project Profile Data
Cleaner Water Program Funding
SRF Project Funding
Area Water Management Planning Councils
Downloadable Reports
Water Management Coordinators
ADD GIS Staff
Legislation
& Regulations
WRIS Contact
Don Schierer
502-892-3486
E-mail
Working...
Drinking Water Project Profile:
This profile is read-only (constructed or withdrawn).
Project Title:
Hwy 36 HDPE Replacement
Project Number:
WX21041010
AWMPC:
NKADD
Funding Status:
Partially Funded
Date Approved by AWMPC:
10.22.2024
Project Status:
Constructed
Primary County:
Carroll
Project Schedule:
Constructed
Planning Unit:
Carroll
E-ClearingHouse SAI:
KY202301050005
ECH Status:
Approved
Primary System:
KY0210067
Carrollton Utilities
ADD WMC Contact:
Grace Herrmann
Legal Applicant:
Carroll County Fiscal Court
Entity Type:
County Fiscal Court
Narrative
Applicant
Administration
Budget
& Schedule
Impacts
Components
Sustainable
Infrastructure
Audit
Project Title:
Hwy 36 HDPE Replacement
Project Description:
This project will replace 3100 feet of 3" water lines on HWY 36. The existing 1600' segment of 3" HDPE was installed in 2004 with poor fusion procedures. The other 1500' section of 3" PVC was installed on rocky, unstable soil with no bedding. The pipe has been repaired numerous times with mechanical clamps and leaks are regularly found on this section of line. Replacing this line will remove the source of the leaks. The project will include 2 road bores, which will use horizontal directional drilling construction method, 1 being under KY-36 and the other under Notch Lick Rd (County Road). There will be 4 gate valves installed to allow isolation of the line if any leaks are found in the future.
Need For Project:
Briefly describe how this project promotes public health or achieves and/or maintains compliance with the Clean Water Act or Safe Drinking Water Act:
The HDPE section of line is very prone to leaking at the joints because improper fusion procedures were used in the original construction. The PVC section of the line is prone to leaking at the joints because of the improper bedding to protect the PVC from the rocky, unstable soils. The numerous leaks lead to increased water loss, time loss, and interruptions in service for the customers.
Project Alternatives:
Alternate A:
Note: If project includes the construction of a new treatment plant or upgrade to existing plant, please explain regionalization options here.
Do Nothing. The line will be left in its current condition and repairs will be made as needed with mechanical clamps. This will lead to continued interruptions to service and water loss issues. Also, the mechanical clamps will fail much sooner than properly fused HDPE pipe.
Alternate B:
Joint Reinforcement/Re-fuse. An alternative would be to excavate the line and re-fuse the pipe or install more durable and long-lasting mechanical joints. It would take a large amount of time to find each joint, cut out the old and replace with new pipe or a mechanical clamp. This would also create numerous interruptions in service.
Entity Information
Entity Type:
County Fiscal Court
Entity Name:
Carroll County Fiscal Court
PSC Group ID:
Office EMail:
carrollcoclerk@yahoo.com
Web URL:
www.carrollcountygov.us
Office Phone:
502-732-7000
Fax:
502-732-7023
Entity Address Information
Mail Address
Physical Address
Address Line 1:
440 Main St 2nd Floor
Address Line 2:
City, State Zip:
Carrollton
,
KY
41008
Entity Contact Information
Contact Type
Name
Title
EMail
Phone
Cell
Business Contact:
James Wilhoite
County Judge Executive
jdwilhoite@carrollcountygov.us
502-732-7000
502-525-7810
Authorized Official:
James Wilhoite
County Judge Executive
jdwilhoite@carrollcountygov.us
502-732-7000
502-525-7810
Information Source:
Kentucky Department for Local Government
Date Last Modified:
03.11.2025
Project Administrator (PA) Information
Name:
Terry A Roach
Title:
Utility Engineer
Organization:
Carrollton Utilities
EMail:
troach@cuky.us
Phone:
502-732-1217
Fax:
502-732-7058
Address Line 1:
900 Clay St
Address Line 2:
City, State Zip:
Carrollton
,
KY
41008
Applicant Contact (AC) Information
Name:
Kaleb Nab
Title:
Project Engineer
Organization:
Carrollton Utilities
EMail:
knab@cuky.us
Phone:
502-732-1218
Fax:
Address Line 1:
900 Clay St
Address Line 2:
City, State Zip:
Carrollton
,
KY
41008
Project Engineer (PE) Information
This project requires a licensed Professional Engineer.
A Professional Engineer has been procured for this project.
Licensed Engineer Information
License Number:
PE 36343
PE Name:
Kaleb Nab
Firm Name:
Address Type:
Work
Address Line 1:
Carrollton Utilities
Address Line 2:
900 Clay St
Address Line 3:
P O Box 269
City, State Zip:
Carrollton
,
KY
41008
License Status:
Current
Disciplinary Actions:
No
Issue Date:
02.17.2021
Expiration Date:
06.30.2026
Phone:
502∙732∙1218
Fax:
EMail:
knab@cuky.us
Kaleb Nab
Current
36,343
Estimated Budget
As-Bid Budget
Project Cost Categories
Cost Category
Cost
Administrative Expenses:
Legal Expenses:
Land, Appraisals, Easements:
Relocation Expense & Payments:
Planning:
Engineering Fees - Design:
Engineering Fees - Construction:
Engineering Fees - Inspection:
Engineering Fees - Other:
Construction:
$173,100
Equipment:
Miscellaneous:
Contingencies:
Total Project Cost:
$173,100
Construction Cost Categories
Cost Category
Cost
Treatment:
Transmission and Distribution:
$173,100
Lead Remediation:
Source:
Storage:
Purchase of Systems:
Restructuring:
Land Acquisition:
Non-Categorized :
Total Construction Cost:
$173,100
Total Sustainability Costs:
Note:
Sustainability costs are included within other costs
reported in this tab. This breakout, when provided,
is for SRF review purposes.
Project Funding Sources
Total Project Cost:
$173,100
Total Committed Funding:
$170,390
Funding Gap:
$2,710
(Partially Funded)
Funding Source
Loan or
Grant ID
Fiscal
Year
Amount
Status
Applicable
Date
21SB036 Cleaner Water Program (FY 2022)
21CWW027
2022
$120,390
Committed
04-02-2024
22HB001 Cleaner Water Program (FY 2023)
22CWW219
2023
$50,000
Committed
11-19-2022
Total Committed
$170,390
Funding Source Notes
$100,000 from Carroll County Direct Allocation. $50,000 from FY23 Cleaner Water Program
Estimated Project Schedule
Estimated Environmental Review Submittal Date:
10.03.2022
Estimated Bid Date:
11.03.2022
Estimated Construction Start Date:
01.01.2023
Estimated Construction Completion Date:
05.31.2023
The following systems are beneficiaries of this project:
KY0210067
Carrollton Utilities
Checked box indicates primary system for this project.
Project Ranking by AWMPC:
Regional Ranking(s):
Planning Unit Ranking:
Total Points:
 
Plans and Specifications:
Plans and specs have been sent to DOW.
Plans and specs have been reviewed by DOW.
Plans and specs have been sent to PSC.
Plans and specs have been reviewed by PSC.
Economic Impacts
Jobs Created:
Jobs Retained:
MHI Basis:
2026: ACS 2019-2023 5yr Estimates
2025: ACS 2018-2022 5yr Estimates
2024: ACS 2017-2021 5yr Estimates
2023: ACS 2016-2020 5yr Estimates
2022: ACS 2015-2019 5yr Estimates
2021: ACS 2014-2018 5yr Estimates
2020: ACS 2013-2017 5yr Estimates
2019: ACS 2012-2016 5yr Estimates
2018: ACS 2011-2015 5yr Estimates
2017: ACS 2010-2014 5yr Estimates
2016: ACS 2009-2013 5yr Estimates
2015: ACS 2008-2012 5yr Estimates
2014: ACS 2007-2011 5yr Estimates
2013: ACS 2006-2010 5yr Estimates
2012: ACS 2005-2009 5yr Estimates
Demographic Impacts (GIS Census Overlay)
Serviceable
Demographic
Project
Area
Included
Systems
Included
Utilities
Population:
6,970
6,970
Households:
3,026
3,026
MHI:
$59,270
*
$59,270
MHI MOE:
$19,125
$19,125
MOE as Percent:
32%
32%
**NSRL:
1
1
Population and household counts are based on the 2020 Census DEC Redistricting Data (PL 94-171) dataset.
Median Household Income (MHI) Source:
American Community Survey 2019-2023 5 Yr Estimates (Table B19013
*(for the primary system operated by the above listed beneficiary utilities).
MHI MOE = Med HH Income Margin of Error.
** NSRL (Non-Standard Rate Levels):
0 = Greater than or equal to Kentucky MHI (KMHI).
1 = Between 80% KMHI and KMHI (exclusive).
2 = Less than or equal to 80% KMHI.
- KMHI =
$62,417
- 80% KMHI =
$49,934
New Customers
New Residential Customers:
New Commercial Customers:
New Institutional Customers:
New Industrial Customers:
New or Improved Service
Service Demographic
Survey
Based
Census
Overlay*
To Unserved Households:
To Underserved Households:
47
To Total Households:
47
**Cost Per Household:
$3,683
*
GIS Census block overlay figures are estimates of population and households potentially served by systems and projects based on a proximity analysis of relevant service lines to census block boundaries published for the 2010 SF1 dataset.
**
Cost per household is based on surveyed household counts, not GIS overlay values.
Geographic Impacts
For Project Area
Counties
Carroll
Legislative Districts
District Name
Legislator
House 047
Felicia Rabourn
Senate 20
Gex Williams
Congressional 4
Thomas Massie
HUC 10 Watersheds
HUC 10 Code
Watershed Name
0514010103
Corn Creek-Ohio River
Geographic Impacts
For Included System(s)
Counties
Carroll
Henry
Trimble
Legislative Districts
District Name
House 047
Felicia Rabourn
Senate 06
Lindsey Tichenor
Senate 07
Aaron Reed
Senate 20
Gex Williams
Congressional 4
Thomas Massie
DW Specific Impacts:
This project relates to a public health emergency.
This project will assist a non-compliant system to achieve compliance.
This project will assist a compliant system to meet future requirements.
This project will provide assistance not compliance related.
This project is necessary to achieve full or partial compliance with a court order, agreed order, or a judicial or administrative consent decree.
Primary system has not received any SDWA Notices of Violation within the previous state fiscal year (July through June).
Primary system has had an action level exceedance (lead concentrations exceed an action level of 15 ppb in more than 10% of customer taps sampled) within the last compliance period.
Primary system has received a lead trigger level exceedance (lead concentrations exceed a trigger level of 10 ppb in more than 10% of customer taps sampled) within the last compliance period.
Project Readiness LSL (Lead Inventory and Lead Service Line Replacement):
Lead Service Line Inventory:
A description of goals to be achieved and products to be created (e.g., electronic or GIS database; customer communication tools) when creating a lead service line inventory procedure, including a proposed timeline for achieving each goal.
Lead Service Line Replacement:
A strategy for informing customers before a LSLR and a template for an agreement with the private property owner to replace the LSL.
A process for documenting all property owners declining replacement of privately owned portion of LSL.
A procedure for customers to flush service lines and premise plumbing of particulate lead.
A proposed plan for conducting LSL replacement utilizing all requested funding.
A funding strategy for conducting LSLRs utilizing all requested funding.
Project Inventory (Mapped Features):
Linear Features:
DOW
Permit ID
Line Type
Purpose
Activity
Size
(in.)
Material
Length
(LF)
KY0210067
WATER LINE: FINISHED
DISTRIBUTION
REHAB - REPLACE PROBLEM LINES
3.00
HDPE
3,101
Total Length
3,101
Administrative Components:
The following administrative components are included in this project:
Planning
Design
Construction
Management
Note: There are no audits on record associated with the applicant entity.
Regionalization Components:
Public Water Systems Eliminated:
This project includes the elimination of public water system(s) through merger or acquisition.
Water Treatment Plants Eliminated:
This project includes the elimination of water treatment plant(s).
Supplementation of Raw Water Supply:
This project includes supplementing the existing raw water supply.
Supplementation of Potable Water Supply:
This project includes supplementing the existing potable water supply.
Emergency Only Water Supply:
This project provides emergency only water supply.
Water Source Protection:
This project will preventatively address PFAS or other emerging contaminants of the source water.
This project will address current PFAS or other emerging contaminants of the source water.
This project includes the rehabilitation of a dam or reservoir used primarily for drinking water.
This project includes land acquisition for water source protection.
Water Treatment Components:
This project includes water treatment components.
Water Distribution and Storage Components:
This project includes water distribution and/or storage components.
Water Line Extensions:
This project includes water line extension(s).
Redundancy Components:
This project includes emergency power generators for distribution and/or storage activities.
This project includes redundant distribution and/or storage processes.
Finished Water Quality:
This project includes infrastructure to address inadequate water turnover and disinfection byproducts (DBPs).
Service Line Inventory:
This project includes implementation of a service line inventory.
Water Line Replacement:
This project replaces problem water lines (breaks, leaks, or restrictive flows due to age), water lines consisting of lead and/or asbestos-cement (AC), and/or inadequately sized water lines.
Total length of line replacement:
3,101
LF
In-place or in-situ repair medhods will be used in lieu of water line replacement.
This project replaces lead service lines.
Roads Serviced by Line Replacements:
Water Loss in the Last 12 Months:
The system has experienced the following water loss over the past 12 months:
Water loss volume (MG):
68.916
Water loss percent:
25%
Water Storage and Pressure Components:
This project includes the construction of new water tank(s).
This project includes the replacement of existing water tank(s).
This project includes the rehabilitation of existing water tank(s).
This project includes the construction of new pump station(s).
This project includes the rehabilitation of existing pump station(s).
Security:
This project includes security components for water distribution infrastructure.
Green
Infrastructure
Water
Efficiency
Energy
Efficiency
Environmentally
Innovative
Asset
Management
Green Infrastructure:
Green stormwater infrastructure includes a wide array of practices at multiple scales that manage wet weather and that maintains and restores natural hydrology by infiltrating, evapotranspiring and harvesting and using stormwater. On a regional scale, green infrastructure is the preservation and restoration of natural landscape features, such as forests, floodplains, and wetlands, coupled with policies such as infill and redevelopment that reduce overall imperviousness in a watershed. On the local scale, green infrastructure consists of site and neighborhood-specific practices, such as:
Component
Cost
Item 1:
Bioretention
Item 2:
Trees
Item 3:
Green Roofs
Item 4:
Permeable Pavement
Item 5:
Cisterns
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Water Efficiency:
The use of improved technologies and practices to deliver equal or better services with less water. Water efficiency encompasses conservation and reuse efforts, as well as water loss reduction and prevention, to protect water resources for the future. Examples include:
Component
Cost
Item 1:
Installing or retrofitting water efficient devices such as plumbing fixtures and appliances (toilets, showerheads, urinals).
Item 2:
Installing any type of water meter in previously unmetered areas (can include backflow prevention if in conjunction with meter replacement).
Item 3:
Replacing existing broken/malfunctioning water meters with AMR or smart meters, meters with leak detection, backflow prevention.
Item 4:
Retrofitting/adding AMR capabilities or leak equipment to existing meters.
Item 5:
Conducting water utility audits, leak detection studies, and water use efficiency baseline studies, which are reasonably expected to result in a capital project or in a reduction in demand to alleviate the need for additional capital investment.
Item 6:
Developing conservation plans/programs reasonable expected to result in a water conserving capital project or in a reduction in demand to alleviate the need for capital investment.
Item 7:
Recycling and water reuse projects that replace potable sources with non-potable sources (Gray water, condensate, and wastewater effluent reuse systems, extra treatment or distribution costs associated with water reuse).
Item 8:
Retrofit or replacement of existing landscape irrigation systems to more efficient landscape irrigation systems.
Item 9:
Water meter replacement with traditional water meters.*
Item 10:
Distribution pipe replacement or rehabilitation to reduce water loss and prevent water main breaks.*
Item 11:
Storage tank replacement/rehabilitation to reduce water loss.*
Item 12:
New water efficient landscape irrigation system, where there currently is not one.*
Item 13:
Implementation of incentive programs to conserve water such as rebates.
Item 14:
Installing WaterSense labeled products (
https://www.epa.gov/watersense
)
Item 15:
Projects that result from a water efficiency related assessments (such as water audits, leak detection studies, conservation plans, etc.) as long as the assessments adhered to the standard industry practices referenced above.
Item 16:
Distribution system leak detection equipment, portable or permanent.
Item 17:
Automatic flushing systems (portable or permanent).
Item 18:
Pressure reducing valves (PRVs).
Item 19:
Internal plant water reuse (such as backwash water recycling).
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Energy Efficiency:
Energy efficiency is the use of improved technologies and practices to reduce the energy consumption of water projects, use energy in a more efficient way, and/or produce/utilize renewable energy. Examples include:
Component
Cost
Item 1:
Renewable energy projects, which are part of a public health project, such as wind, solar, geothermal, and micro-hydroelectric that provides power to a utility.
Item 2:
Utility-owned or publicly-owned renewable energy projects.
Item 3:
Utility energy management planning, including energy assessments, energy audits, optimization studies, and sub-metering of individual processes to determine high energy use areas.
Item 4:
Energy efficient retrofits, upgrades, or new pumping systems and treatment processes (including variable frequency drives (VFDs).*
Item 5:
Pump refurbishment to optimize pump efficiency.*
Item 6:
Projects that result from an energy efficient related assessment.*
Item 7:
Projects that cost effectively eliminate pumps or pumping stations.*
Item 8:
Projects that achieve the remaining increments of energy efficiency in a system that is already very efficient.*
Item 9:
Upgrade of lighting to energy efficient sources.*
Item 10:
Automated and remote control systems (SCADA) that achieve substantial energy savings.*
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Environmentally Innovative Projects:
Environmentally innovative projects include those that demonstrate new and/or innovative approaches to delivering services or managing water resources in a more sustainable way. Examples include:
Component
Cost
Item 1:
Total integrated water resources management planning, or other planning framework where project life cycle costs are minimized, which enables communities to adopt more efficient and cost-effective infrastructure solutions.
Item 2:
Plans to improve water quantity and quality associated with water system technical, financial, and managerial capacity.
Item 3:
Source water protection planning (delineation, monitoring, modeling).
Item 4:
Planning activities to prepare for adaptation to the long-term effects of climate change and/or extreme weather.
Item 5:
Utility sustainability plan consistent with EPA’s sustainability policy.
Item 6:
Greenhouse gas inventory or mitigation plan and submission of a GHG inventory to a registry as long as it is being done for an SRF eligible facility.
Item 7:
Construction of US Building Council LEED certified buildings, or renovation of an existing building.
Item 8:
Projects that significantly reduce or eliminate the use of chemicals in water treatment.*
Item 9:
Treatment technologies or approaches that significantly reduce the volume of residuals, minimize the generation of residuals, or lower the amount of chemicals in the residuals.*
Item 10:
Trenchless or low impact construction technology.*
Item 11:
Using recycled materials or re-using materials on-site.*
Item 12:
Educational activities and demonstration projects for water or energy efficiency (such as rain gardens).*
Item 13:
Projects that achieve the goals/objectives of utility asset management plans*
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Asset Management:
If a category is selected, the applicant must provide supporting documentation in PDF format to substantiate claims.
Asset Management Components
Last Rate Adjustment Date:
07.01.2024
Download Fee Schedule
Rate Adjustment Age (months):
6
System’s monthly water bill, based on 4,000 gallons, as a percentage of MHI:
0.72%
The system has an Asset Management Plan (AMP).
Note: AMP scoring credit requires at least one of the following components:
The AMP includes an Asset Inventory.
The AMP includes a Strategic Plan.
The AMP includes a Capital Improvement Plan.
Download Supporting Document
The system(s) involved in this project have specifically allocated funds for the rehabilitation and replacement of aging and deteriorating infrastructure.
If any box(es) above are checked, please describe each below.
CU has a capital improvement plan, have and continue to develop rates that are adequate to maintain their systems and allocate funds for rehab and replacement of aging and deteriorating infrastructure.
Activity
Date
Profile Created:
05.26.2021
Profile Last Modified:
02.12.2025
General Info Last Modified:
02.12.2025
Narrative Last Modified:
01.12.2023
Admin Info Last Modified:
10.06.2022
Budget Info Last Modified:
07.09.2024
Impacts Info Last Modified:
01.12.2023
Plans & Specs Info Last Modified:
Components Info Last Modified:
05.26.2021
GIS Last Modified:
01.12.2023
The profile is complete.
Privacy
|
Security
|
Disclaimer
|
Accessibility Statement
Copyright ©
2025
Kentucky Infrastructure Authority