Drinking Water Project Profile:
This profile is read-only (constructed or withdrawn).
Project Title:
Carroll County Regional Nexus Project
Project Number:
WX21041005
AWMPC:
NKADD
Funding Status:
Not Funded
Date Approved by AWMPC:
Project Status:
Withdrawn
Primary County:
Carroll
Project Schedule:
0-2 Years
Planning Unit:
Carroll
E-ClearingHouse SAI:
ECH Status:
Primary System:
KY0210067
Carrollton Utilities
ADD WMC Contact:
Jeff Burt
Legal Applicant:
City of Carrollton
Entity Type:
Incorporated City
Narrative
Applicant
Administration
Budget
& Schedule
Impacts
Components
Sustainable
Infrastructure
Audit
Project Title:
Carroll County Regional Nexus Project
Project Description:
Carrollton Utilities and Carroll County Water District #1 have teamed up to propose the Carroll Co. Regional Nexus project. Nexus means a connection and to be the center or focus. CU and CCWD are definitely connected and focused on our quest to provide our customers with high quality water and service. CU - Carrollton Utilities will be replacing over 4400 LF of old cast iron and undersized galvanized water lines in the downtown district of Carrollton. Additionally water meters that are old and in hard to read locations will be replaced or relocated. CCWD - Carroll Co. Water will be constructing a new 750,000 gallon storage tank and associated distribution lines to provide storage for the existing and proposed needs along the industrial-residential area of U.S. 42 corridor. The new tank will provide capacity during routine maintenance and emergencies for both public water utilities. Additionally two older and smaller ground storage tanks will be eliminated as well as 4 pressure reducing stations. The elimination of two original 1960's water storage tanks will enhance the water quality. As these two tanks were built in an era that does not reflect today's industrial standards in both structure and the hydraulics of either system.
Need For Project:
Briefly describe how this project promotes public health or achieves and/or maintains compliance with the Clean Water Act or Safe Drinking Water Act:
CU - the replacing of the old (nearly 100 years old) cast iron lines with larger PVC lines and eliminating the small (2" and less) galvanized lines will save CU money in the long term by reducing operational cost due to smoother lines, maintenance costs by virtually eliminating repairs in the street and by replacing old and hard to read meters ensure that our customers are getting proper service. CCWD - the construction of a new 750,000 storage tank and new transmission/distribution lines will allow CCWD to improve the water quality to its existing customers. During emergencies and worse case scenarios such as a possible contamination from neighboring water system that may be encountered, the additional storage will allow other utilities to shut down their treatment process until the threat has been cleared. Additionally 2 - 100,000 gallon tanks constructed in the early 1960's will be eliminated. This will reduce CCWD's maintenance costs, increase water turnover, increase system pressure and improve water quality. Four pressure reducing stations can then be eliminated which will save energy, maintenance costs and reduction in distribution pipe failures. Therefore reducing the amount of water loss. The control stations will be maintained/exercised to allow assurance that when routine inspections and preventative maintenance repairs are recommended then these tasks can easily be achieved without any interruptions to the customers. This will allow a longevity service life of this investment.
Project Alternatives:
Alternate A:
Note: If project includes the construction of a new treatment plant or upgrade to existing plant, please explain regionalization options here.
CU - leave old cast iron mains in service and deal with the ongoing maintenance issues CCWD - Construct a smaller tank that will meet the present needs but not handle future demands.
Alternate B:
CU - break the project into smaller pieces (i.e.. one block at time) which will inconvenience the property owners on Main Street for several years instead of all at once. CCWD - Do a rehab of the existing tanks and pressure reducing stations which will meet the current needs but does not allow for future growth.
Entity Information
Entity Type:
Incorporated City
Entity Name:
City of Carrollton
PSC Group ID:
30002116
Office EMail:
mwright@carrolltonky.net
Web URL:
Office Phone:
502-732-7060
Fax:
502-732-6738
Entity Address Information
Mail Address
Physical Address
Address Line 1:
PO Box 156
Address Line 2:
City, State Zip:
Carrollton
,
KY
41008
Entity Contact Information
Contact Type
Name
Title
EMail
Phone
Cell
Business Contact:
Melinda Wright
City Clerk
mwright@carrolltonky.net
502-732-7060
Authorized Official:
Robb W. Adams
Mayor
radams@carrolltonky.net
502-732-7060
Information Source:
Kentucky Department for Local Government
Date Last Modified:
04.26.2024
Project Administrator (PA) Information
Name:
Chas Robbins
Title:
Finance Officer
Organization:
Carrollton Utilities
EMail:
crobbins@carrolltonutilities.com
Phone:
502-732-7055
Fax:
502-732-7058
Address Line 1:
225 6th Street
Address Line 2:
City, State Zip:
Carrollton
,
KY
41008
Applicant Contact (AC) Information
Name:
Terry A Roach
Title:
Utility Engineer
Organization:
Carrollton Utilities
EMail:
troach@cuky.us
Phone:
502-732-1217
Fax:
502-732-7058
Address Line 1:
900 Clay St
Address Line 2:
City, State Zip:
Carrollton
,
KY
41008
Project Engineer (PE) Information
This project requires a licensed Professional Engineer.
A Professional Engineer has been procured for this project.
Estimated Budget
As-Bid Budget
Project Cost Categories
Cost Category
Cost
Administrative Expenses:
$40,000
Legal Expenses:
$10,000
Land, Appraisals, Easements:
Relocation Expense & Payments:
Planning:
$15,000
Engineering Fees - Design:
$191,059
Engineering Fees - Construction:
Engineering Fees - Inspection:
$109,730
Engineering Fees - Other:
Construction:
$2,581,881
Equipment:
Miscellaneous:
$15,000
Contingencies:
$258,188
Total Project Cost:
$3,220,858
Construction Cost Categories
Cost Category
Cost
Treatment:
Transmission and Distribution:
$747,376
Lead Remediation:
Source:
Storage:
$1,834,505
Purchase of Systems:
Restructuring:
Land Acquisition:
Non-Categorized :
Total Construction Cost:
$2,581,881
Total Sustainability Costs:
$4,380,339
Note:
Sustainability costs are included within other costs
reported in this tab. This breakout, when provided,
is for SRF review purposes.
Project Funding Sources
Total Project Cost:
$3,220,858
Total Committed Funding:
Funding Gap:
Not Funded
Funding Source
Loan or
Grant ID
Fiscal
Year
Amount
Status
Applicable
Date
KIA SRF Fund F Loan (DW)
F17-017
2017
$3,889,379
Expired
06-30-2017
KIA SRF Fund F Loan (DW)
2019
$3,220,858
Bypassed
Total Committed
Funding Source Notes
Estimated Project Schedule
Estimated Environmental Review Submittal Date:
03.30.2016
Estimated Bid Date:
06.03.2016
Estimated Construction Start Date:
07.05.2016
Estimated Construction Completion Date:
12.30.2016
The following systems are beneficiaries of this project:
KY0210067
Carrollton Utilities
KY0210066
Carroll County Water District #1
Checked box indicates primary system for this project.
Project Ranking by AWMPC:
Regional Ranking(s):
Planning Unit Ranking:
Total Points:
 
Plans and Specifications:
Plans and specs have been sent to DOW.
Plans and specs have been reviewed by DOW.
Plans and specs have been sent to PSC.
Plans and specs have been reviewed by PSC.
Economic Impacts
Jobs Created:
200
Jobs Retained:
MHI Basis:
2025: ACS 2018-2022 5yr Estimates
2024: ACS 2017-2021 5yr Estimates
2023: ACS 2016-2020 5yr Estimates
2022: ACS 2015-2019 5yr Estimates
2021: ACS 2014-2018 5yr Estimates
2020: ACS 2013-2017 5yr Estimates
2019: ACS 2012-2016 5yr Estimates
2018: ACS 2011-2015 5yr Estimates
2017: ACS 2010-2014 5yr Estimates
2016: ACS 2009-2013 5yr Estimates
2015: ACS 2008-2012 5yr Estimates
2014: ACS 2007-2011 5yr Estimates
2013: ACS 2006-2010 5yr Estimates
2012: ACS 2005-2009 5yr Estimates
Demographic Impacts (GIS Census Overlay)
Serviceable
Demographic
Project
Area
Included
Systems
Included
Utilities
Population:
6,956
6,956
Households:
3,019
3,019
MHI:
$53,149
*
$53,149
MHI MOE:
$22,175
$22,175
MOE as Percent:
42%
42%
**NSRL:
1
1
Population and household counts are based on the 2020 Census DEC Redistricting Data (PL 94-171) dataset.
Median Household Income (MHI) Source:
American Community Survey 2018-2022 5 Yr Estimates (Table B19013
*(for the primary system operated by the above listed beneficiary utilities).
MHI MOE = Med HH Income Margin of Error.
** NSRL (Non-Standard Rate Levels):
0 = Greater than or equal to Kentucky MHI (KMHI).
1 = Between 80% KMHI and KMHI (exclusive).
2 = Less than or equal to 80% KMHI.
- KMHI =
$60,183
- 80% KMHI =
$48,146
New Customers
New Residential Customers:
New Commercial Customers:
New Institutional Customers:
New Industrial Customers:
New or Improved Service
Service Demographic
Survey
Based
Census
Overlay*
To Unserved Households:
To Underserved Households:
8,230
To Total Households:
8,230
**Cost Per Household:
$391
*
GIS Census block overlay figures are estimates of population and households potentially served by systems and projects based on a proximity analysis of relevant service lines to census block boundaries published for the 2010 SF1 dataset.
**
Cost per household is based on surveyed household counts, not GIS overlay values.
Geographic Impacts
For Project Area
Counties
Carroll
Legislative Districts
District Name
Legislator
House 047
Felicia Rabourn
Senate 20
Gex Williams
Congressional 4
Thomas Massie
HUC 10 Watersheds
HUC 10 Code
Watershed Name
0509020310
Big Bone Creek-Ohio River
0510020515
Cedar Creek-Kentucky River
Geographic Impacts
For Included System(s)
Counties
Carroll
Gallatin
Henry
Owen
Trimble
Legislative Districts
District Name
House 047
Felicia Rabourn
House 061
Savannah Maddox
Senate 06
Lindsey Tichenor
Senate 07
Adrienne Southworth
Senate 20
Gex Williams
Congressional 4
Thomas Massie
DW Specific Impacts:
This project relates to a public health emergency.
This project will assist a non-compliant system to achieve compliance.
This project will assist a compliant system to meet future requirements.
This project will provide assistance not compliance related.
This project is necessary to achieve full or partial compliance with a court order, agreed order, or a judicial or administrative consent decree.
Primary system has not received any SDWA Notices of Violation within the previous state fiscal year (July through June).
Primary system has had an action level exceedance (lead concentrations exceed an action level of 15 ppb in more than 10% of customer taps sampled) within the last compliance period.
Primary system has received a lead trigger level exceedance (lead concentrations exceed a trigger level of 10 ppb in more than 10% of customer taps sampled) within the last compliance period.
Project Readiness LSL (Lead Inventory and Lead Service Line Replacement):
Lead Service Line Inventory:
A description of goals to be achieved and products to be created (e.g., electronic or GIS database; customer communication tools) when creating a lead service line inventory procedure, including a proposed timeline for achieving each goal.
Lead Service Line Replacement:
A strategy for informing customers before a LSLR and a template for an agreement with the private property owner to replace the LSL.
A process for documenting all property owners declining replacement of privately owned portion of LSL.
A procedure for customers to flush service lines and premise plumbing of particulate lead.
A proposed plan for conducting LSL replacement utilizing all requested funding.
A funding strategy for conducting LSLRs utilizing all requested funding.
Project Inventory (Mapped Features):
Point Features:
DOW
PermitID
Count
Feature Type
Purpose
Status
Existing
Capacity
Proposed
Capacity
Units
KY0210066
1
WATER TANK
TANK - INCREASE STORAGE
REPLACE - NEW
750,000.00
GALLONS
KY0210066
2
WATER TANK
ELIMINATE
REPLACE - DECOMMISSION
50,000.00
GALLONS
KY0210067
3
TRADITIONAL METER
WATER EFF - TRADITIONAL METERS
REHAB
EA
Linear Features:
DOW
Permit ID
Line Type
Purpose
Activity
Size
(in.)
Material
Length
(LF)
KY0210066
WATER LINE: FINISHED
TRANSMISSION
EXTENSION
8.00
DUCTILE IRON
500
KY0210067
WATER LINE: FINISHED
DISTRIBUTION
REHAB - REPLACE PROBLEM LINES
12.00
PVC
4,400
Total Length
4,900
Administrative Components:
The following administrative components are included in this project:
Planning
Design
Construction
Management
Audits on Record
Associated With Applicant
Audit
Year
Entity Name
Entity
Relationship
2023
Carrollton, City of
Parent
2022
Carrollton, City of
Parent
2021
Carrollton, City of
Parent
2020
Carrollton, City of
Parent
2023
Carrollton Utilities
Child
2022
Carrollton Utilities
Child
2021
Carrollton Utilities
Child
2020
Carrollton Utilities
Child
Regionalization Components:
Public Water Systems Eliminated:
This project includes the elimination of public water system(s) through merger or acquisition.
Water Treatment Plants Eliminated:
This project includes the elimination of water treatment plant(s).
Supplementation of Raw Water Supply:
This project includes supplementing the existing raw water supply.
Supplementation of Potable Water Supply:
This project includes supplementing the existing potable water supply.
Emergency Only Water Supply:
This project provides emergency only water supply.
Water Source Protection:
This project will preventatively address PFAS or other emerging contaminants of the source water.
This project will address current PFAS or other emerging contaminants of the source water.
This project includes the rehabilitation of a dam or reservoir used primarily for drinking water.
This project includes land acquisition for water source protection.
Water Treatment Components:
This project includes water treatment components.
Water Distribution and Storage Components:
This project includes water distribution and/or storage components.
Water Line Extensions:
This project includes water line extension(s).
Length of extensions:
500
LF
This projects extends service to unserved rural areas.
Redundancy Components:
This project includes emergency power generators for distribution and/or storage activities.
This project includes redundant distribution and/or storage processes.
Explanation of how redundant distribution and/or storage processes will be achieved:
CCWD #1 will add an 750,000 gallons to its storage capacity.
Finished Water Quality:
This project includes infrastructure to address inadequate water turnover and disinfection byproducts (DBPs).
Service Line Inventory:
This project includes implementation of a service line inventory.
Water Line Replacement:
This project replaces problem water lines (breaks, leaks, or restrictive flows due to age), water lines consisting of lead and/or asbestos-cement (AC), and/or inadequately sized water lines.
Total length of line replacement:
4,400
LF
In-place or in-situ repair medhods will be used in lieu of water line replacement.
This project replaces lead service lines.
Roads Serviced by Line Replacements:
Road Name
LF Serviced
7th St
400
Main St
4,000
Total LF Serviced
4,400
Water Loss in the Last 12 Months:
The system has experienced the following water loss over the past 12 months:
Water loss volume (MG):
82.616
Water loss percent:
30%
Water Storage and Pressure Components:
This project includes the construction of new water tank(s).
This project includes the replacement of existing water tank(s).
Number of replacement tank(s):
1
Number of tank(s) decommissioned:
2
Storage capacity of existing tank(s) being decommissioned:
gallons.
Proposed storage capacity of replacement tank(s):
gallons.
Reason for replacement storage:
This project includes the rehabilitation of existing water tank(s).
This project includes the construction of new pump station(s).
This project includes the rehabilitation of existing pump station(s).
Security:
This project includes security components for water distribution infrastructure.
Green
Infrastructure
Water
Efficiency
Energy
Efficiency
Environmentally
Innovative
Asset
Management
Green Infrastructure:
Green stormwater infrastructure includes a wide array of practices at multiple scales that manage wet weather and that maintains and restores natural hydrology by infiltrating, evapotranspiring and harvesting and using stormwater. On a regional scale, green infrastructure is the preservation and restoration of natural landscape features, such as forests, floodplains, and wetlands, coupled with policies such as infill and redevelopment that reduce overall imperviousness in a watershed. On the local scale, green infrastructure consists of site and neighborhood-specific practices, such as:
Component
Cost
Item 1:
Bioretention
Item 2:
Trees
Item 3:
Green Roofs
Item 4:
Permeable Pavement
Item 5:
Cisterns
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Water Efficiency:
The use of improved technologies and practices to deliver equal or better services with less water. Water efficiency encompasses conservation and reuse efforts, as well as water loss reduction and prevention, to protect water resources for the future. Examples include:
Component
Cost
Item 1:
Installing or retrofitting water efficient devices such as plumbing fixtures and appliances (toilets, showerheads, urinals).
Item 2:
Installing any type of water meter in previously unmetered areas (can include backflow prevention if in conjunction with meter replacement).
Item 3:
Replacing existing broken/malfunctioning water meters with AMR or smart meters, meters with leak detection, backflow prevention.
Item 4:
Retrofitting/adding AMR capabilities or leak equipment to existing meters.
Item 5:
Conducting water utility audits, leak detection studies, and water use efficiency baseline studies, which are reasonably expected to result in a capital project or in a reduction in demand to alleviate the need for additional capital investment.
Item 6:
Developing conservation plans/programs reasonable expected to result in a water conserving capital project or in a reduction in demand to alleviate the need for capital investment.
Item 7:
Recycling and water reuse projects that replace potable sources with non-potable sources (Gray water, condensate, and wastewater effluent reuse systems, extra treatment or distribution costs associated with water reuse).
Item 8:
Retrofit or replacement of existing landscape irrigation systems to more efficient landscape irrigation systems.
Item 9:
Water meter replacement with traditional water meters.*
Item 10:
Distribution pipe replacement or rehabilitation to reduce water loss and prevent water main breaks.*
Item 11:
Storage tank replacement/rehabilitation to reduce water loss.*
Item 12:
New water efficient landscape irrigation system, where there currently is not one.*
Item 13:
Implementation of incentive programs to conserve water such as rebates.
Item 14:
Installing WaterSense labeled products (
https://www.epa.gov/watersense
)
Item 15:
Projects that result from a water efficiency related assessments (such as water audits, leak detection studies, conservation plans, etc.) as long as the assessments adhered to the standard industry practices referenced above.
Item 16:
Distribution system leak detection equipment, portable or permanent.
Item 17:
Automatic flushing systems (portable or permanent).
Item 18:
Pressure reducing valves (PRVs).
Item 19:
Internal plant water reuse (such as backwash water recycling).
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Older water meters and those in hard-to-read locations will be replaced with new meters. The old cast iron main on Main Street in Carrollton and the 2" and less galvanized lines on 7th Street will be replaced with PVC. The proposed tank will allow for reduced pumping and provide for adequate storage for current and future uses.
Energy Efficiency:
Energy efficiency is the use of improved technologies and practices to reduce the energy consumption of water projects, use energy in a more efficient way, and/or produce/utilize renewable energy. Examples include:
Component
Cost
Item 1:
Renewable energy projects, which are part of a public health project, such as wind, solar, geothermal, and micro-hydroelectric that provides power to a utility.
Item 2:
Utility-owned or publicly-owned renewable energy projects.
Item 3:
Utility energy management planning, including energy assessments, energy audits, optimization studies, and sub-metering of individual processes to determine high energy use areas.
Item 4:
Energy efficient retrofits, upgrades, or new pumping systems and treatment processes (including variable frequency drives (VFDs).*
Item 5:
Pump refurbishment to optimize pump efficiency.*
Item 6:
Projects that result from an energy efficient related assessment.*
Item 7:
Projects that cost effectively eliminate pumps or pumping stations.*
Item 8:
Projects that achieve the remaining increments of energy efficiency in a system that is already very efficient.*
Item 9:
Upgrade of lighting to energy efficient sources.*
Item 10:
Automated and remote control systems (SCADA) that achieve substantial energy savings.*
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Environmentally Innovative Projects:
Environmentally innovative projects include those that demonstrate new and/or innovative approaches to delivering services or managing water resources in a more sustainable way. Examples include:
Component
Cost
Item 1:
Total integrated water resources management planning, or other planning framework where project life cycle costs are minimized, which enables communities to adopt more efficient and cost-effective infrastructure solutions.
Item 2:
Plans to improve water quantity and quality associated with water system technical, financial, and managerial capacity.
$3,220,858
Item 3:
Source water protection planning (delineation, monitoring, modeling).
Item 4:
Planning activities to prepare for adaptation to the long-term effects of climate change and/or extreme weather.
Item 5:
Utility sustainability plan consistent with EPA’s sustainability policy.
Item 6:
Greenhouse gas inventory or mitigation plan and submission of a GHG inventory to a registry as long as it is being done for an SRF eligible facility.
Item 7:
Construction of US Building Council LEED certified buildings, or renovation of an existing building.
Item 8:
Projects that significantly reduce or eliminate the use of chemicals in water treatment.*
Item 9:
Treatment technologies or approaches that significantly reduce the volume of residuals, minimize the generation of residuals, or lower the amount of chemicals in the residuals.*
Item 10:
Trenchless or low impact construction technology.*
$597,776
Item 11:
Using recycled materials or re-using materials on-site.*
Item 12:
Educational activities and demonstration projects for water or energy efficiency (such as rain gardens).*
Item 13:
Projects that achieve the goals/objectives of utility asset management plans*
$561,705
Total Cost:
$4,380,339
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
The entire Nexus project is a continuation of the CU and CCWD partnership to provide high quality and quantity of water to our customers by providing additional storage and improved distribution. CU will utilize directional drilling in most areas of downtown to avoid a massive disturbance to the property owners and businesses along historic Main Street.
Asset Management:
If a category is selected, the applicant must provide supporting documentation in PDF format to substantiate claims.
Asset Management Components
Last Rate Adjustment Date:
07.01.2017
Download Fee Schedule
Rate Adjustment Age (months):
78
System’s monthly water bill, based on 4,000 gallons, as a percentage of MHI:
0.64%
The system has an Asset Management Plan (AMP).
Note: AMP scoring credit requires at least one of the following components:
The AMP includes an Asset Inventory.
The AMP includes a Strategic Plan.
The AMP includes a Capital Improvement Plan.
Download Supporting Document
The system(s) involved in this project have specifically allocated funds for the rehabilitation and replacement of aging and deteriorating infrastructure.
Download Supporting Document
If any box(es) above are checked, please describe each below.
CU and CCWD both have capital improvement plans, have and continue to develop rates that are adequate to maintain their systems and allocate funds for rehab and replacement of aging and deteriorating infrastructure.
Activity
Date
Profile Created:
11.30.2015
Profile Last Modified:
12.02.2021
General Info Last Modified:
12.02.2021
Narrative Last Modified:
01.31.2018
Admin Info Last Modified:
12.18.2017
Budget Info Last Modified:
12.06.2017
Impacts Info Last Modified:
12.06.2017
Plans & Specs Info Last Modified:
Components Info Last Modified:
12.09.2015
GIS Last Modified:
02.01.2018
Deficiencies found in Components Tab:
Water Distribution:
− Replacement Storage Reason is a required input.