Kentucky WRIS Portal
About Us
Loan Programs
Loan Calculator
WRIS
Internet Mapping
WRIS Portal
System Data
Project Profile Data
Cleaner Water Program Funding
SRF Project Funding
Area Water Management Planning Councils
Downloadable Reports
Water Management Coordinators
ADD GIS Staff
Legislation
& Regulations
WRIS Contact
Don Schierer
502-892-3486
E-mail
Working...
Drinking Water Project Profile:
This profile is read-only (constructed or withdrawn).
Project Title:
City of Stanford - Water System Upgrades
Project Number:
WX21137051
AWMPC:
BGADD
Funding Status:
Partially Funded
Date Approved by AWMPC:
11.03.2015
Project Status:
Constructed
Primary County:
Lincoln
Project Schedule:
Constructed
Planning Unit:
Unit 3
E-ClearingHouse SAI:
KY201610241342
ECH Status:
Approved
Primary System:
KY0690417
Stanford Water Commission
ADD WMC Contact:
Karyn Leverenz
Legal Applicant:
City of Stanford
Entity Type:
Incorporated City
Narrative
Applicant
Administration
Budget
& Schedule
Impacts
Components
Sustainable
Infrastructure
Audit
Project Title:
City of Stanford - Water System Upgrades
Project Description:
This project will help improve water pressure and replace aging and tuberculated cast iron waterlines that have been in service since the 1950's. A major portion of this project will be replacing a cross country 8" cast iron waterline which provides water directly to the City from the water treatment plant. This waterline needs to be replaced very soon due to its necessity and the fact that it is aging and has experienced many breaks. The remainder of the project will be various system wide replacements and connections of dead-end waterlines to create loops throughout the system.
Need For Project:
Briefly describe how this project promotes public health or achieves and/or maintains compliance with the Clean Water Act or Safe Drinking Water Act:
Aging waterlines break regularly and need to be replaced. This project will help the system maintain compliance with the Safe Drinking Water Act.
Project Alternatives:
Alternate A:
Note: If project includes the construction of a new treatment plant or upgrade to existing plant, please explain regionalization options here.
Complete this project in phases instead of one comprehensive project.
Alternate B:
Continue to repair the waterlines as they break, reactive maintenance.
Entity Information
Entity Type:
Incorporated City
Entity Name:
City of Stanford
PSC Group ID:
8808200
Office EMail:
clerkallen@stanfordky.gov
Web URL:
Office Phone:
606-365-4500
Fax:
606-365-4509
Entity Address Information
Mail Address
Physical Address
Address Line 1:
403 E Main St
Address Line 2:
City, State Zip:
Stanford
,
KY
40484
Entity Contact Information
Contact Type
Name
Title
EMail
Phone
Cell
Business Contact:
Jone Allen
City Clerk
clerkallen@stanfordky.gov
606-365-4500
Authorized Official:
Dalton Miller
Mayor
mayor@stanfordky.gov
606-365-4500
Information Source:
Kentucky Department for Local Government
Date Last Modified:
04.23.2024
Project Administrator (PA) Information
Name:
Ryan Owens
Title:
General Manager
Organization:
Stanford Water Commission
EMail:
rowens@stanfordwater.com
Phone:
606-365-4510
Fax:
606-365-1023
Address Line 1:
842 E Main St
Address Line 2:
PO Box 45
City, State Zip:
Stanford
,
KY
40484
Applicant Contact (AC) Information
Name:
Ryan Owens
Title:
General Manager
Organization:
Stanford Water Commission
EMail:
rowens@stanfordwater.com
Phone:
606-365-4510
Fax:
606-365-1023
Address Line 1:
842 E Main St
Address Line 2:
PO Box 45
City, State Zip:
Stanford
,
KY
40484
Project Engineer (PE) Information
This project requires a licensed Professional Engineer.
A Professional Engineer has been procured for this project.
Licensed Engineer Information
License Number:
PE 18628
PE Name:
Richard Vaughn Williams
Firm Name:
Kenvirons, Inc.
Address Type:
Work
Address Line 1:
Kenvirons, Inc.
Address Line 2:
452 Versailles Rd.
Address Line 3:
City, State Zip:
Frankfort
,
KY
40601
License Status:
Current
Disciplinary Actions:
No
Issue Date:
02.15.1995
Expiration Date:
06.30.2024
Phone:
502∙695∙4357
Fax:
502∙695∙4363
EMail:
vwilliams@kenvirons.com
Engineering Firm Information
Permit Number:
62
Firm Name:
Kenvirons, Inc.
Phone:
502∙695∙4357
Fax:
502∙695∙4363
Web URL:
http://www.kenvirons.com/
E-Mail:
vwilliams@kenvirons.com
Address Line 1:
770 Wilkinson Blvd
Address Line 2:
City, State Zip:
Frankfort
,
KY
40601
Issue Date:
03.02.1993
Expir. Date:
12.31.2024
Permit
Status
Current
Disciplinary
Actions
No
Richard Vaughn Williams
Current
18,628
2,364
Estimated Budget
As-Bid Budget
Project Cost Categories
Cost Category
Cost
Administrative Expenses:
$25,000
Legal Expenses:
$28,000
Land, Appraisals, Easements:
$5,000
Relocation Expense & Payments:
Planning:
Engineering Fees - Design:
$189,600
Engineering Fees - Construction:
$47,400
Engineering Fees - Inspection:
$130,000
Engineering Fees - Other:
$15,000
Construction:
$3,338,110
Equipment:
Miscellaneous:
$45,000
Contingencies:
$276,890
Total Project Cost:
$4,100,000
Construction Cost Categories
Cost Category
Cost
Treatment:
Transmission and Distribution:
$3,338,110
Lead Remediation:
Source:
Storage:
Purchase of Systems:
Restructuring:
Land Acquisition:
Non-Categorized :
Total Construction Cost:
$3,338,110
Total Sustainability Costs:
Note:
Sustainability costs are included within other costs
reported in this tab. This breakout, when provided,
is for SRF review purposes.
Project Funding Sources
Total Project Cost:
$4,100,000
Total Committed Funding:
$2,958,293
Funding Gap:
$1,141,707
(Partially Funded)
Funding Source
Loan or
Grant ID
Fiscal
Year
Amount
Status
Applicable
Date
KIA SRF Fund F Loan (DW)
F17-005
2017
$2,690,000
Committed
03-02-2017
KIA SRF Fund F Loan (DW)
F17-005
2021
$268,293
Committed
02-04-2021
Total Committed
$2,958,293
Funding Source Notes
Estimated Project Schedule
Estimated Environmental Review Submittal Date:
10.31.2016
Estimated Bid Date:
07.31.2017
Estimated Construction Start Date:
10.31.2017
Estimated Construction Completion Date:
07.31.2018
The following systems are beneficiaries of this project:
KY0690417
Stanford Water Commission
Checked box indicates primary system for this project.
Project Ranking by AWMPC:
Regional Ranking(s):
Planning Unit Ranking:
Total Points:
 
Plans and Specifications:
Plans and specs have been sent to DOW.
Plans and specs have been reviewed by DOW.
Plans and specs have been sent to PSC.
Plans and specs have been reviewed by PSC.
Economic Impacts
Jobs Created:
Jobs Retained:
MHI Basis:
2025: ACS 2018-2022 5yr Estimates
2024: ACS 2017-2021 5yr Estimates
2023: ACS 2016-2020 5yr Estimates
2022: ACS 2015-2019 5yr Estimates
2021: ACS 2014-2018 5yr Estimates
2020: ACS 2013-2017 5yr Estimates
2019: ACS 2012-2016 5yr Estimates
2018: ACS 2011-2015 5yr Estimates
2017: ACS 2010-2014 5yr Estimates
2016: ACS 2009-2013 5yr Estimates
2015: ACS 2008-2012 5yr Estimates
2014: ACS 2007-2011 5yr Estimates
2013: ACS 2006-2010 5yr Estimates
2012: ACS 2005-2009 5yr Estimates
Demographic Impacts (GIS Census Overlay)
Serviceable
Demographic
Project
Area
Included
Systems
Included
Utilities
Population:
7,753
7,753
Households:
3,437
3,437
MHI:
$53,123
*
$53,123
MHI MOE:
$11,550
$11,550
MOE as Percent:
22%
22%
**NSRL:
1
1
Population and household counts are based on the 2020 Census DEC Redistricting Data (PL 94-171) dataset.
Median Household Income (MHI) Source:
American Community Survey 2018-2022 5 Yr Estimates (Table B19013
*(for the primary system operated by the above listed beneficiary utilities).
MHI MOE = Med HH Income Margin of Error.
** NSRL (Non-Standard Rate Levels):
0 = Greater than or equal to Kentucky MHI (KMHI).
1 = Between 80% KMHI and KMHI (exclusive).
2 = Less than or equal to 80% KMHI.
- KMHI =
$60,183
- 80% KMHI =
$48,146
New Customers
New Residential Customers:
New Commercial Customers:
New Institutional Customers:
New Industrial Customers:
New or Improved Service
Service Demographic
Survey
Based
Census
Overlay*
To Unserved Households:
To Underserved Households:
3,200
To Total Households:
3,200
**Cost Per Household:
$1,281
*
GIS Census block overlay figures are estimates of population and households potentially served by systems and projects based on a proximity analysis of relevant service lines to census block boundaries published for the 2010 SF1 dataset.
**
Cost per household is based on surveyed household counts, not GIS overlay values.
Geographic Impacts
For Project Area
Counties
Lincoln
Legislative Districts
District Name
Legislator
House 080
David Meade
Senate 21
Brandon J. Storm
Congressional 5
Hal Rogers
HUC 10 Watersheds
HUC 10 Code
Watershed Name
0510020504
Upper Dix River
0510020505
Lower Dix River
Geographic Impacts
For Included System(s)
Counties
Boyle
Lincoln
Legislative Districts
District Name
House 054
Daniel Elliott
House 080
David Meade
Senate 12
Amanda Mays Bledsoe
Senate 21
Brandon J. Storm
Congressional 1
James Comer
Congressional 5
Hal Rogers
DW Specific Impacts:
This project relates to a public health emergency.
This project will assist a non-compliant system to achieve compliance.
This project will assist a compliant system to meet future requirements.
This project will provide assistance not compliance related.
This project is necessary to achieve full or partial compliance with a court order, agreed order, or a judicial or administrative consent decree.
Primary system has not received any SDWA Notices of Violation within the previous state fiscal year (July through June).
Primary system has had an action level exceedance (lead concentrations exceed an action level of 15 ppb in more than 10% of customer taps sampled) within the last compliance period.
Primary system has received a lead trigger level exceedance (lead concentrations exceed a trigger level of 10 ppb in more than 10% of customer taps sampled) within the last compliance period.
Project Readiness LSL (Lead Inventory and Lead Service Line Replacement):
Lead Service Line Inventory:
A description of goals to be achieved and products to be created (e.g., electronic or GIS database; customer communication tools) when creating a lead service line inventory procedure, including a proposed timeline for achieving each goal.
Lead Service Line Replacement:
A strategy for informing customers before a LSLR and a template for an agreement with the private property owner to replace the LSL.
A process for documenting all property owners declining replacement of privately owned portion of LSL.
A procedure for customers to flush service lines and premise plumbing of particulate lead.
A proposed plan for conducting LSL replacement utilizing all requested funding.
A funding strategy for conducting LSLRs utilizing all requested funding.
Project Inventory (Mapped Features):
Linear Features:
DOW
Permit ID
Line Type
Purpose
Activity
Size
(in.)
Material
Length
(LF)
KY0690417
WATER LINE: FINISHED
DISTRIBUTION
EXTENSION
6.00
PVC
4,160
KY0690417
WATER LINE: FINISHED
DISTRIBUTION - WATER EFF - LINE WATER LOSS
REHAB - REPLACE PROBLEM LINES
3.00
PVC
301
KY0690417
WATER LINE: FINISHED
DISTRIBUTION - WATER EFF - LINE WATER LOSS
REHAB - REPLACE PROBLEM LINES
6.00
PVC
42,594
KY0690417
WATER LINE: FINISHED
DISTRIBUTION - WATER EFF - LINE WATER LOSS
REHAB - REPLACE PROBLEM LINES
8.00
PVC
12,142
KY0690417
WATER LINE: FINISHED
DISTRIBUTION - WATER EFF - LINE WATER LOSS
REHAB - REPLACE PROBLEM LINES
12.00
PVC
20,028
Total Length
79,225
Administrative Components:
The following administrative components are included in this project:
Planning
Design
Construction
Management
Audits on Record
Associated With Applicant
Audit
Year
Entity Name
Entity
Relationship
2022
Stanford, City of
Parent
2021
Stanford, City of
Parent
2020
Stanford, City of
Parent
Regionalization Components:
Public Water Systems Eliminated:
This project includes the elimination of public water system(s) through merger or acquisition.
Water Treatment Plants Eliminated:
This project includes the elimination of water treatment plant(s).
Supplementation of Raw Water Supply:
This project includes supplementing the existing raw water supply.
Supplementation of Potable Water Supply:
This project includes supplementing the existing potable water supply.
Emergency Only Water Supply:
This project provides emergency only water supply.
Water Source Protection:
This project will preventatively address PFAS or other emerging contaminants of the source water.
This project will address current PFAS or other emerging contaminants of the source water.
This project includes the rehabilitation of a dam or reservoir used primarily for drinking water.
This project includes land acquisition for water source protection.
Water Treatment Components:
This project includes water treatment components.
Water Distribution and Storage Components:
This project includes water distribution and/or storage components.
Water Line Extensions:
This project includes water line extension(s).
Length of extensions:
4,160
LF
Number of new connections:
0
This projects extends service to unserved rural areas.
Redundancy Components:
This project includes emergency power generators for distribution and/or storage activities.
This project includes redundant distribution and/or storage processes.
Finished Water Quality:
This project includes infrastructure to address inadequate water turnover and disinfection byproducts (DBPs).
Service Line Inventory:
This project includes implementation of a service line inventory.
Water Line Replacement:
This project replaces problem water lines (breaks, leaks, or restrictive flows due to age), water lines consisting of lead and/or asbestos-cement (AC), and/or inadequately sized water lines.
Total length of line replacement:
75,065
LF
In-place or in-situ repair medhods will be used in lieu of water line replacement.
This project replaces lead service lines.
Roads Serviced by Line Replacements:
Road Name
LF Serviced
Cs-2035
300
Maxwell Street
300
Portman Avenue (Old High School
300
Sherwood Avenue (2)
340
Helm Street
620
Anderson Heights
850
Brock Drive
900
Oak Street
960
Choctaw Drive
1,000
Wilderness Trail
1,000
Darst Street
1,010
Ridgeway Hubble Road
1,100
High Street
1,300
Houstonville Street
1,300
Lacy Street
1,350
Chickasaw Trail
1,470
Redwood Drive
1,670
Powell Drive Area
1,700
Cutoff Street
1,750
Goshen Road
1,750
Water Street
1,750
Star Avenue
1,840
Pettus Court
1,880
KY642
1,920
US 27 North
2,000
Ridgeway Highland Drive
2,100
Upland Drive
2,360
Lancaster Street
2,600
Sherwood Avenue
2,800
Industrial Park
3,590
Somerset Street
4,200
Wilderness Trail (2)
4,780
US 27 North (2)
5,700
WTP to Somerset Street
17,000
Total LF Serviced
75,490
Water Loss in the Last 12 Months:
The system has experienced the following water loss over the past 12 months:
Water loss volume (MG):
-148.053
Water loss percent:
-100%
This project includes components that addresses or corrects water loss.
Water Storage and Pressure Components:
This project includes the construction of new water tank(s).
This project includes the replacement of existing water tank(s).
This project includes the rehabilitation of existing water tank(s).
This project includes the construction of new pump station(s).
This project includes the rehabilitation of existing pump station(s).
Security:
This project includes security components for water distribution infrastructure.
Green
Infrastructure
Water
Efficiency
Energy
Efficiency
Environmentally
Innovative
Asset
Management
Green Infrastructure:
Green stormwater infrastructure includes a wide array of practices at multiple scales that manage wet weather and that maintains and restores natural hydrology by infiltrating, evapotranspiring and harvesting and using stormwater. On a regional scale, green infrastructure is the preservation and restoration of natural landscape features, such as forests, floodplains, and wetlands, coupled with policies such as infill and redevelopment that reduce overall imperviousness in a watershed. On the local scale, green infrastructure consists of site and neighborhood-specific practices, such as:
Component
Cost
Item 1:
Bioretention
Item 2:
Trees
Item 3:
Green Roofs
Item 4:
Permeable Pavement
Item 5:
Cisterns
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Water Efficiency:
The use of improved technologies and practices to deliver equal or better services with less water. Water efficiency encompasses conservation and reuse efforts, as well as water loss reduction and prevention, to protect water resources for the future. Examples include:
Component
Cost
Item 1:
Installing or retrofitting water efficient devices such as plumbing fixtures and appliances (toilets, showerheads, urinals).
Item 2:
Installing any type of water meter in previously unmetered areas (can include backflow prevention if in conjunction with meter replacement).
Item 3:
Replacing existing broken/malfunctioning water meters with AMR or smart meters, meters with leak detection, backflow prevention.
Item 4:
Retrofitting/adding AMR capabilities or leak equipment to existing meters.
Item 5:
Conducting water utility audits, leak detection studies, and water use efficiency baseline studies, which are reasonably expected to result in a capital project or in a reduction in demand to alleviate the need for additional capital investment.
Item 6:
Developing conservation plans/programs reasonable expected to result in a water conserving capital project or in a reduction in demand to alleviate the need for capital investment.
Item 7:
Recycling and water reuse projects that replace potable sources with non-potable sources (Gray water, condensate, and wastewater effluent reuse systems, extra treatment or distribution costs associated with water reuse).
Item 8:
Retrofit or replacement of existing landscape irrigation systems to more efficient landscape irrigation systems.
Item 9:
Water meter replacement with traditional water meters.*
Item 10:
Distribution pipe replacement or rehabilitation to reduce water loss and prevent water main breaks.*
Item 11:
Storage tank replacement/rehabilitation to reduce water loss.*
Item 12:
New water efficient landscape irrigation system, where there currently is not one.*
Item 13:
Implementation of incentive programs to conserve water such as rebates.
Item 14:
Installing WaterSense labeled products (
https://www.epa.gov/watersense
)
Item 15:
Projects that result from a water efficiency related assessments (such as water audits, leak detection studies, conservation plans, etc.) as long as the assessments adhered to the standard industry practices referenced above.
Item 16:
Distribution system leak detection equipment, portable or permanent.
Item 17:
Automatic flushing systems (portable or permanent).
Item 18:
Pressure reducing valves (PRVs).
Item 19:
Internal plant water reuse (such as backwash water recycling).
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Energy Efficiency:
Energy efficiency is the use of improved technologies and practices to reduce the energy consumption of water projects, use energy in a more efficient way, and/or produce/utilize renewable energy. Examples include:
Component
Cost
Item 1:
Renewable energy projects, which are part of a public health project, such as wind, solar, geothermal, and micro-hydroelectric that provides power to a utility.
Item 2:
Utility-owned or publicly-owned renewable energy projects.
Item 3:
Utility energy management planning, including energy assessments, energy audits, optimization studies, and sub-metering of individual processes to determine high energy use areas.
Item 4:
Energy efficient retrofits, upgrades, or new pumping systems and treatment processes (including variable frequency drives (VFDs).*
Item 5:
Pump refurbishment to optimize pump efficiency.*
Item 6:
Projects that result from an energy efficient related assessment.*
Item 7:
Projects that cost effectively eliminate pumps or pumping stations.*
Item 8:
Projects that achieve the remaining increments of energy efficiency in a system that is already very efficient.*
Item 9:
Upgrade of lighting to energy efficient sources.*
Item 10:
Automated and remote control systems (SCADA) that achieve substantial energy savings.*
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Environmentally Innovative Projects:
Environmentally innovative projects include those that demonstrate new and/or innovative approaches to delivering services or managing water resources in a more sustainable way. Examples include:
Component
Cost
Item 1:
Total integrated water resources management planning, or other planning framework where project life cycle costs are minimized, which enables communities to adopt more efficient and cost-effective infrastructure solutions.
Item 2:
Plans to improve water quantity and quality associated with water system technical, financial, and managerial capacity.
Item 3:
Source water protection planning (delineation, monitoring, modeling).
Item 4:
Planning activities to prepare for adaptation to the long-term effects of climate change and/or extreme weather.
Item 5:
Utility sustainability plan consistent with EPA’s sustainability policy.
Item 6:
Greenhouse gas inventory or mitigation plan and submission of a GHG inventory to a registry as long as it is being done for an SRF eligible facility.
Item 7:
Construction of US Building Council LEED certified buildings, or renovation of an existing building.
Item 8:
Projects that significantly reduce or eliminate the use of chemicals in water treatment.*
Item 9:
Treatment technologies or approaches that significantly reduce the volume of residuals, minimize the generation of residuals, or lower the amount of chemicals in the residuals.*
Item 10:
Trenchless or low impact construction technology.*
Item 11:
Using recycled materials or re-using materials on-site.*
Item 12:
Educational activities and demonstration projects for water or energy efficiency (such as rain gardens).*
Item 13:
Projects that achieve the goals/objectives of utility asset management plans*
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Asset Management:
If a category is selected, the applicant must provide supporting documentation in PDF format to substantiate claims.
Asset Management Components
Last Rate Adjustment Date:
07.01.2017
Download Fee Schedule
Rate Adjustment Age (months):
78
System’s monthly water bill, based on 4,000 gallons, as a percentage of MHI:
0.49%
The system has an Asset Management Plan (AMP).
The system(s) involved in this project have specifically allocated funds for the rehabilitation and replacement of aging and deteriorating infrastructure.
If any box(es) above are checked, please describe each below.
Activity
Date
Profile Created:
10.12.2015
Profile Last Modified:
05.07.2021
General Info Last Modified:
05.07.2021
Narrative Last Modified:
10.14.2016
Admin Info Last Modified:
09.27.2016
Budget Info Last Modified:
09.27.2016
Impacts Info Last Modified:
12.07.2016
Plans & Specs Info Last Modified:
Components Info Last Modified:
10.12.2015
GIS Last Modified:
10.12.2016
The profile is complete.
Privacy
|
Security
|
Disclaimer
|
Accessibility Statement
Copyright ©
2024
Kentucky Infrastructure Authority