Kentucky WRIS Portal
About Us
Loan Programs
Loan Calculator
WRIS
Internet Mapping
WRIS Portal
System Data
Project Profile Data
Cleaner Water Program Funding
SRF Project Funding
Area Water Management Planning Councils
Downloadable Reports
Water Management Coordinators
ADD GIS Staff
Legislation
& Regulations
WRIS Contact
Don Schierer
502-892-3486
E-mail
Working...
Drinking Water Project Profile:
This profile is read-only (constructed or withdrawn).
Project Title:
Wolfpit Industrial Park Water Infrastructure
Project Number:
WX21195042
AWMPC:
BSADD
Funding Status:
Fully Funded
Date Approved by AWMPC:
12.17.2019
Project Status:
Constructed
Primary County:
Pike
Project Schedule:
Constructed
Planning Unit:
Pike
E-ClearingHouse SAI:
KY202003110244
ECH Status:
Approved
Primary System:
KY0980575
Mountain Water District
ADD WMC Contact:
Matt Scofield
Legal Applicant:
Pike County Fiscal Court
Entity Type:
County Fiscal Court
Narrative
Applicant
Administration
Budget
& Schedule
Impacts
Components
Sustainable
Infrastructure
Audit
Project Title:
Wolfpit Industrial Park Water Infrastructure
Project Description:
Install water service and storage at the Wolfpit Industrial site in Pike County. Approximately 3,300 feet to the north of the Wolfpit Industrial Site, there is a graded connection drive between the KY 3174 (new -US 460) and Wolfpit Branch Road. The connection to the existing 4 inch ductile iron water line will be made at this location with a proposed 4 inch ductile iron water line. If Mountain Water District would accept the proposed 4 inch water line on the 2:1 fill slope of the KY 3174 (new -US 460), then approximately 2,500 linear feet of 4 inch pipe could be eliminated. A 160 linear feet jack and bore (8 inch steel casing with 4 inch carrier pipe) will be required to cross KY 3174 (new -US 460). Approximately 3,600 linear feet of proposed 4 inch ductile iron water line will be placed in the US 460 right of way. Approximately 3,200 linear feet of this water line will be placed in the ditch line of KY 3174 (new -US 460) adjacent to the rock cut. Approximately 3,000 linear feet of 4 inch water line will be placed along the existing Wolfpit Industrial Site Access Road and “T” into the proposed 8 inch water line connecting to the proposed water tank and industrial park tenants. This 8 inch water line is necessary for fire protection purposes. The existing Wolfpit Branch Road 10,000 gallon water storage tank will be removed from the system and a new 200,000 gallon storage tank will be installed at the site. The on-site water main connecting the proposed water storage tank to the industries will need to be an 8 inch water line to meet the fire flow demand and pressure requirements. A proposed 8 inch site water distribution line will allow for firm fire flow of over 1800 gpm at near empty tank water elevation. An additional storage tank would need to be added to meet the 2 hour time requirement. The existing 2 inch water line interconnect between the existing 8 inch water line in Wolfpit and the existing 4 inch water line at Wolfpit Branch Road is recommended to be replaced with a 6 inch water line to improve flow and pressure conditions within the water system. Booster pump flow improvements with the existing 2 inch water line interconnect would be limited to approximately 35 gpm (with booster pump improvements) due to desired minimum suction line pressures.
Need For Project:
Briefly describe how this project promotes public health or achieves and/or maintains compliance with the Clean Water Act or Safe Drinking Water Act:
The site is being developed by the Pike County IDEA in order to attract businesses to the area. Without proper infrastructure development the property has no way of attracting businesses to the site.
Project Alternatives:
Alternate A:
Note: If project includes the construction of a new treatment plant or upgrade to existing plant, please explain regionalization options here.
Do nothing.
Alternate B:
Entity Information
Entity Type:
County Fiscal Court
Entity Name:
Pike County Fiscal Court
PSC Group ID:
Office EMail:
ray.jones@ky.gov
Web URL:
www.pikecountychamber.org
Office Phone:
606-432-6247
Fax:
606-432-6242
Entity Address Information
Mail Address
Physical Address
Address Line 1:
146 Main St
Address Line 2:
City, State Zip:
Pikeville
,
KY
41501
Entity Contact Information
Contact Type
Name
Title
EMail
Phone
Cell
Business Contact:
Ray Jones II
County Judge Executive
ray.jones@ky.gov
606-432-6247
606-794-7281
Authorized Official:
Ray Jones II
County Judge Executive
ray.jones@ky.gov
606-432-6247
606-794-7281
Information Source:
Kentucky Department for Local Government
Date Last Modified:
04.04.2026
Project Administrator (PA) Information
Name:
Sharon Hall
Title:
Grants Administrator
Organization:
Pike County Fiscal Court
EMail:
sharon.hall@ky.gov
Phone:
606-432-6369
Fax:
Address Line 1:
146 Main St
Address Line 2:
City, State Zip:
Pikeville
,
KY
41501
Applicant Contact (AC) Information
Name:
Sharon Hall
Title:
Grants Administrator
Organization:
Pike County Fiscal Court
EMail:
sharon.hall@ky.gov
Phone:
606-432-6369
Fax:
Address Line 1:
146 Main St
Address Line 2:
City, State Zip:
Pikeville
,
KY
41501
Project Engineer (PE) Information
This project requires a licensed Professional Engineer.
A Professional Engineer has been procured for this project.
Licensed Engineer Information
License Number:
PE 16975
PE Name:
Kevin Fred Damron
Firm Name:
Palmer Engineering Co., Inc.
Address Type:
Work
Address Line 1:
Ky. Dept. of Transportation
Address Line 2:
P. O. Box 2468
Address Line 3:
City, State Zip:
Pikeville
,
KY
41502
License Status:
Current
Disciplinary Actions:
No
Issue Date:
07.18.1991
Expiration Date:
06.30.2027
Phone:
859∙744∙1218
Fax:
EMail:
dlindeman@palmernet.com
Engineering Firm Information
Permit Number:
6
Firm Name:
Palmer Engineering Co., Inc.
Phone:
859∙744∙1218
Fax:
859∙744∙1266
Web URL:
http://www.palmernet.com/
E-Mail:
dlindeman@palmernet.com
Address Line 1:
P.O. Box 747
Address Line 2:
City, State Zip:
Winchester
,
KY
40392
Issue Date:
03.02.1993
Expir. Date:
12.31.2026
Permit
Status
Current
Disciplinary
Actions
No
Kevin Fred Damron
Current
16,975
2,341
Estimated Budget
As-Bid Budget
Project Cost Categories
Cost Category
Cost
Administrative Expenses:
$26,633
Legal Expenses:
Land, Appraisals, Easements:
Relocation Expense & Payments:
Planning:
Engineering Fees - Design:
$95,879
Engineering Fees - Construction:
Engineering Fees - Inspection:
Engineering Fees - Other:
$79,899
Construction:
$1,065,320
Equipment:
Miscellaneous:
Contingencies:
$106,532
Total Project Cost:
$1,374,263
Construction Cost Categories
Cost Category
Cost
Treatment:
Transmission and Distribution:
$737,820
Lead Remediation:
Source:
Storage:
$327,500
Purchase of Systems:
Restructuring:
Land Acquisition:
Non-Categorized :
Total Construction Cost:
$1,065,320
Total Sustainability Costs:
Note:
Sustainability costs are included within other costs
reported in this tab. This breakout, when provided,
is for SRF review purposes.
Project Funding Sources
Total Project Cost:
$1,374,263
Total Committed Funding:
$1,374,263
Funding Gap:
Fully Funded
Funding Source
Loan or
Grant ID
Fiscal
Year
Amount
Status
Applicable
Date
Local
2020
$274,853
Committed
05-27-2021
EDA
2020
$1,099,410
Committed
05-27-2021
Total Committed
$1,374,263
Funding Source Notes
Estimated Project Schedule
Estimated Environmental Review Submittal Date:
Estimated Bid Date:
09.15.2020
Estimated Construction Start Date:
11.01.2020
Estimated Construction Completion Date:
08.01.2021
The following systems are beneficiaries of this project:
KY0980575
Mountain Water District
Checked box indicates primary system for this project.
Project Ranking by AWMPC:
Regional Ranking(s):
Planning Unit Ranking:
Total Points:
 
Plans and Specifications:
Plans and specs have been sent to DOW.
Plans and specs have been reviewed by DOW.
Plans and specs have been sent to PSC.
Plans and specs have been reviewed by PSC.
Economic Impacts
Jobs Created:
Jobs Retained:
MHI Basis:
2026: ACS 2019-2023 5yr Estimates
2025: ACS 2018-2022 5yr Estimates
2024: ACS 2017-2021 5yr Estimates
2023: ACS 2016-2020 5yr Estimates
2022: ACS 2015-2019 5yr Estimates
2021: ACS 2014-2018 5yr Estimates
2020: ACS 2013-2017 5yr Estimates
2019: ACS 2012-2016 5yr Estimates
2018: ACS 2011-2015 5yr Estimates
2017: ACS 2010-2014 5yr Estimates
2016: ACS 2009-2013 5yr Estimates
2015: ACS 2008-2012 5yr Estimates
2014: ACS 2007-2011 5yr Estimates
2013: ACS 2006-2010 5yr Estimates
2012: ACS 2005-2009 5yr Estimates
Demographic Impacts (GIS Census Overlay)
Serviceable
Demographic
Project
Area
Included
Systems
Included
Utilities
Population:
Households:
MHI:
*
MHI MOE:
MOE as Percent:
**NSRL:
0
Population and household counts are based on the 2020 Census DEC Redistricting Data (PL 94-171) dataset.
Median Household Income (MHI) Source: *(for the primary system operated by the above listed beneficiary utilities).
MHI MOE = Med HH Income Margin of Error.
** NSRL (Non-Standard Rate Levels):
0 = Greater than or equal to Kentucky MHI (KMHI).
1 = Between 80% KMHI and KMHI (exclusive).
2 = Less than or equal to 80% KMHI.
- KMHI =
- 80% KMHI =
New Customers
New Residential Customers:
New Commercial Customers:
New Institutional Customers:
New Industrial Customers:
New or Improved Service
Service Demographic
Survey
Based
Census
Overlay*
To Unserved Households:
To Underserved Households:
To Total Households:
**Cost Per Household:
*
GIS Census block overlay figures are estimates of population and households potentially served by systems and projects based on a proximity analysis of relevant service lines to census block boundaries published for the 2010 SF1 dataset.
**
Cost per household is based on surveyed household counts, not GIS overlay values.
Geographic Impacts
For Project Area
Counties
Pike
Legislative Districts
District Name
Legislator
House 092
John Blanton
Senate 31
Phillip Wheeler
Congressional 5
Hal Rogers
HUC 10 Watersheds
HUC 10 Code
Watershed Name
0507020207
Russell Fork-Levisa Fork
Geographic Impacts
For Included System(s)
Counties
Letcher
Pike
Legislative Districts
District Name
House 092
John Blanton
House 094
Mitch Whitaker
House 095
Ashley Tackett Laferty
House 097
Bobby McCool
Senate 29
Scott Madon
Senate 31
Phillip Wheeler
Congressional 5
Hal Rogers
DW Specific Impacts:
This project relates to a public health emergency.
This project will assist a non-compliant system to achieve compliance.
This project will assist a compliant system to meet future requirements.
This project will provide assistance not compliance related.
This project is necessary to achieve full or partial compliance with a court order, agreed order, or a judicial or administrative consent decree.
Primary system has not received any SDWA Notices of Violation within the previous state fiscal year (July through June).
Primary system has had an action level exceedance (lead concentrations exceed an action level of 15 ppb in more than 10% of customer taps sampled) within the last compliance period.
Primary system has received a lead trigger level exceedance (lead concentrations exceed a trigger level of 10 ppb in more than 10% of customer taps sampled) within the last compliance period.
Project Readiness LSL (Lead Inventory and Lead Service Line Replacement):
Lead Service Line Inventory:
A description of goals to be achieved and products to be created (e.g., electronic or GIS database; customer communication tools) when creating a lead service line inventory procedure, including a proposed timeline for achieving each goal.
Lead Service Line Replacement:
A strategy for informing customers before a LSLR and a template for an agreement with the private property owner to replace the LSL.
A process for documenting all property owners declining replacement of privately owned portion of LSL.
A procedure for customers to flush service lines and premise plumbing of particulate lead.
A proposed plan for conducting LSL replacement utilizing all requested funding.
A funding strategy for conducting LSLRs utilizing all requested funding.
Project Inventory (Mapped Features):
Point Features:
DOW
PermitID
Count
Feature Type
Purpose
Status
Existing
Capacity
Proposed
Capacity
Units
KY0980575
1
HYDRANT
FIRE PROTECTION.
EA
KY0980575
1
PUMP STATION
PUMP - FILL TANK
REHAB
35.00
50.00
GPM
KY0980575
1
WATER TANK
TANK - INCREASE STORAGE
NEW
200,000.00
GALLONS
KY0980575
1
WATER TANK
TANK - INCREASE STORAGE
REPLACE - DECOMMISSION
10,000.00
GALLONS
Linear Features:
DOW
Permit ID
Line Type
Purpose
Activity
Size
(in.)
Material
Length
(LF)
KY0980575
WATER LINE: FINISHED
DISTRIBUTION
EXTENSION
4.00
DUCTILE IRON
6,475
KY0980575
WATER LINE: FINISHED
DISTRIBUTION
EXTENSION
8.00
DUCTILE IRON
2,652
Total Length
9,127
Administrative Components:
The following administrative components are included in this project:
Planning
Design
Construction
Management
Note: There are no audits on record associated with the applicant entity.
Regionalization Components:
Public Water Systems Eliminated:
This project includes the elimination of public water system(s) through merger or acquisition.
Water Treatment Plants Eliminated:
This project includes the elimination of water treatment plant(s).
Supplementation of Raw Water Supply:
This project includes supplementing the existing raw water supply.
Supplementation of Potable Water Supply:
This project includes supplementing the existing potable water supply.
Emergency Only Water Supply:
This project provides emergency only water supply.
Water Source Protection:
This project will preventatively address PFAS or other emerging contaminants of the source water.
This project will address current PFAS or other emerging contaminants of the source water.
This project includes the rehabilitation of a dam or reservoir used primarily for drinking water.
This project includes land acquisition for water source protection.
Water Treatment Components:
This project includes water treatment components.
Water Distribution and Storage Components:
This project includes water distribution and/or storage components.
Water Line Extensions:
This project includes water line extension(s).
Length of extensions:
9,127
LF
Number of new connections:
0
This projects extends service to unserved rural areas.
Redundancy Components:
This project includes emergency power generators for distribution and/or storage activities.
This project includes redundant distribution and/or storage processes.
Finished Water Quality:
This project includes infrastructure to address inadequate water turnover and disinfection byproducts (DBPs).
Service Line Inventory:
This project includes implementation of a service line inventory.
Water Line Replacement:
This project replaces problem water lines (breaks, leaks, or restrictive flows due to age), water lines consisting of lead and/or asbestos-cement (AC), and/or inadequately sized water lines.
In-place or in-situ repair medhods will be used in lieu of water line replacement.
This project replaces lead service lines.
Water Loss in the Last 12 Months:
The system has experienced the following water loss over the past 12 months:
Water loss volume (MG):
304.104
Water loss percent:
27%
Water Storage and Pressure Components:
This project includes the construction of new water tank(s).
Number of new tank(s):
1
Proposed storage capacity of new tank(s):
gallons.
Reason for increased storage:
This project includes the replacement of existing water tank(s).
This project includes the rehabilitation of existing water tank(s).
This project includes the construction of new pump station(s).
This project includes the rehabilitation of existing pump station(s).
Number of rehabilitated pump stations:
1
Security:
This project includes security components for water distribution infrastructure.
Green
Infrastructure
Water
Efficiency
Energy
Efficiency
Environmentally
Innovative
Asset
Management
Green Infrastructure:
Green stormwater infrastructure includes a wide array of practices at multiple scales that manage wet weather and that maintains and restores natural hydrology by infiltrating, evapotranspiring and harvesting and using stormwater. On a regional scale, green infrastructure is the preservation and restoration of natural landscape features, such as forests, floodplains, and wetlands, coupled with policies such as infill and redevelopment that reduce overall imperviousness in a watershed. On the local scale, green infrastructure consists of site and neighborhood-specific practices, such as:
Component
Cost
Item 1:
Bioretention
Item 2:
Trees
Item 3:
Green Roofs
Item 4:
Permeable Pavement
Item 5:
Cisterns
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Water Efficiency:
The use of improved technologies and practices to deliver equal or better services with less water. Water efficiency encompasses conservation and reuse efforts, as well as water loss reduction and prevention, to protect water resources for the future. Examples include:
Component
Cost
Item 1:
Installing or retrofitting water efficient devices such as plumbing fixtures and appliances (toilets, showerheads, urinals).
Item 2:
Installing any type of water meter in previously unmetered areas (can include backflow prevention if in conjunction with meter replacement).
Item 3:
Replacing existing broken/malfunctioning water meters with AMR or smart meters, meters with leak detection, backflow prevention.
Item 4:
Retrofitting/adding AMR capabilities or leak equipment to existing meters.
Item 5:
Conducting water utility audits, leak detection studies, and water use efficiency baseline studies, which are reasonably expected to result in a capital project or in a reduction in demand to alleviate the need for additional capital investment.
Item 6:
Developing conservation plans/programs reasonable expected to result in a water conserving capital project or in a reduction in demand to alleviate the need for capital investment.
Item 7:
Recycling and water reuse projects that replace potable sources with non-potable sources (Gray water, condensate, and wastewater effluent reuse systems, extra treatment or distribution costs associated with water reuse).
Item 8:
Retrofit or replacement of existing landscape irrigation systems to more efficient landscape irrigation systems.
Item 9:
Water meter replacement with traditional water meters.*
Item 10:
Distribution pipe replacement or rehabilitation to reduce water loss and prevent water main breaks.*
Item 11:
Storage tank replacement/rehabilitation to reduce water loss.*
Item 12:
New water efficient landscape irrigation system, where there currently is not one.*
Item 13:
Implementation of incentive programs to conserve water such as rebates.
Item 14:
Installing WaterSense labeled products (
https://www.epa.gov/watersense
)
Item 15:
Projects that result from a water efficiency related assessments (such as water audits, leak detection studies, conservation plans, etc.) as long as the assessments adhered to the standard industry practices referenced above.
Item 16:
Distribution system leak detection equipment, portable or permanent.
Item 17:
Automatic flushing systems (portable or permanent).
Item 18:
Pressure reducing valves (PRVs).
Item 19:
Internal plant water reuse (such as backwash water recycling).
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Energy Efficiency:
Energy efficiency is the use of improved technologies and practices to reduce the energy consumption of water projects, use energy in a more efficient way, and/or produce/utilize renewable energy. Examples include:
Component
Cost
Item 1:
Renewable energy projects, which are part of a public health project, such as wind, solar, geothermal, and micro-hydroelectric that provides power to a utility.
Item 2:
Utility-owned or publicly-owned renewable energy projects.
Item 3:
Utility energy management planning, including energy assessments, energy audits, optimization studies, and sub-metering of individual processes to determine high energy use areas.
Item 4:
Energy efficient retrofits, upgrades, or new pumping systems and treatment processes (including variable frequency drives (VFDs).*
Item 5:
Pump refurbishment to optimize pump efficiency.*
Item 6:
Projects that result from an energy efficient related assessment.*
Item 7:
Projects that cost effectively eliminate pumps or pumping stations.*
Item 8:
Projects that achieve the remaining increments of energy efficiency in a system that is already very efficient.*
Item 9:
Upgrade of lighting to energy efficient sources.*
Item 10:
Automated and remote control systems (SCADA) that achieve substantial energy savings.*
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Environmentally Innovative Projects:
Environmentally innovative projects include those that demonstrate new and/or innovative approaches to delivering services or managing water resources in a more sustainable way. Examples include:
Component
Cost
Item 1:
Total integrated water resources management planning, or other planning framework where project life cycle costs are minimized, which enables communities to adopt more efficient and cost-effective infrastructure solutions.
Item 2:
Plans to improve water quantity and quality associated with water system technical, financial, and managerial capacity.
Item 3:
Source water protection planning (delineation, monitoring, modeling).
Item 4:
Planning activities to prepare for adaptation to the long-term effects of climate change and/or extreme weather.
Item 5:
Utility sustainability plan consistent with EPA’s sustainability policy.
Item 6:
Greenhouse gas inventory or mitigation plan and submission of a GHG inventory to a registry as long as it is being done for an SRF eligible facility.
Item 7:
Construction of US Building Council LEED certified buildings, or renovation of an existing building.
Item 8:
Projects that significantly reduce or eliminate the use of chemicals in water treatment.*
Item 9:
Treatment technologies or approaches that significantly reduce the volume of residuals, minimize the generation of residuals, or lower the amount of chemicals in the residuals.*
Item 10:
Trenchless or low impact construction technology.*
Item 11:
Using recycled materials or re-using materials on-site.*
Item 12:
Educational activities and demonstration projects for water or energy efficiency (such as rain gardens).*
Item 13:
Projects that achieve the goals/objectives of utility asset management plans*
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Asset Management:
If a category is selected, the applicant must provide supporting documentation in PDF format to substantiate claims.
Asset Management Components
Last Rate Adjustment Date:
10.31.2023
Download Fee Schedule
Rate Adjustment Age (months):
27
System’s monthly water bill, based on 4,000 gallons, as a percentage of MHI:
1.56%
The system has an Asset Management Plan (AMP).
The system(s) involved in this project have specifically allocated funds for the rehabilitation and replacement of aging and deteriorating infrastructure.
If any box(es) above are checked, please describe each below.
Activity
Date
Profile Created:
12.19.2018
Profile Last Modified:
05.13.2024
General Info Last Modified:
05.13.2024
Narrative Last Modified:
03.12.2020
Admin Info Last Modified:
08.04.2022
Budget Info Last Modified:
02.04.2020
Impacts Info Last Modified:
Plans & Specs Info Last Modified:
Components Info Last Modified:
02.04.2020
GIS Last Modified:
06.10.2021
Deficiencies found in Budget and Schedule Tab:
Funding Sources:
− Warning: The construction start date is not within the normal expected threshold for projects requesting SRF funding.
Deficiencies found in Impacts Tab:
Demographic Impacts Section:
− Warning: There are no surveyed household counts for this project.
Deficiencies found in Components Tab:
Water Distribution:
− Increased Storage Reason is a required input.
Privacy
|
Security
|
Disclaimer
|
Accessibility Statement
Copyright ©
2026
Kentucky Infrastructure Authority