Kentucky WRIS Portal
About Us
Loan Programs
Loan Calculator
WRIS
Internet Mapping
WRIS Portal
System Data
Project Profile Data
Cleaner Water Program Funding
SRF Project Funding
Area Water Management Planning Councils
Downloadable Reports
Water Management Coordinators
ADD GIS Staff
Legislation
& Regulations
WRIS Contact
Don Schierer
502-892-3486
E-mail
Working...
Clean Water Project Profile:
This profile is read-only (constructed or withdrawn).
Project Title:
Grinder Pump Replacement, Line Extension and Equipment Purchase Project
Project Number:
SX21153003
AWMPC:
BSADD
Funding Status:
Fully Funded
Date Approved by AWMPC:
09.22.2015
Project Status:
Constructed
Primary County:
Magoffin
Project Schedule:
Constructed
Planning Unit:
Magoffin
E-ClearingHouse SAI:
KY201512071386
ECH Status:
Approved
Primary System:
KY0104540
Salyersville Water Works
ADD WMC Contact:
Matt Scofield
Legal Applicant:
Salyersville Water Works
Entity Type:
Municipal Utility, Board, or Commission
Narrative
Applicant
Administration
Budget
& Schedule
Impacts
Components
Sustainable
Infrastructure
Audit
Project Title:
Grinder Pump Replacement, Line Extension and Equipment Purchase Project
Project Description:
This project would replace all grinder pumps in the system. Salyersville Water Works has approximately 527 existing grinder pumps. The utility is currently experiencing grinder pump failures. The existing pumps were installed between the years of 2005 and 2008. The project would extend existing service approximately 5000ft on KY Route 30. The service line will pick up 13 households. Salyersville Water Works will also purchase a mini excavator. this will include I/I also
Need For Project:
Briefly describe how this project promotes public health or achieves and/or maintains compliance with the Clean Water Act or Safe Drinking Water Act:
The City of Salyersville operates a sewer collection and treatment system for the City of Salyersville and for some County residents. Based on the last Asset Inventory the system has 527 grinder units. The 527 units were installed between 2005 and 2008. Existing literature on the units predicts an average design life of 10 years. The manufacturer says that some units have been reported to last 20 years. The utility maintenance department reports that O&M costs for the units are approaching $5,000 per month --- which would suggest that the true design life is fairly close to 10 years. The utility believes that capitalizing the expense and replacing aging units (with a full 5 year warranty) will save operations dollars in the long run. Due to the age of the existing grinder pumps, the potential for raw sewage seeping into ground water is prevalent.
Project Alternatives:
Alternate A:
Note: If project includes the construction of a new treatment plant or upgrade to existing plant, please explain regionalization options here.
Alternative to this project is to replace as needed basis, this alternative is not cost effective.
Alternate B:
Entity Information
Entity Type:
Municipal Utility, Board, or Commission
Entity Name:
Salyersville Water Works
PSC Group ID:
8806000
Office EMail:
nora.howard22@yahoo.com
Web URL:
Office Phone:
606-349-3743
Fax:
606-349-3752
Entity Address Information
Mail Address
Physical Address
Address Line 1:
182 College St
182 College St
Address Line 2:
City, State Zip:
Salyersville
,
KY
41465
Salyersville
,
KY
41465
Entity Contact Information
Contact Type
Name
Title
EMail
Phone
Cell
Business Contact:
Nora Howard
Superintendent
nora.howard22@yahoo.com
606-349-3743
Authorized Official:
Stanley Howard
Mayor
mayorstanleyhoward@gmail.com
606-349-2409
Information Source:
Kentucky Infrastructure Authority
Date Last Modified:
10.27.2023
Project Administrator (PA) Information
Name:
Brandon Montgomery
Title:
Water and Wastewater Utilities Coordinator
Organization:
Big Sandy Area Development District
EMail:
brandon.montgomery@bigsandy.org
Phone:
606-886-2374
Fax:
606-886-3382
Address Line 1:
Big Sandy Area Development District
Address Line 2:
100 Resource Dr
City, State Zip:
Prestonsburg
,
KY
41653
Applicant Contact (AC) Information
Name:
Gary Rowe
Title:
Superintendent
Organization:
Salyersville Water Works
EMail:
waterboyky@hotmail.com
Phone:
606-349-3743
Fax:
Address Line 1:
401 College St
Address Line 2:
City, State Zip:
Salyersville
,
KY
41465
Project Engineer (PE) Information
This project requires a licensed Professional Engineer.
A Professional Engineer has been procured for this project.
Licensed Engineer Information
License Number:
PE 13515
PE Name:
Kevin Michael Howard
Firm Name:
Summit Engineering, Inc.
Address Type:
Work
Address Line 1:
Summit Engineering, Inc.
Address Line 2:
131 Summit Drive
Address Line 3:
City, State Zip:
Pikeville
,
KY
41501
License Status:
Current
Disciplinary Actions:
No
Issue Date:
07.21.1983
Expiration Date:
06.30.2025
Phone:
859∙264∙9860
Fax:
EMail:
khoward@summit-engr.com
Engineering Firm Information
Permit Number:
71
Firm Name:
Summit Engineering, Inc.
Phone:
859∙264∙9860
Fax:
859∙264∙9860
Web URL:
http://www.summit-ae.com/
E-Mail:
mhill@summit-ae.com
Address Line 1:
3205 Summit Square Place
Address Line 2:
City, State Zip:
Lexington
,
KY
40509
Issue Date:
03.02.1993
Expir. Date:
12.31.2024
Permit
Status
Current
Disciplinary
Actions
No
Kevin Michael Howard
Current
13,515
2,451
Estimated Budget
As-Bid Budget
Project Cost Categories
Cost Category
Cost
Administrative Expenses:
$10,000
Legal Expenses:
$3,500
Land, Appraisals, Easements:
Relocation Expense & Payments:
Planning:
Engineering Fees - Design:
Engineering Fees - Construction:
Engineering Fees - Inspection:
Engineering Fees - Other:
$19,500
Construction:
$484,300
Equipment:
$45,000
Miscellaneous:
Contingencies:
$52,930
Total Project Cost:
$615,230
Construction Cost Categories
Cost Category
Cost
WWTP Secondary Portion:
WWTP Advanced Portion:
Inflow & Infiltration Correction:
Major Sewer Rehabilitation:
Collector Sewers:
$9,500
Interceptor Sewers, including Pump Stations:
Combined Sewer Overflow Correction:
NPS Urban:
Non-Categorized Cost:
$474,800
Total Construction Cost:
$484,300
Total Sustainability Costs:
Note:
Sustainability costs are included within other costs
reported in this tab. This breakout, when provided,
is for SRF review purposes.
Project Funding Sources
Total Project Cost:
$615,230
Total Committed Funding:
$615,230
Funding Gap:
Fully Funded
Funding Source
Loan or
Grant ID
Fiscal
Year
Amount
Status
Applicable
Date
KIA SRF Fund A Loan (CW)
A16-077
2016
$615,230
Committed
04-07-2016
KIA SRF Fund A Loan (CW)
2019
$615,230
Bypassed
Total Committed
$615,230
Funding Source Notes
Estimated Project Schedule
Facility Plan Approval Date:
Estimated Environmental Review Submittal Date:
Estimated Bid Date:
04.01.2018
Estimated Construction Start Date:
06.01.2018
Estimated Construction Completion Date:
06.01.2019
The following systems are beneficiaries of this project:
KY0104540
Salyersville Water Works
Checked box indicates primary system for this project.
Project Ranking by AWMPC:
Regional Ranking(s):
Planning Unit Ranking:
Total Points:
 
Plans and Specifications:
Plans and specs have been sent to DOW.
Plans and specs have been reviewed by DOW.
Plans and specs have been sent to PSC.
Plans and specs have been reviewed by PSC.
Economic Impacts
Jobs Created:
Jobs Retained:
2
MHI Basis:
2025: ACS 2018-2022 5yr Estimates
2024: ACS 2017-2021 5yr Estimates
2023: ACS 2016-2020 5yr Estimates
2022: ACS 2015-2019 5yr Estimates
2021: ACS 2014-2018 5yr Estimates
2020: ACS 2013-2017 5yr Estimates
2019: ACS 2012-2016 5yr Estimates
2018: ACS 2011-2015 5yr Estimates
2017: ACS 2010-2014 5yr Estimates
2016: ACS 2009-2013 5yr Estimates
2015: ACS 2008-2012 5yr Estimates
2014: ACS 2007-2011 5yr Estimates
2013: ACS 2006-2010 5yr Estimates
2012: ACS 2005-2009 5yr Estimates
Demographic Impacts (GIS Census Overlay)
Serviceable
Demographic
Project
Area
Included
Systems
Included
Utilities
Population:
3,037
3,037
Households:
1,409
1,409
MHI:
$31,578
*
$31,578
MHI MOE:
$9,365
$9,365
MOE as Percent:
30%
30%
**NSRL:
2
2
Population and household counts are based on the 2020 Census DEC Redistricting Data (PL 94-171) dataset.
Median Household Income (MHI) Source:
American Community Survey 2018-2022 5 Yr Estimates (Table B19013
*(for the primary system operated by the above listed beneficiary utilities).
MHI MOE = Med HH Income Margin of Error.
** NSRL (Non-Standard Rate Levels):
0 = Greater than or equal to Kentucky MHI (KMHI).
1 = Between 80% KMHI and KMHI (exclusive).
2 = Less than or equal to 80% KMHI.
- KMHI =
$60,183
- 80% KMHI =
$48,146
New Customers
New Residential Customers:
13
New Commercial Customers:
New Institutional Customers:
New Industrial Customers:
New or Improved Service
Service Demographic
Survey
Based
Census
Overlay*
To Unserved Households:
13
To Underserved Households:
527
To Total Households:
540
**Cost Per Household:
$1,139
*
GIS Census block overlay figures are estimates of population and households potentially served by systems and projects based on a proximity analysis of relevant service lines to census block boundaries published for the 2010 SF1 dataset.
**
Cost per household is based on surveyed household counts, not GIS overlay values.
Geographic Impacts
For Project Area
Counties
Magoffin
Legislative Districts
District Name
Legislator
House 092
John Blanton
Senate 30
Brandon Smith
Congressional 5
Hal Rogers
Groundwater
Sensitivity
Zones
3
HUC 10 Watersheds
HUC 10 Code
Watershed Name
0510010101
Headwaters Licking River
Potential Impaired Watershed Designations
303d
305b
Priority
Watershed
Special
Use Waters
Exceptional
Use Waters
Yes
Yes
No
No
No
Note:
Impaired Watershed Designations only indicate that mapped components for this project lie within a HUC-12 watershed boundary containing impaired waterbody features. An affirmative indication for any designation will require a detailed analysis of the project to determine if any of the proposed project components will actually have a positive impact on the relevant impaired features.
Geographic Impacts
For Included System(s)
Counties
Magoffin
Legislative Districts
District Name
House 092
John Blanton
Senate 30
Brandon Smith
Congressional 5
Hal Rogers
CW Specific Impacts:
Wastewater Volumes (MGD):
For this project:
For included system(s):
0.680
Reduced by this project:
Other CW Specific Impacts:
This project provides regionalization and/or consolidation of wastewater treatment systems.
This project will eliminate a package treatment plant that is more than 25 years old.
This project will eliminate a package treatment plant that has received notices of violations within the last two state fiscal years (July through June).
This project includes an on-site mound, and/or decentralized WW treatment system.
This project is necessary to achieve full or partial compliance with a court order, agreed order, or a judicial or administrative consent decree.
Primary system has not received any CWA Notices of Violation within the previous state fiscal year (July through June).
This project is consistent with the approved facility plan.
This project will have a positive impact on drinking water sources within a 5 mile radius.
Drinking water sources impacted by this project:
Licking River
Planning Needs:
Combined Sewer Overflow (CSO) Correction.
Sanitary Sewer Overflow (SSO) Correction.
Replacement or Rehabilitation of Aging Infrastructure.
New Treatment Plant.
New Collector Sewers and Appurtenances.
Decentralized Wastewater Treatment Systems.
Upgrade to Advanced Treatment.
This project addresses PFAS or other emerging contaminants.
Rehab/Upgrade/Expansion of Existing Treatment Plant.
New Interceptor Sewers and Appurtenances.
Stormwater Control.
Non-Point Source (NPS) Pollution Control.
Recycled Water Distribution.
Planning
Other (specify):
Project Inventory (Mapped Features):
Point Features:
DOW
PermitID
Count
FeatureType
Purpose
Status
Existing
Capacity
Proposed
Capacity
Units
KY0104540
1
GRINDER PUMP
GRINDER PUMP INSTALLATION
NEW
EA
Linear Features:
DOW
Permit ID
Line Type
Purpose
Activity
Size
(in.)
Material
Length
(LF)
KY0104540
FORCE
COLLECTOR
EXTENSION
2.00
HDPE
1,065
KY0104540
FORCE
COLLECTOR
EXTENSION
3.00
HDPE
4,020
Total Length
5,085
Administrative Components:
The following administrative components are included in this project:
Planning
Sewer System Evaluation Survey Report
Design
Construction
Management
Audits on Record
Associated With Applicant
Audit
Year
Entity Name
Entity
Relationship
2021
Salyersville, City of
Parent
2020
Salyersville, City of
Parent
2021
Salyersville Water Works
Child
2020
Salyersville Water Works
Child
Water Treatment Plants Eliminated:
This project includes the elimination of water treatment plant(s).
Sanitary Sewer Components:
This project includes a new wastewater treatment plant.
This project includes an expansion of an existing wastewater treatment plant.
This project includes rehabilitation of an existing wastewater treatment plant.
This project includes upgrades to an existing wastewater treatment plant.
This project includes rehabilitation or replacement of aging infrastructure.
This project includes new collector sewers.
Total length of new collector sewer (LF):
5,085
This project includes new interceptor sewers.
This project includes elimination of existing sewer system components.
Security Components:
This project includes cyber-security components.
Green
Infrastructure
Water
Efficiency
Energy
Efficiency
Environmentally
Innovative
Asset
Management
Green Infrastructure:
Green stormwater infrastructure includes a wide array of practices at multiple scales that manage wet weather and that maintains and restores natural hydrology by infiltrating, evapotranspiring and harvesting and using stormwater. On a regional scale, green infrastructure is the preservation and restoration of natural landscape features, such as forests, floodplains, and wetlands, coupled with policies such as infill and redevelopment that reduce overall imperviousness in a watershed. On the local scale, green infrastructure consists of site and neighborhood-specific practices, such as:
Component
Cost
Item 1:
Implementation of green streets.
Item 2:
Wet Weather management systems for parking areas.
Item 3:
Implementation of comprehensive urban forestry programs.
Item 4:
Stormwater harvesting and reuse.
Item 5:
Downspout disconnection.
Item 6:
Comprehensive retrofit programs designed to keep wet weather discharges out of sewer systems.
Item 7:
Establishment or restoration of riparian buffers, floodplains, wetlands or other natural features.
Item 8:
Management of wetlands.
Item 9:
Purchase of land or easements on land that has a direct benefit to water quality.
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Water Efficiency:
The use of improved technologies and practices to deliver equal or better services with less water. Water efficiency encompasses conservation and reuse efforts, as well as water loss reduction and prevention, to protect water resources for the future. Examples include:
Component
Cost
Item 1:
Installing or retrofitting water efficient devices such as plumbing fixtures and appliances (toilets, showerheads, urinals).
Item 2:
Installing any type of water meter in previously unmetered areas (can include backflow prevention if in conjunction with meter replacement).
Item 3:
Replacing existing broken/malfunctioning water meters with AMR or smart meters, meters with leak detection, backflow prevention
Item 4:
Retrofitting/Adding AMR capabilities or leak equipment to existing meters.
Item 5:
Developing water audit and conservation plans, which are reasonably expected to result in a capital project.
Item 6:
Recycling and water reuse projects that replace potable sources with non-potable sources (Gray water, condensate, and wastewater effluent reuse systems, extra treatment or distribution costs associated with water reuse).
Item 7:
Retrofit or replacement of existing landscape irrigation/agricultural systems to more efficient landscape/agricultural irrigation systems (rain and moisture sensing equipment)
Item 8:
Water meter replacement with traditional water meters.*
Item 9:
Projects that result from a water audit or water conservation plan.*
Item 10:
Storage tank replacement/rehabilitation to reduce water loss.*
Item 11:
New water efficient landscape/agricultural irrigation system, where there currently is not one.*
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Energy Efficiency:
Energy efficiency is the use of improved technologies and practices to reduce the energy consumption of water projects, use energy in a more efficient way, and/or produce/utilize renewable energy. Examples include:
Component
Cost
Item 1:
Renewable energy projects such as wind, solar, geothermal, and micro-hydroelectric, and biogas combined heat and power systems that provide power to a POTW.
Item 2:
POTW-owned renewable energy projects.
Item 3:
Collection system infiltration/inflow (I/I) detection equipment.
Item 4:
POTW energy management planning, including energy assessments, energy audits, optimization studies, and sub-metering of individual processes to determine high energy use areas
Item 5:
Projects that achieve a reduction in energy consumption (pumps, motors).*
Item 6:
Projects that cost effectively eliminate pumps or pumping stations.*
Item 7:
I/I correction projects that save energy from pumping and reduced treatment costs.*
Item 8:
I/I correction where excessive groundwater infiltration is contaminating the influent requiring otherwise unnecessary treatment processes.*
Item 9:
Replacing old motors with premium energy efficiency motors.*
Item 10:
Upgrade of POTW lighting to energy efficient sources.*
Item 11:
SCADA systems where substantial energy savings can be demonstrated.*
Item 12:
Variable Frequency Drive (VFD) controllers where substantial energy savings can be demonstrated.*
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Environmentally Innovative Projects:
Environmentally innovative projects include those that demonstrate new and/or innovative approaches to delivering services or managing water resources in a more sustainable way. Examples include:
Component
Cost
Item 1:
Total integrated water resources management planning likely to result in a capital project.
Item 2:
Utility sustainability plan consistent with EPA’s sustainability policy.
Item 3:
Greenhouse gas inventory or mitigation plan and submission of a GHG inventory to a registry as long as it is being done for an SRF eligible facility.
Item 4:
Planning activities by a POTW to prepare for adaptation to the long-term effects of climate change and/or extreme weather.
Item 5:
Construction of US Building Council LEED certified buildings, or renovation of an existing building on POTW facilities.
Item 6:
Decentralized wastewater treatment solutions to existing deficient or failing onsite wastewater systems.
Item 7:
Constructed wetlands projects used for municipal wastewater treatment, polishing, and/or effluent disposal.*
Item 8:
Projects that result from total/integrated water resource management planning consistent with the decision criteria for environmentally innovative projects and that are CWSRF eligible.*
Item 9:
Projects that facilitate adaptation of POTWs to climate change identified by a carbon footprint assessment or climate adaption study.*
Item 10:
POTW upgrades or retrofits that remove phosphorus for beneficial use, such as biofuel production with algae.*
Item 11:
Projects that significantly reduce or eliminate the use of chemicals in wastewater treatment.*
Item 12:
Treatment technologies that significantly reduce the volume of residuals, generation of residuals, or lower the amount of chemicals in the residuals.*
Item 13:
Educational activities and demonstration projects for water or energy efficiency.*
Item 14:
Projects that achieve the goals/objectives of utility asset management plans.*
Item 15:
Sub-surface land application of effluent and other means for groundwater recharge, such as spray irrigation and overland flow.*
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Asset Management:
If a category is selected, the applicant must provide supporting documentation in PDF format to substantiate claims.
Asset Management Components
Last Rate Adjustment Date:
01.01.2019
Download Fee Schedule
Rate Adjustment Age (months):
60
System’s monthly water bill, based on 4,000 gallons, as a percentage of MHI:
1.31%
The system has an Asset Management Plan (AMP).
The system(s) involved in this project have specifically allocated funds for the rehabilitation and replacement of aging and deteriorating infrastructure.
Download Supporting Document
If any box(es) above are checked, please describe each below.
inventory assett for salyersville
Activity
Date
Profile Created:
09.14.2015
Profile Last Modified:
04.01.2019
General Info Last Modified:
04.01.2019
Narrative Last Modified:
01.29.2018
Admin Info Last Modified:
09.14.2015
Budget Info Last Modified:
09.29.2015
Impacts Info Last Modified:
01.11.2016
Plans & Specs Info Last Modified:
Components Info Last Modified:
09.15.2015
GIS Last Modified:
04.05.2017
The profile is complete.
Privacy
|
Security
|
Disclaimer
|
Accessibility Statement
Copyright ©
2024
Kentucky Infrastructure Authority