Kentucky WRIS Portal
About Us
Loan Programs
Loan Calculator
WRIS
Internet Mapping
WRIS Portal
System Data
Project Profile Data
Cleaner Water Program Funding
SRF Project Funding
Area Water Management Planning Councils
Downloadable Reports
Water Management Coordinators
ADD GIS Staff
Legislation
& Regulations
WRIS Contact
Don Schierer
502-892-3486
E-mail
Working...
Clean Water Project Profile:
This profile is currently locked
(SRF Applicant).
Project Title:
Village / Poplar Drive Sewer Improvements
Project Number:
SX21093029
AWMPC:
LTADD
Funding Status:
Fully Funded
Date Approved by AWMPC:
12.09.2015
Project Status:
Under Construction
Primary County:
Hardin
Project Schedule:
0-2 Years
Planning Unit:
Hardin
E-ClearingHouse SAI:
KY201603210249
ECH Status:
Approved
Primary System:
KY0022039
Elizabethtown Wastewater System
ADD WMC Contact:
Mollie Thompson
Legal Applicant:
City of Elizabethtown
Entity Type:
Incorporated City
Narrative
Applicant
Administration
Budget
& Schedule
Impacts
Components
Sustainable
Infrastructure
Audit
Project Title:
Village / Poplar Drive Sewer Improvements
Project Description:
The City of Elizabethtown is proposing to rehabilitate and improve existing wastewater collection and conveyance lines in the Village Drive and Poplar Drive areas. These areas generally handle normal flows but experience very high flows and sanitary overflows during heavy rain events. In order to reduce / eliminate infiltration, inflows, and sso conditions, the City is proposing to replace approximately 10,000 l.f. of 8-in. gravity lines with 12 & 18-in. gravity lines in the Village Drive area and approximately 7,900 l.f. of 8-in gravity with new 8 & 12-in. gravity lines in the Poplar Drive area. The Poplar Drive portion will also include approx. 10,200 l.f. of 12-in. force main and 2 peak flow pump stations to handle storm flows. Additional separate storm sewers will be installed with 2,200 l.f. of box culverts and 3 detention basins. These improvements will greatly improve sanitary flows and reduce and eliminate SSO conditions. The applicant will review the efficiency of the WWTP cleaning and maintenance system for improvements as well.
Need For Project:
Briefly describe how this project promotes public health or achieves and/or maintains compliance with the Clean Water Act or Safe Drinking Water Act:
The proposed project will help reduce and eliminate sanitary sewer overflows in the Village Drive and Poplar Drive areas affecting over 2,000 households.
Project Alternatives:
Alternate A:
Note: If project includes the construction of a new treatment plant or upgrade to existing plant, please explain regionalization options here.
Construct approximately 10,000 LF of upsized replacement gravity sewers (10, 12, 15 inch) in the Village Drive area and construct approx. 3,000 LF of 36-inch gravity sewers to replace 18 and 27 inch existing lines from Jersey Court to W. Dixie Ave.
Alternate B:
Construct in-line storage or force main pumping for peak flows, allowing for controlled release. Size requirements make this impractical.
Entity Information
Entity Type:
Incorporated City
Entity Name:
City of Elizabethtown
PSC Group ID:
8810700
Office EMail:
jessica.graham@elizabethtownky.gov
Web URL:
Office Phone:
270-765-6121
Fax:
270-737-5362
Entity Address Information
Mail Address
Physical Address
Address Line 1:
200 W Dixie Ave
Address Line 2:
City, State Zip:
Elizabethtown
,
KY
42701
Entity Contact Information
Contact Type
Name
Title
EMail
Phone
Cell
Business Contact:
Jessica J. Graham
City Clerk
jessica.graham@elizabethtownky.gov
270-765-6121
Authorized Official:
Jeffrey H. Gregory
Mayor
jeff.gregory@elizabethtownky.gov
270-765-6121
Information Source:
Kentucky Department for Local Government
Date Last Modified:
04.26.2024
Project Administrator (PA) Information
Name:
Bob Sturdivant
Title:
Hdr/Quest
Organization:
Hdr/Quest
EMail:
bob.sturdivant@hdrinc.com
Phone:
859-629-4826
Fax:
859-223-3150
Address Line 1:
2517 Sir Barton Way
Address Line 2:
City, State Zip:
Lexington
,
KY
40509
Applicant Contact (AC) Information
Name:
Scott Reynolds
Title:
City Engineer
Organization:
City of Elizabethtown
EMail:
scott.reynolds@elizabethtownky.gov
Phone:
270-765-6121
Fax:
270-737-5362
Address Line 1:
PO Box 550
Address Line 2:
200 W Dixie
City, State Zip:
Elizabethtown
,
KY
42702
Project Engineer (PE) Information
This project requires a licensed Professional Engineer.
A Professional Engineer has been procured for this project.
Licensed Engineer Information
License Number:
PE 15746
PE Name:
Phillip Benton Hanson
Firm Name:
Haworth-Meyer-Boleyn Professional Engineers, LLC.
Address Type:
Work
Address Line 1:
Quest Engineers
Address Line 2:
881 Corporate Dr., Ste. 100
Address Line 3:
City, State Zip:
Lexington
,
KY
40503
License Status:
Current
Disciplinary Actions:
No
Issue Date:
02.06.1989
Expiration Date:
06.30.2025
Phone:
502∙695∙9800
Fax:
EMail:
bhanson@hmbpe.com
Engineering Firm Information
Permit Number:
8
Firm Name:
Haworth-Meyer-Boleyn Professional Engineers, LLC.
Phone:
502∙695∙9800
Fax:
502∙695∙9800
Web URL:
E-Mail:
mgreen@hmbpe.com
Address Line 1:
3 Hmb Circle
Address Line 2:
City, State Zip:
Frankfort
,
KY
40601
Issue Date:
03.02.1993
Expir. Date:
12.31.2024
Permit
Status
Current
Disciplinary
Actions
No
Phillip Benton Hanson
Current
15,746
2,546
Estimated Budget
As-Bid Budget
Project Cost Categories
Cost Category
Cost
Administrative Expenses:
Legal Expenses:
Land, Appraisals, Easements:
Relocation Expense & Payments:
Planning:
Engineering Fees - Design:
Engineering Fees - Construction:
Engineering Fees - Inspection:
Engineering Fees - Other:
Construction:
$10,005,000
Equipment:
Miscellaneous:
Contingencies:
$1,000,500
Total Project Cost:
$11,005,500
Construction Cost Categories
Cost Category
Cost
WWTP Secondary Portion:
WWTP Advanced Portion:
Inflow & Infiltration Correction:
$7,885,000
Major Sewer Rehabilitation:
Collector Sewers:
Interceptor Sewers, including Pump Stations:
$2,120,000
Combined Sewer Overflow Correction:
NPS Urban:
Non-Categorized Cost:
Total Construction Cost:
$10,005,000
Total Sustainability Costs:
Note:
Sustainability costs are included within other costs
reported in this tab. This breakout, when provided,
is for SRF review purposes.
Project Funding Sources
Total Project Cost:
$11,005,500
Total Committed Funding:
$11,005,500
Funding Gap:
Fully Funded
Funding Source
Loan or
Grant ID
Fiscal
Year
Amount
Status
Applicable
Date
KIA SRF Fund A Loan (CW)
A16-081
2016
$11,005,500
Committed
03-03-2016
Total Committed
$11,005,500
Funding Source Notes
This project is being combined with SX21093028 as part of a new loan and close-out of an existing project loan. The new project package has been revised to include both profiles and revised cost estimates. Administrative and engineering costs are being covered by the City. The applicant will likely need to withdraw and update State Clearinghouse comments.
Estimated Project Schedule
Facility Plan Approval Date:
09.01.2008
Estimated Environmental Review Submittal Date:
02.15.2016
Estimated Bid Date:
03.10.2016
Estimated Construction Start Date:
05.02.2016
Estimated Construction Completion Date:
11.01.2017
The following systems are beneficiaries of this project:
KY0022039
Elizabethtown Wastewater System
Checked box indicates primary system for this project.
Project Ranking by AWMPC:
Regional Ranking(s):
Planning Unit Ranking:
Total Points:
 
Plans and Specifications:
Plans and specs have been sent to DOW.
Plans and specs have been reviewed by DOW.
Plans and specs have been sent to PSC.
Plans and specs have been reviewed by PSC.
Economic Impacts
Jobs Created:
Jobs Retained:
MHI Basis:
2025: ACS 2018-2022 5yr Estimates
2024: ACS 2017-2021 5yr Estimates
2023: ACS 2016-2020 5yr Estimates
2022: ACS 2015-2019 5yr Estimates
2021: ACS 2014-2018 5yr Estimates
2020: ACS 2013-2017 5yr Estimates
2019: ACS 2012-2016 5yr Estimates
2018: ACS 2011-2015 5yr Estimates
2017: ACS 2010-2014 5yr Estimates
2016: ACS 2009-2013 5yr Estimates
2015: ACS 2008-2012 5yr Estimates
2014: ACS 2007-2011 5yr Estimates
2013: ACS 2006-2010 5yr Estimates
2012: ACS 2005-2009 5yr Estimates
Demographic Impacts (GIS Census Overlay)
Serviceable
Demographic
Project
Area
Included
Systems
Included
Utilities
Population:
3,068
31,924
31,924
Households:
1,427
14,319
14,319
MHI:
$54,493
$54,886
*
$54,886
MHI MOE:
$5,409
$5,802
$5,802
MOE as Percent:
10%
11%
11%
**NSRL:
1
1
1
Population and household counts are based on the 2020 Census DEC Redistricting Data (PL 94-171) dataset.
Median Household Income (MHI) Source:
American Community Survey 2018-2022 5 Yr Estimates (Table B19013
*(for the primary system operated by the above listed beneficiary utilities).
MHI MOE = Med HH Income Margin of Error.
** NSRL (Non-Standard Rate Levels):
0 = Greater than or equal to Kentucky MHI (KMHI).
1 = Between 80% KMHI and KMHI (exclusive).
2 = Less than or equal to 80% KMHI.
- KMHI =
$60,183
- 80% KMHI =
$48,146
New Customers
New Residential Customers:
New Commercial Customers:
New Institutional Customers:
New Industrial Customers:
New or Improved Service
Service Demographic
Survey
Based
Census
Overlay*
To Unserved Households:
To Underserved Households:
2,000
1,427
To Total Households:
2,000
1,427
**Cost Per Household:
$5,503
*
GIS Census block overlay figures are estimates of population and households potentially served by systems and projects based on a proximity analysis of relevant service lines to census block boundaries published for the 2010 SF1 dataset.
**
Cost per household is based on surveyed household counts, not GIS overlay values.
Geographic Impacts
For Project Area
Counties
Hardin
Legislative Districts
District Name
Legislator
House 025
Steve Bratcher
Senate 10
Matthew Deneen
Congressional 2
Brett Guthrie
Groundwater
Sensitivity
Zones
5
HUC 10 Watersheds
HUC 10 Code
Watershed Name
0511000110
Middle Nolin River
WHPP Areas
PWSID
AKGWA
Zone
System Name
KY0470118
55271
1
Elizabethtown Water Department
Potential Impaired Watershed Designations
303d
305b
Priority
Watershed
Special
Use Waters
Exceptional
Use Waters
Yes
Yes
Yes
No
No
Note:
Impaired Watershed Designations only indicate that mapped components for this project lie within a HUC-12 watershed boundary containing impaired waterbody features. An affirmative indication for any designation will require a detailed analysis of the project to determine if any of the proposed project components will actually have a positive impact on the relevant impaired features.
Geographic Impacts
For Included System(s)
Counties
Hardin
Legislative Districts
District Name
House 010
Josh Calloway
House 018
Samara Heavrin
House 025
Steve Bratcher
Senate 10
Matthew Deneen
Congressional 2
Brett Guthrie
CW Specific Impacts:
Wastewater Volumes (MGD):
For this project:
For included system(s):
29.000
Reduced by this project:
Other CW Specific Impacts:
This project provides regionalization and/or consolidation of wastewater treatment systems.
This project will eliminate a package treatment plant that is more than 25 years old.
This project will eliminate a package treatment plant that has received notices of violations within the last two state fiscal years (July through June).
This project includes an on-site mound, and/or decentralized WW treatment system.
This project is necessary to achieve full or partial compliance with a court order, agreed order, or a judicial or administrative consent decree.
Primary system has not received any CWA Notices of Violation within the previous state fiscal year (July through June).
This project is consistent with the approved facility plan.
This project will have a positive impact on drinking water sources within a 5 mile radius.
Planning Needs:
Combined Sewer Overflow (CSO) Correction.
Sanitary Sewer Overflow (SSO) Correction.
Replacement or Rehabilitation of Aging Infrastructure.
New Treatment Plant.
New Collector Sewers and Appurtenances.
Decentralized Wastewater Treatment Systems.
Upgrade to Advanced Treatment.
This project addresses PFAS or other emerging contaminants.
Rehab/Upgrade/Expansion of Existing Treatment Plant.
New Interceptor Sewers and Appurtenances.
Stormwater Control.
Non-Point Source (NPS) Pollution Control.
Recycled Water Distribution.
Planning
Other (specify):
Project Inventory (Mapped Features):
Point Features:
DOW
PermitID
Count
FeatureType
Purpose
Status
Existing
Capacity
Proposed
Capacity
Units
KY0022039
2
LIFTSTATION
NEW
500.00
GPM
Linear Features:
DOW
Permit ID
Line Type
Purpose
Activity
Size
(in.)
Material
Length
(LF)
KY0022039
GRAVITY
COLLECTOR
REHAB - SSO
8.00
PVC
3,495
KY0022039
GRAVITY
COLLECTOR
REHAB - SSO
10.00
PVC
2,076
KY0022039
GRAVITY
COLLECTOR
REHAB - SSO
12.00
PVC
8,135
KY0022039
GRAVITY
COLLECTOR
REHAB - SSO
15.00
PVC
3,856
KY0022039
GRAVITY
COLLECTOR
REHAB - SSO
36.00
PVC
2,600
KY0022039
FORCE
INTERCEPTOR
REHAB - SSO
10.00
PVC
2,262
KY0022039
FORCE
INTERCEPTOR
REHAB - SSO
12.00
PVC
4,152
Total Length
26,576
Administrative Components:
The following administrative components are included in this project:
Planning
Sewer System Evaluation Survey Report
Design
Construction
Management
Audits on Record
Associated With Applicant
Audit
Year
Entity Name
Entity
Relationship
2023
Elizabethtown, City of
Parent
2022
Elizabethtown, City of
Parent
2021
Elizabethtown, City of
Parent
2020
Elizabethtown, City of
Parent
Water Treatment Plants Eliminated:
This project includes the elimination of water treatment plant(s).
Sanitary Sewer Components:
This project includes a new wastewater treatment plant.
This project includes an expansion of an existing wastewater treatment plant.
This project includes rehabilitation of an existing wastewater treatment plant.
This project includes upgrades to an existing wastewater treatment plant.
This project includes rehabilitation or replacement of aging infrastructure.
Total length of replaced infrastructure (LF):
26,576
This project includes new collector sewers.
This project includes new interceptor sewers.
This project includes elimination of existing sewer system components.
Security Components:
This project includes cyber-security components.
Green
Infrastructure
Water
Efficiency
Energy
Efficiency
Environmentally
Innovative
Asset
Management
Green Infrastructure:
Green stormwater infrastructure includes a wide array of practices at multiple scales that manage wet weather and that maintains and restores natural hydrology by infiltrating, evapotranspiring and harvesting and using stormwater. On a regional scale, green infrastructure is the preservation and restoration of natural landscape features, such as forests, floodplains, and wetlands, coupled with policies such as infill and redevelopment that reduce overall imperviousness in a watershed. On the local scale, green infrastructure consists of site and neighborhood-specific practices, such as:
Component
Cost
Item 1:
Implementation of green streets.
Item 2:
Wet Weather management systems for parking areas.
Item 3:
Implementation of comprehensive urban forestry programs.
Item 4:
Stormwater harvesting and reuse.
Item 5:
Downspout disconnection.
Item 6:
Comprehensive retrofit programs designed to keep wet weather discharges out of sewer systems.
Item 7:
Establishment or restoration of riparian buffers, floodplains, wetlands or other natural features.
Item 8:
Management of wetlands.
Item 9:
Purchase of land or easements on land that has a direct benefit to water quality.
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Water Efficiency:
The use of improved technologies and practices to deliver equal or better services with less water. Water efficiency encompasses conservation and reuse efforts, as well as water loss reduction and prevention, to protect water resources for the future. Examples include:
Component
Cost
Item 1:
Installing or retrofitting water efficient devices such as plumbing fixtures and appliances (toilets, showerheads, urinals).
Item 2:
Installing any type of water meter in previously unmetered areas (can include backflow prevention if in conjunction with meter replacement).
Item 3:
Replacing existing broken/malfunctioning water meters with AMR or smart meters, meters with leak detection, backflow prevention
Item 4:
Retrofitting/Adding AMR capabilities or leak equipment to existing meters.
Item 5:
Developing water audit and conservation plans, which are reasonably expected to result in a capital project.
Item 6:
Recycling and water reuse projects that replace potable sources with non-potable sources (Gray water, condensate, and wastewater effluent reuse systems, extra treatment or distribution costs associated with water reuse).
Item 7:
Retrofit or replacement of existing landscape irrigation/agricultural systems to more efficient landscape/agricultural irrigation systems (rain and moisture sensing equipment)
Item 8:
Water meter replacement with traditional water meters.*
Item 9:
Projects that result from a water audit or water conservation plan.*
Item 10:
Storage tank replacement/rehabilitation to reduce water loss.*
Item 11:
New water efficient landscape/agricultural irrigation system, where there currently is not one.*
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Energy Efficiency:
Energy efficiency is the use of improved technologies and practices to reduce the energy consumption of water projects, use energy in a more efficient way, and/or produce/utilize renewable energy. Examples include:
Component
Cost
Item 1:
Renewable energy projects such as wind, solar, geothermal, and micro-hydroelectric, and biogas combined heat and power systems that provide power to a POTW.
Item 2:
POTW-owned renewable energy projects.
Item 3:
Collection system infiltration/inflow (I/I) detection equipment.
Item 4:
POTW energy management planning, including energy assessments, energy audits, optimization studies, and sub-metering of individual processes to determine high energy use areas
Item 5:
Projects that achieve a reduction in energy consumption (pumps, motors).*
Item 6:
Projects that cost effectively eliminate pumps or pumping stations.*
Item 7:
I/I correction projects that save energy from pumping and reduced treatment costs.*
Item 8:
I/I correction where excessive groundwater infiltration is contaminating the influent requiring otherwise unnecessary treatment processes.*
Item 9:
Replacing old motors with premium energy efficiency motors.*
Item 10:
Upgrade of POTW lighting to energy efficient sources.*
Item 11:
SCADA systems where substantial energy savings can be demonstrated.*
Item 12:
Variable Frequency Drive (VFD) controllers where substantial energy savings can be demonstrated.*
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Environmentally Innovative Projects:
Environmentally innovative projects include those that demonstrate new and/or innovative approaches to delivering services or managing water resources in a more sustainable way. Examples include:
Component
Cost
Item 1:
Total integrated water resources management planning likely to result in a capital project.
Item 2:
Utility sustainability plan consistent with EPA’s sustainability policy.
Item 3:
Greenhouse gas inventory or mitigation plan and submission of a GHG inventory to a registry as long as it is being done for an SRF eligible facility.
Item 4:
Planning activities by a POTW to prepare for adaptation to the long-term effects of climate change and/or extreme weather.
Item 5:
Construction of US Building Council LEED certified buildings, or renovation of an existing building on POTW facilities.
Item 6:
Decentralized wastewater treatment solutions to existing deficient or failing onsite wastewater systems.
Item 7:
Constructed wetlands projects used for municipal wastewater treatment, polishing, and/or effluent disposal.*
Item 8:
Projects that result from total/integrated water resource management planning consistent with the decision criteria for environmentally innovative projects and that are CWSRF eligible.*
Item 9:
Projects that facilitate adaptation of POTWs to climate change identified by a carbon footprint assessment or climate adaption study.*
Item 10:
POTW upgrades or retrofits that remove phosphorus for beneficial use, such as biofuel production with algae.*
Item 11:
Projects that significantly reduce or eliminate the use of chemicals in wastewater treatment.*
Item 12:
Treatment technologies that significantly reduce the volume of residuals, generation of residuals, or lower the amount of chemicals in the residuals.*
Item 13:
Educational activities and demonstration projects for water or energy efficiency.*
Item 14:
Projects that achieve the goals/objectives of utility asset management plans.*
Item 15:
Sub-surface land application of effluent and other means for groundwater recharge, such as spray irrigation and overland flow.*
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Asset Management:
If a category is selected, the applicant must provide supporting documentation in PDF format to substantiate claims.
Asset Management Components
Last Rate Adjustment Date:
02.14.2014
Download Fee Schedule
Rate Adjustment Age (months):
119
System’s monthly water bill, based on 4,000 gallons, as a percentage of MHI:
0.41%
The system has an Asset Management Plan (AMP).
Note: AMP scoring credit requires at least one of the following components:
The AMP includes an Asset Inventory.
The AMP includes a Strategic Plan.
The AMP includes a Capital Improvement Plan.
You must upload a supporting document for this item.
The system(s) involved in this project have specifically allocated funds for the rehabilitation and replacement of aging and deteriorating infrastructure.
If any box(es) above are checked, please describe each below.
City of Elizabethtown maintains a Capital Plan that is part of their yearly budget.
Activity
Date
Profile Created:
04.27.2012
Profile Last Modified:
12.06.2023
General Info Last Modified:
12.06.2023
Narrative Last Modified:
02.04.2016
Admin Info Last Modified:
02.04.2016
Budget Info Last Modified:
12.10.2015
Impacts Info Last Modified:
12.10.2015
Plans & Specs Info Last Modified:
Components Info Last Modified:
05.02.2012
GIS Last Modified:
02.05.2016
Deficiencies found in Sustainable Infrastructure Tab:
Asset Management Tab:
− The Capital Improvement Plan must have at least one of the required listed components.
− A document (PDF) describing the capital improvement plan must be provided.
Privacy
|
Security
|
Disclaimer
|
Accessibility Statement
Copyright ©
2024
Kentucky Infrastructure Authority