Clean Water Project Profile:
This profile is read-only (constructed or withdrawn).
Project Title:
Hawesville Sewer Plant Rebuild Project
Project Number:
SX21091015
AWMPC:
GRADD
Funding Status:
Fully Funded
Date Approved by AWMPC:
12.13.2012
Project Status:
Constructed
Primary County:
Hancock
Project Schedule:
Constructed
Planning Unit:
Hancock
E-ClearingHouse SAI:
KY201811261152
ECH Status:
Approved
Primary System:
KY0020087
Hawesville Water Works
ADD WMC Contact:
Dana Garrett
Legal Applicant:
City of Hawesville
Entity Type:
Incorporated City
Narrative
Applicant
Administration
Budget
& Schedule
Impacts
Components
Sustainable
Infrastructure
Audit
Project Title:
Hawesville Sewer Plant Rebuild Project
Project Description:
CHANGE ORDER - PROJECT SCOPE ADDITION: DUE TO WORK CHANGE ORDER PROJECT WILL NOW ALSO: Modify the existing drying beds to improve the sludge handling capacity and efficiencies. Two dewatering tanks, polymer feed system and piping will be placed on the existing drying beds. END This project proposes to construct a new wastewater treatment plant adjacent to the City of Hawesville’s existing treatment facility. The existing plant is a 250,000 GPD Cantex Package Treatment Plant that was built in 1970 and was rehabbed in the 1990’s. The existing facility also includes a post aeration basin, UV channel, headworks, chlorination basin, flow meter, and drying beds. The plant has several issues with its internal piping and structure that are difficult to repair and maintain due to the lack of redundancy of the plant. The components for the new 300,000 GPD wastewater treatment plant will include new headworks, a contact stabilization unit for aeration and clarification, a new UV disinfection system, influent and effluent flow meters, a 300 GPM effluent lift station, and approximately 2,000 LF of 8 inch HDPE force main from the treatment plant to a new outfall location on the Ohio River (the current discharge is in Lead Creek, a tributary to the Ohio River). Following the construction and initiation of operation of the new wastewater treatment plant, the existing plant will be demolished with the exception of the drying beds which the City will continue to use for the sludge drying in the treatment process. Since the City is expanding its treatment capacity in the new plant by 50,000 GPD, or 20% of the existing facility capacity, the City’s Facility Plan was updated and approved by Division of Water on November 16, 2015. The City is also in the process of applying for a KPDES permit renewal and has requested an increase in discharge limits and a new location for the outfall.
Need For Project:
Briefly describe how this project promotes public health or achieves and/or maintains compliance with the Clean Water Act or Safe Drinking Water Act:
Due to the deterioration of the existing facility and inadequate treatment processes the plant can no longer meet EPA parameters. The existing facility struggles to meet Ammonia and E Coli discharge levels and there are concerns that the plant will be unable to meet the phosphorus discharge levels of its new permit. Since a rehabilitation is unfeasible for the Cantex Package Treatment Plant, a new wastewater treatment plant is necessary for the City to meet clean water regulations and standards.
Project Alternatives:
Alternate A:
Note: If project includes the construction of a new treatment plant or upgrade to existing plant, please explain regionalization options here.
Rebuild the plant in phases as the components fail.
Alternate B:
Look at regionalizing the sewer service in the area by completing an interconnect and switching the city's permit to a KISOP
Entity Information
Entity Type:
Incorporated City
Entity Name:
City of Hawesville
PSC Group ID:
Office EMail:
aroberts@hawesville.us
Web URL:
Office Phone:
270-927-8707
Fax:
270-927-8184
Entity Address Information
Mail Address
Physical Address
Address Line 1:
395 Main St PO Box 157
Address Line 2:
City, State Zip:
Hawesville
,
KY
42348
Entity Contact Information
Contact Type
Name
Title
EMail
Phone
Cell
Business Contact:
Amy Roberts
City Clerk
aroberts@hawesville.us
270-927-8707
Authorized Official:
Robert McCormick
Mayor
rmccormick@hawesville.us
270-927-8707
Information Source:
Kentucky Department for Local Government
Date Last Modified:
04.26.2024
Project Administrator (PA) Information
Name:
Patrick Kirby
Title:
Project Manager
Organization:
Ceda, Inc.
EMail:
kirbypr@gmail.com
Phone:
859-624-3396
Fax:
Address Line 1:
PO Box 855
Address Line 2:
City, State Zip:
Richmond
,
KY
40476
Applicant Contact (AC) Information
Name:
Barbara Spencer
Title:
City Clerk
Organization:
City of Hawesville
EMail:
bspencer@hawesville.us
Phone:
270-927-8707
Fax:
270-927-8184
Address Line 1:
395 Main Street
Address Line 2:
City, State Zip:
Hawesville
,
KY
42348
Project Engineer (PE) Information
This project requires a licensed Professional Engineer.
A Professional Engineer has been procured for this project.
Licensed Engineer Information
License Number:
PE 25716
PE Name:
Matthew Ray Curtis
Firm Name:
Bluegrass Engineering, PLLC
Address Type:
Work
Address Line 1:
222 East Main Street, Suite 1
Address Line 2:
PO Box 1657
Address Line 3:
City, State Zip:
Georgetown
,
KY
40324
License Status:
Current
Disciplinary Actions:
No
Issue Date:
12.26.2007
Expiration Date:
06.30.2025
Phone:
502∙370∙6551
Fax:
EMail:
mcurtis@bluegrassengineering.net
Engineering Firm Information
Permit Number:
4499
Firm Name:
Bluegrass Engineering, PLLC
Phone:
502∙370∙6551
Fax:
Web URL:
http://www.bluegrassengineering.net/
E-Mail:
mcurtis@bluegrassengineering.net
Address Line 1:
222 East Main Street, Suite 1
Address Line 2:
PO Box 1657
City, State Zip:
Georgetown
,
KY
40324
Issue Date:
07.11.2017
Expir. Date:
12.31.2024
Permit
Status
Current
Disciplinary
Actions
No
Matthew Ray Curtis
Current
25,716
5,494
Estimated Budget
As-Bid Budget
Project Cost Categories
Cost Category
Cost
Administrative Expenses:
$50,000
Legal Expenses:
Land, Appraisals, Easements:
Relocation Expense & Payments:
Planning:
$10,000
Engineering Fees - Design:
$225,156
Engineering Fees - Construction:
Engineering Fees - Inspection:
$171,656
Engineering Fees - Other:
$145,000
Construction:
$2,907,450
Equipment:
Miscellaneous:
Contingencies:
$290,738
Total Project Cost:
$3,800,000
Construction Cost Categories
Cost Category
Cost
WWTP Secondary Portion:
$2,907,450
WWTP Advanced Portion:
Inflow & Infiltration Correction:
Major Sewer Rehabilitation:
Collector Sewers:
Interceptor Sewers, including Pump Stations:
Combined Sewer Overflow Correction:
NPS Urban:
Non-Categorized Cost:
Total Construction Cost:
$2,907,450
Total Sustainability Costs:
Note:
Sustainability costs are included within other costs
reported in this tab. This breakout, when provided,
is for SRF review purposes.
Project Funding Sources
Total Project Cost:
$3,800,000
Total Committed Funding:
$3,800,000
Funding Gap:
Fully Funded
Funding Source
Loan or
Grant ID
Fiscal
Year
Amount
Status
Applicable
Date
KIA SRF Fund A Loan (CW)
A15-082
2015
$337,500
Expired
10-30-2014
CDBG
15-058
2015
$800,000
Withdrawn
06-30-2015
KIA SRF Fund A Loan (CW)
A16-059
2016
$3,000,000
Committed
03-03-2016
CDBG
16-003
2016
$800,000
Committed
02-23-2017
Total Committed
$3,800,000
Funding Source Notes
Estimated Project Schedule
Facility Plan Approval Date:
11.16.2015
Estimated Environmental Review Submittal Date:
Estimated Bid Date:
05.31.2016
Estimated Construction Start Date:
07.31.2016
Estimated Construction Completion Date:
11.30.2017
The following systems are beneficiaries of this project:
KY0020087
Hawesville Water Works
Checked box indicates primary system for this project.
Project Ranking by AWMPC:
Regional Ranking(s):
Planning Unit Ranking:
Total Points:
 
Plans and Specifications:
Plans and specs have been sent to DOW.
Plans and specs have been reviewed by DOW.
Plans and specs have been sent to PSC.
Plans and specs have been reviewed by PSC.
Economic Impacts
Jobs Created:
Jobs Retained:
MHI Basis:
2025: ACS 2018-2022 5yr Estimates
2024: ACS 2017-2021 5yr Estimates
2023: ACS 2016-2020 5yr Estimates
2022: ACS 2015-2019 5yr Estimates
2021: ACS 2014-2018 5yr Estimates
2020: ACS 2013-2017 5yr Estimates
2019: ACS 2012-2016 5yr Estimates
2018: ACS 2011-2015 5yr Estimates
2017: ACS 2010-2014 5yr Estimates
2016: ACS 2009-2013 5yr Estimates
2015: ACS 2008-2012 5yr Estimates
2014: ACS 2007-2011 5yr Estimates
2013: ACS 2006-2010 5yr Estimates
2012: ACS 2005-2009 5yr Estimates
Demographic Impacts (GIS Census Overlay)
Serviceable
Demographic
Project
Area
Included
Systems
Included
Utilities
Population:
1,359
1,359
Households:
588
588
MHI:
$57,422
*
$57,422
MHI MOE:
$21,379
$21,379
MOE as Percent:
37%
37%
**NSRL:
1
1
Population and household counts are based on the 2020 Census DEC Redistricting Data (PL 94-171) dataset.
Median Household Income (MHI) Source:
American Community Survey 2018-2022 5 Yr Estimates (Table B19013
*(for the primary system operated by the above listed beneficiary utilities).
MHI MOE = Med HH Income Margin of Error.
** NSRL (Non-Standard Rate Levels):
0 = Greater than or equal to Kentucky MHI (KMHI).
1 = Between 80% KMHI and KMHI (exclusive).
2 = Less than or equal to 80% KMHI.
- KMHI =
$60,183
- 80% KMHI =
$48,146
New Customers
New Residential Customers:
New Commercial Customers:
New Institutional Customers:
New Industrial Customers:
New or Improved Service
Service Demographic
Survey
Based
Census
Overlay*
To Unserved Households:
To Underserved Households:
1,100
To Total Households:
1,100
**Cost Per Household:
$3,455
*
GIS Census block overlay figures are estimates of population and households potentially served by systems and projects based on a proximity analysis of relevant service lines to census block boundaries published for the 2010 SF1 dataset.
**
Cost per household is based on surveyed household counts, not GIS overlay values.
Geographic Impacts
For Project Area
Counties
Hancock
Legislative Districts
District Name
Legislator
House 014
Scott Lewis
Senate 08
Gary Boswell
Congressional 2
Brett Guthrie
Groundwater
Sensitivity
Zones
4
HUC 10 Watersheds
HUC 10 Code
Watershed Name
0514020107
Lead Creek-Ohio River
WHPP Areas
PWSID
AKGWA
Zone
System Name
KY0460182
61858
3
Hawesville Water Works
Potential Impaired Watershed Designations
303d
305b
Priority
Watershed
Special
Use Waters
Exceptional
Use Waters
No
Yes
No
Yes
Yes
Note:
Impaired Watershed Designations only indicate that mapped components for this project lie within a HUC-12 watershed boundary containing impaired waterbody features. An affirmative indication for any designation will require a detailed analysis of the project to determine if any of the proposed project components will actually have a positive impact on the relevant impaired features.
Geographic Impacts
For Included System(s)
Counties
Hancock
Legislative Districts
District Name
House 014
Scott Lewis
Senate 08
Gary Boswell
Congressional 2
Brett Guthrie
CW Specific Impacts:
Wastewater Volumes (MGD):
For this project:
For included system(s):
0.250
Reduced by this project:
Other CW Specific Impacts:
This project provides regionalization and/or consolidation of wastewater treatment systems.
This project will eliminate a package treatment plant that is more than 25 years old.
This project will eliminate a package treatment plant that has received notices of violations within the last two state fiscal years (July through June).
This project includes an on-site mound, and/or decentralized WW treatment system.
This project is necessary to achieve full or partial compliance with a court order, agreed order, or a judicial or administrative consent decree.
Agreed Order Number:
DOW#150028
This project includes components to achieve compliance with a federal consent decree.
Primary system has not received any CWA Notices of Violation within the previous state fiscal year (July through June).
This project is consistent with the approved facility plan.
This project will have a positive impact on drinking water sources within a 5 mile radius.
Planning Needs:
Combined Sewer Overflow (CSO) Correction.
Sanitary Sewer Overflow (SSO) Correction.
Replacement or Rehabilitation of Aging Infrastructure.
New Treatment Plant.
New Collector Sewers and Appurtenances.
Decentralized Wastewater Treatment Systems.
Upgrade to Advanced Treatment.
This project addresses PFAS or other emerging contaminants.
Rehab/Upgrade/Expansion of Existing Treatment Plant.
New Interceptor Sewers and Appurtenances.
Stormwater Control.
Non-Point Source (NPS) Pollution Control.
Recycled Water Distribution.
Planning
Other (specify):
Project Inventory (Mapped Features):
Point Features:
DOW
PermitID
Count
FeatureType
Purpose
Status
Existing
Capacity
Proposed
Capacity
Units
KY0020087
1
OUTFALL
OUTFALL RELOCATION
NEW
EA
KY0020087
1
SEWAGE TREATMENT PLANT
STP REBUILD
ELIMINATE
0.25
MGD
KY0020087
1
SEWAGE TREATMENT PLANT
STP REBUILD
NEW
0.30
MGD
Linear Features:
DOW
Permit ID
Line Type
Purpose
Activity
Size
(in.)
Material
Length
(LF)
KY0020087
FORCE
INTERCEPTOR
EXTENSION
8.00
HDPE
2,016
Total Length
2,016
Administrative Components:
The following administrative components are included in this project:
Planning
Sewer System Evaluation Survey Report
Design
Construction
Management
Note: There are no audits on record associated with the applicant entity.
Water Treatment Plants Eliminated:
This project includes the elimination of water treatment plant(s).
Plants Eliminated By This Project:
DOW
Permit ID
Facility
Type
System Name
Design
Capacity
(MGD)
PFAS
Detected
KY0020087
STP
Hawesville Water Works
0.250
No
Sanitary Sewer Components:
This project includes a new wastewater treatment plant.
Proposed design capacity (MGD):
0.300
This project includes an expansion of an existing wastewater treatment plant.
This project includes rehabilitation of an existing wastewater treatment plant.
This project includes upgrades to an existing wastewater treatment plant.
This project includes rehabilitation or replacement of aging infrastructure.
This project includes new collector sewers.
This project includes new interceptor sewers.
Total length of new interceptor sewer (LF):
2,016
This project includes elimination of existing sewer system components.
Security Components:
This project includes cyber-security components.
Green
Infrastructure
Water
Efficiency
Energy
Efficiency
Environmentally
Innovative
Asset
Management
Green Infrastructure:
Green stormwater infrastructure includes a wide array of practices at multiple scales that manage wet weather and that maintains and restores natural hydrology by infiltrating, evapotranspiring and harvesting and using stormwater. On a regional scale, green infrastructure is the preservation and restoration of natural landscape features, such as forests, floodplains, and wetlands, coupled with policies such as infill and redevelopment that reduce overall imperviousness in a watershed. On the local scale, green infrastructure consists of site and neighborhood-specific practices, such as:
Component
Cost
Item 1:
Implementation of green streets.
Item 2:
Wet Weather management systems for parking areas.
Item 3:
Implementation of comprehensive urban forestry programs.
Item 4:
Stormwater harvesting and reuse.
Item 5:
Downspout disconnection.
Item 6:
Comprehensive retrofit programs designed to keep wet weather discharges out of sewer systems.
Item 7:
Establishment or restoration of riparian buffers, floodplains, wetlands or other natural features.
Item 8:
Management of wetlands.
Item 9:
Purchase of land or easements on land that has a direct benefit to water quality.
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Water Efficiency:
The use of improved technologies and practices to deliver equal or better services with less water. Water efficiency encompasses conservation and reuse efforts, as well as water loss reduction and prevention, to protect water resources for the future. Examples include:
Component
Cost
Item 1:
Installing or retrofitting water efficient devices such as plumbing fixtures and appliances (toilets, showerheads, urinals).
Item 2:
Installing any type of water meter in previously unmetered areas (can include backflow prevention if in conjunction with meter replacement).
Item 3:
Replacing existing broken/malfunctioning water meters with AMR or smart meters, meters with leak detection, backflow prevention
Item 4:
Retrofitting/Adding AMR capabilities or leak equipment to existing meters.
Item 5:
Developing water audit and conservation plans, which are reasonably expected to result in a capital project.
Item 6:
Recycling and water reuse projects that replace potable sources with non-potable sources (Gray water, condensate, and wastewater effluent reuse systems, extra treatment or distribution costs associated with water reuse).
Item 7:
Retrofit or replacement of existing landscape irrigation/agricultural systems to more efficient landscape/agricultural irrigation systems (rain and moisture sensing equipment)
Item 8:
Water meter replacement with traditional water meters.*
Item 9:
Projects that result from a water audit or water conservation plan.*
Item 10:
Storage tank replacement/rehabilitation to reduce water loss.*
Item 11:
New water efficient landscape/agricultural irrigation system, where there currently is not one.*
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Energy Efficiency:
Energy efficiency is the use of improved technologies and practices to reduce the energy consumption of water projects, use energy in a more efficient way, and/or produce/utilize renewable energy. Examples include:
Component
Cost
Item 1:
Renewable energy projects such as wind, solar, geothermal, and micro-hydroelectric, and biogas combined heat and power systems that provide power to a POTW.
Item 2:
POTW-owned renewable energy projects.
Item 3:
Collection system infiltration/inflow (I/I) detection equipment.
Item 4:
POTW energy management planning, including energy assessments, energy audits, optimization studies, and sub-metering of individual processes to determine high energy use areas
Item 5:
Projects that achieve a reduction in energy consumption (pumps, motors).*
Item 6:
Projects that cost effectively eliminate pumps or pumping stations.*
Item 7:
I/I correction projects that save energy from pumping and reduced treatment costs.*
Item 8:
I/I correction where excessive groundwater infiltration is contaminating the influent requiring otherwise unnecessary treatment processes.*
Item 9:
Replacing old motors with premium energy efficiency motors.*
Item 10:
Upgrade of POTW lighting to energy efficient sources.*
Item 11:
SCADA systems where substantial energy savings can be demonstrated.*
Item 12:
Variable Frequency Drive (VFD) controllers where substantial energy savings can be demonstrated.*
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Environmentally Innovative Projects:
Environmentally innovative projects include those that demonstrate new and/or innovative approaches to delivering services or managing water resources in a more sustainable way. Examples include:
Component
Cost
Item 1:
Total integrated water resources management planning likely to result in a capital project.
Item 2:
Utility sustainability plan consistent with EPA’s sustainability policy.
Item 3:
Greenhouse gas inventory or mitigation plan and submission of a GHG inventory to a registry as long as it is being done for an SRF eligible facility.
Item 4:
Planning activities by a POTW to prepare for adaptation to the long-term effects of climate change and/or extreme weather.
Item 5:
Construction of US Building Council LEED certified buildings, or renovation of an existing building on POTW facilities.
Item 6:
Decentralized wastewater treatment solutions to existing deficient or failing onsite wastewater systems.
Item 7:
Constructed wetlands projects used for municipal wastewater treatment, polishing, and/or effluent disposal.*
Item 8:
Projects that result from total/integrated water resource management planning consistent with the decision criteria for environmentally innovative projects and that are CWSRF eligible.*
Item 9:
Projects that facilitate adaptation of POTWs to climate change identified by a carbon footprint assessment or climate adaption study.*
Item 10:
POTW upgrades or retrofits that remove phosphorus for beneficial use, such as biofuel production with algae.*
Item 11:
Projects that significantly reduce or eliminate the use of chemicals in wastewater treatment.*
Item 12:
Treatment technologies that significantly reduce the volume of residuals, generation of residuals, or lower the amount of chemicals in the residuals.*
Item 13:
Educational activities and demonstration projects for water or energy efficiency.*
Item 14:
Projects that achieve the goals/objectives of utility asset management plans.*
Item 15:
Sub-surface land application of effluent and other means for groundwater recharge, such as spray irrigation and overland flow.*
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Asset Management:
If a category is selected, the applicant must provide supporting documentation in PDF format to substantiate claims.
Asset Management Components
Last Rate Adjustment Date:
07.01.2023
Download Fee Schedule
Rate Adjustment Age (months):
6
System’s monthly water bill, based on 4,000 gallons, as a percentage of MHI:
0.57%
The system has an Asset Management Plan (AMP).
The system(s) involved in this project have specifically allocated funds for the rehabilitation and replacement of aging and deteriorating infrastructure.
If any box(es) above are checked, please describe each below.
Activity
Date
Profile Created:
12.12.2012
Profile Last Modified:
09.10.2019
General Info Last Modified:
09.10.2019
Narrative Last Modified:
10.31.2018
Admin Info Last Modified:
07.27.2015
Budget Info Last Modified:
07.28.2016
Impacts Info Last Modified:
07.28.2016
Plans & Specs Info Last Modified:
Components Info Last Modified:
12.13.2012
GIS Last Modified:
08.22.2016
The profile is complete.
Privacy
|
Security
|
Disclaimer
|
Accessibility Statement
Copyright ©
2024
Kentucky Infrastructure Authority