Clean Water Project Profile:
This profile is read-only (constructed or withdrawn).
Project Title:
Expansion Area Three Sanitary Sewer Infrastructure
Project Number:
SX21067002
AWMPC:
BGADD
Funding Status:
Not Funded
Date Approved by AWMPC:
11.26.2004
Project Status:
Constructed
Primary County:
Fayette
Project Schedule:
Constructed
Planning Unit:
Unit 6
E-ClearingHouse SAI:
KY201604280420
ECH Status:
Approved
Primary System:
KY0021491
LFUCG - Town Branch
ADD WMC Contact:
Karyn Leverenz
Legal Applicant:
Lexington-Fayette Urban County Government
Entity Type:
Incorporated City
Narrative
Applicant
Administration
Budget
& Schedule
Impacts
Components
Sustainable
Infrastructure
Audit
Project Title:
Expansion Area Three Sanitary Sewer Infrastructure
Project Description:
Project includes the design and construction of the Expansion Area 3 Pump Station and Force Main and upstream trunk sewer. The pump station will be rated for 9.5 MGD and will discharge to the FM, which will be approximately 5,252 LF of 24" pipe. The FM will terminate at the Lower Griffin Gate Trunk. The trunk sewer will be approximately 7,143 LF of 30" new gravity sewer which will discharge into the proposed Expansion Area 3 Pump Station. Preservation of trees are incorporated into the alignment and construction of this project. An arborist will assess and identify trees that are considered specimen trees to be preserved as a part of this project. The plans and specifications will also include special provisions for the protection of existing tress to the maximum extent practicable. Design standards, including the use of riparian buffers, are incorporated into the alignment and construction of this project. This project will provide energy efficiencies for LFUCG by providing the means to eliminate four existing pump stations and consolidating the flow into one pump station. This project has to be built prior to taking 5 SSO pump stations out of service. The elimination of these pump stations would also eliminate a manhole SSO. All 5 of these SSOs are listed in their consent decree and their elimination is contingent on this project.. The pump stations being elminated are: • Shandon Park Pump Station #1 • Shandon Park Pump Station #2 • Thoroughbred Acres Pump Station • Winburn Pump Station • Sharon Village Pump Station Estimated project cost is $16,889,000. Project proposed in LFUCG's Remedial Measures Plan, submitted to USEPA on April 13, 2012.
Need For Project:
Briefly describe how this project promotes public health or achieves and/or maintains compliance with the Clean Water Act or Safe Drinking Water Act:
Existing sanitary sewer that lacks sufficient capacity to meet LFUCG's EPA mandated Capacity Assurance Program. Project proposed in LFUCG's Remedial Measures Plan, submitted to USEPA on April 13, 2012.
Project Alternatives:
Alternate A:
Note: If project includes the construction of a new treatment plant or upgrade to existing plant, please explain regionalization options here.
Eliminate sufficient private property inflow and infiltration so that pipeline has required capacity. Private property work must be complete and successful by June 30, 2015 or LFUCG may be subject to stipulated penalties under its Consent Decree.
Alternate B:
Construct additional wastewater storage tanks upstream from the project area, incurring higher costs and disrupting established neighborhoods.
Entity Information
Entity Type:
Incorporated City
Entity Name:
Lexington-Fayette Urban County Government
PSC Group ID:
8810200
Office EMail:
aallan@lexingtonky.gov
Web URL:
Office Phone:
859-425-2255
Fax:
859-258-3194
Entity Address Information
Mail Address
Physical Address
Address Line 1:
200 E Main St
Address Line 2:
City, State Zip:
Lexington
,
KY
40507
Entity Contact Information
Contact Type
Name
Title
EMail
Phone
Cell
Business Contact:
Abigail Allan
City Clerk
aallan@lexingtonky.gov
859-258-3241
Authorized Official:
Linda Gorton
Mayor
LGorton@lexingtonky.gov
859-258-3100
Information Source:
Kentucky Department for Local Government
Date Last Modified:
04.24.2024
Project Administrator (PA) Information
Name:
Vernon Azevedo
Title:
Remedial Measures Program Manager
Organization:
Lexington-Fayette Urban County Government
EMail:
wazevedo@lexingtonky.gov
Phone:
859-425-2438
Fax:
Address Line 1:
125 Lisle Industrial Ave
Address Line 2:
Ste 180
City, State Zip:
Lexington
,
KY
40511
Applicant Contact (AC) Information
Name:
Charles H Martin
Title:
Director of Water Quality
Organization:
Lexington Fayette Urban County Government
EMail:
chmartin@lexingtonky.gov
Phone:
859-425-2400
Fax:
Address Line 1:
125 Lisle Industrial Avenue
Address Line 2:
Suite 180
City, State Zip:
Lexington
,
KY
40511
Project Engineer (PE) Information
This project requires a licensed Professional Engineer.
A Professional Engineer has been procured for this project.
Licensed Engineer Information
License Number:
PE 21211
PE Name:
Charles Holton Martin
Firm Name:
Address Type:
Work
Address Line 1:
LFUCG - Division of Sanitary Sewers
Address Line 2:
301 Lisle Industrail Ave.
Address Line 3:
City, State Zip:
Lexington
,
KY
40511
License Status:
Current
Disciplinary Actions:
No
Issue Date:
01.27.2000
Expiration Date:
06.30.2024
Phone:
859∙425∙2400
Fax:
EMail:
chmartin@lexingtonky.gov
Charles Holton Martin
Current
21,211
Estimated Budget
As-Bid Budget
Project Cost Categories
Cost Category
Cost
Administrative Expenses:
$113,514
Legal Expenses:
$283,784
Land, Appraisals, Easements:
$498,894
Relocation Expense & Payments:
Planning:
Engineering Fees - Design:
$563,275
Engineering Fees - Construction:
$241,403
Engineering Fees - Inspection:
$431,004
Engineering Fees - Other:
Construction:
$11,351,354
Equipment:
Miscellaneous:
Contingencies:
$3,405,406
Total Project Cost:
$16,888,634
Construction Cost Categories
Cost Category
Cost
WWTP Secondary Portion:
WWTP Advanced Portion:
Inflow & Infiltration Correction:
Major Sewer Rehabilitation:
Collector Sewers:
Interceptor Sewers, including Pump Stations:
$11,351,354
Combined Sewer Overflow Correction:
NPS Urban:
Non-Categorized Cost:
Total Construction Cost:
$11,351,354
Total Sustainability Costs:
$10,181,622
Note:
Sustainability costs are included within other costs
reported in this tab. This breakout, when provided,
is for SRF review purposes.
Project Funding Sources
Total Project Cost:
$16,888,634
Total Committed Funding:
Funding Gap:
Not Funded
Funding Source
Loan or
Grant ID
Fiscal
Year
Amount
Status
Applicable
Date
KIA SRF Fund A Loan (CW)
A15-001
2015
$16,888,634
Withdrawn
05-15-2014
KIA SRF Fund A Loan (CW)
A16-063
2016
$16,888,634
Expired
04-06-2015
KIA SRF Fund A Loan (CW)
A17-016
2017
$16,888,634
Withdrawn
11-20-2017
Total Committed
Funding Source Notes
Estimated Project Schedule
Facility Plan Approval Date:
01.26.2000
Estimated Environmental Review Submittal Date:
04.28.2016
Estimated Bid Date:
09.30.2016
Estimated Construction Start Date:
10.31.2016
Estimated Construction Completion Date:
05.31.2018
The following systems are beneficiaries of this project:
KY0021491
LFUCG - Town Branch
Checked box indicates primary system for this project.
Project Ranking by AWMPC:
Regional Ranking(s):
Planning Unit Ranking:
Total Points:
 
Plans and Specifications:
Plans and specs have been sent to DOW.
Date:
05.23.2016
Plans and specs have been reviewed by DOW.
Date:
05.23.2016
Plans and specs have been sent to PSC.
Plans and specs have been reviewed by PSC.
Economic Impacts
Jobs Created:
999
Jobs Retained:
MHI Basis:
2025: ACS 2018-2022 5yr Estimates
2024: ACS 2017-2021 5yr Estimates
2023: ACS 2016-2020 5yr Estimates
2022: ACS 2015-2019 5yr Estimates
2021: ACS 2014-2018 5yr Estimates
2020: ACS 2013-2017 5yr Estimates
2019: ACS 2012-2016 5yr Estimates
2018: ACS 2011-2015 5yr Estimates
2017: ACS 2010-2014 5yr Estimates
2016: ACS 2009-2013 5yr Estimates
2015: ACS 2008-2012 5yr Estimates
2014: ACS 2007-2011 5yr Estimates
2013: ACS 2006-2010 5yr Estimates
2012: ACS 2005-2009 5yr Estimates
Demographic Impacts (GIS Census Overlay)
Serviceable
Demographic
Project
Area
Included
Systems
Included
Utilities
Population:
128,077
311,463
Households:
57,598
141,025
MHI:
$66,087
*
$66,107
MHI MOE:
$1,966
$1,977
MOE as Percent:
3%
3%
**NSRL:
0
0
Population and household counts are based on the 2020 Census DEC Redistricting Data (PL 94-171) dataset.
Median Household Income (MHI) Source:
American Community Survey 2018-2022 5 Yr Estimates (Table B19013
*(for the primary system operated by the above listed beneficiary utilities).
MHI MOE = Med HH Income Margin of Error.
** NSRL (Non-Standard Rate Levels):
0 = Greater than or equal to Kentucky MHI (KMHI).
1 = Between 80% KMHI and KMHI (exclusive).
2 = Less than or equal to 80% KMHI.
- KMHI =
$60,183
- 80% KMHI =
$48,146
New Customers
New Residential Customers:
New Commercial Customers:
New Institutional Customers:
New Industrial Customers:
New or Improved Service
Service Demographic
Survey
Based
Census
Overlay*
To Unserved Households:
To Underserved Households:
1,700
To Total Households:
1,700
**Cost Per Household:
$9,934
*
GIS Census block overlay figures are estimates of population and households potentially served by systems and projects based on a proximity analysis of relevant service lines to census block boundaries published for the 2010 SF1 dataset.
**
Cost per household is based on surveyed household counts, not GIS overlay values.
Geographic Impacts
For Project Area
Counties
Fayette
Legislative Districts
District Name
Legislator
House 076
Ruth Ann Palumbo
House 077
George Brown Jr.
House 088
Cherlynn Stevenson
Senate 27
Stephen West
Senate 28
Greg Elkins
Congressional 6
Andy Barr
Groundwater
Sensitivity
Zones
5
HUC 10 Watersheds
HUC 10 Code
Watershed Name
0510020508
North Elkhorn Creek
WHPP Areas
PWSID
AKGWA
Zone
System Name
KY1050157
90000055
1
Georgetown Municipal Water & Sewer Service
Potential Impaired Watershed Designations
303d
305b
Priority
Watershed
Special
Use Waters
Exceptional
Use Waters
Yes
Yes
Yes
No
No
Note:
Impaired Watershed Designations only indicate that mapped components for this project lie within a HUC-12 watershed boundary containing impaired waterbody features. An affirmative indication for any designation will require a detailed analysis of the project to determine if any of the proposed project components will actually have a positive impact on the relevant impaired features.
Geographic Impacts
For Included System(s)
Counties
Fayette
Legislative Districts
District Name
House 045
Killian Timoney
House 075
Lindsey Burke
House 076
Ruth Ann Palumbo
House 077
George Brown Jr.
House 079
Chad Aull
House 088
Cherlynn Stevenson
Senate 12
Amanda Mays Bledsoe
Senate 13
Reginald Thomas
Senate 17
Damon Thayer
Senate 27
Stephen West
Senate 28
Greg Elkins
Congressional 6
Andy Barr
CW Specific Impacts:
Wastewater Volumes (MGD):
For this project:
9.500
For included system(s):
60.690
Reduced by this project:
Other CW Specific Impacts:
This project provides regionalization and/or consolidation of wastewater treatment systems.
This project will eliminate a package treatment plant that is more than 25 years old.
This project will eliminate a package treatment plant that has received notices of violations within the last two state fiscal years (July through June).
This project includes an on-site mound, and/or decentralized WW treatment system.
This project is necessary to achieve full or partial compliance with a court order, agreed order, or a judicial or administrative consent decree.
Agreed Order Number:
5:06-cv-386
This project includes components to achieve compliance with a federal consent decree.
Primary system has not received any CWA Notices of Violation within the previous state fiscal year (July through June).
This project is consistent with the approved facility plan.
This project will have a positive impact on drinking water sources within a 5 mile radius.
Planning Needs:
Combined Sewer Overflow (CSO) Correction.
Sanitary Sewer Overflow (SSO) Correction.
Replacement or Rehabilitation of Aging Infrastructure.
New Treatment Plant.
New Collector Sewers and Appurtenances.
Decentralized Wastewater Treatment Systems.
Upgrade to Advanced Treatment.
This project addresses PFAS or other emerging contaminants.
Rehab/Upgrade/Expansion of Existing Treatment Plant.
New Interceptor Sewers and Appurtenances.
Stormwater Control.
Non-Point Source (NPS) Pollution Control.
Recycled Water Distribution.
Planning
Other (specify):
Project Inventory (Mapped Features):
Point Features:
DOW
PermitID
Count
FeatureType
Purpose
Status
Existing
Capacity
Proposed
Capacity
Units
KY0021491
1
LIFTSTATION
ENERGY EFF - PUMP EFFICIENCY
NEW
9.50
MGD
KY0021491
1
LIFTSTATION
ENERGY EFF - PUMP ELIMINATION
ELIMINATE
100.00
GPM
KY0021491
1
LIFTSTATION
ENERGY EFF - PUMP ELIMINATION
ELIMINATE
200.00
GPM
KY0021491
1
LIFTSTATION
ENERGY EFF - PUMP ELIMINATION
ELIMINATE
600.00
GPM
KY0021491
1
LIFTSTATION
ENERGY EFF - PUMP ELIMINATION
ELIMINATE
750.00
GPM
KY0021491
1
LIFTSTATION
ENERGY EFF - PUMP ELIMINATION
ELIMINATE
850.00
GPM
Linear Features:
DOW
Permit ID
Line Type
Purpose
Activity
Size
(in.)
Material
Length
(LF)
KY0021491
FORCE
INTERCEPTOR
EXTENSION
24.00
DUCTILE IRON
5,353
KY0021491
TRUNK
INTERCEPTOR
EXTENSION
30.00
DUCTILE IRON
419
KY0021491
TRUNK
INTERCEPTOR
EXTENSION
30.00
PVC
6,202
Total Length
11,974
Administrative Components:
The following administrative components are included in this project:
Planning
Sewer System Evaluation Survey Report
Design
Construction
Management
Audits on Record
Associated With Applicant
Audit
Year
Entity Name
Entity
Relationship
2022
Lexington-Fayette Urban County Government
Parent
2021
Lexington-Fayette Urban County Government
Parent
2020
Lexington-Fayette Urban County Government
Parent
Water Treatment Plants Eliminated:
This project includes the elimination of water treatment plant(s).
Sanitary Sewer Components:
This project includes a new wastewater treatment plant.
This project includes an expansion of an existing wastewater treatment plant.
This project includes rehabilitation of an existing wastewater treatment plant.
This project includes upgrades to an existing wastewater treatment plant.
This project includes rehabilitation or replacement of aging infrastructure.
This project includes new collector sewers.
This project includes new interceptor sewers.
Total length of new interceptor sewer (LF):
11,974
This project includes elimination of existing sewer system components.
Security Components:
This project includes cyber-security components.
Green
Infrastructure
Water
Efficiency
Energy
Efficiency
Environmentally
Innovative
Asset
Management
Green Infrastructure:
Green stormwater infrastructure includes a wide array of practices at multiple scales that manage wet weather and that maintains and restores natural hydrology by infiltrating, evapotranspiring and harvesting and using stormwater. On a regional scale, green infrastructure is the preservation and restoration of natural landscape features, such as forests, floodplains, and wetlands, coupled with policies such as infill and redevelopment that reduce overall imperviousness in a watershed. On the local scale, green infrastructure consists of site and neighborhood-specific practices, such as:
Component
Cost
Item 1:
Implementation of green streets.
Item 2:
Wet Weather management systems for parking areas.
Item 3:
Implementation of comprehensive urban forestry programs.
Item 4:
Stormwater harvesting and reuse.
Item 5:
Downspout disconnection.
Item 6:
Comprehensive retrofit programs designed to keep wet weather discharges out of sewer systems.
Item 7:
Establishment or restoration of riparian buffers, floodplains, wetlands or other natural features.
$113,514
Item 8:
Management of wetlands.
Item 9:
Purchase of land or easements on land that has a direct benefit to water quality.
Total Cost:
$113,514
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Preservation of trees are incorporated into the alignment and construction of this project. An arborist will assess and identify trees that are considered specimen trees to be preserved as a part of this project. The plans and specifications will also include special provisions for the protection of existing tress to the maximum extent practicable. Design standards, including the use of riparian buffers, are incorporated into the alignment and construction of this project.
Water Efficiency:
The use of improved technologies and practices to deliver equal or better services with less water. Water efficiency encompasses conservation and reuse efforts, as well as water loss reduction and prevention, to protect water resources for the future. Examples include:
Component
Cost
Item 1:
Installing or retrofitting water efficient devices such as plumbing fixtures and appliances (toilets, showerheads, urinals).
Item 2:
Installing any type of water meter in previously unmetered areas (can include backflow prevention if in conjunction with meter replacement).
Item 3:
Replacing existing broken/malfunctioning water meters with AMR or smart meters, meters with leak detection, backflow prevention
Item 4:
Retrofitting/Adding AMR capabilities or leak equipment to existing meters.
Item 5:
Developing water audit and conservation plans, which are reasonably expected to result in a capital project.
Item 6:
Recycling and water reuse projects that replace potable sources with non-potable sources (Gray water, condensate, and wastewater effluent reuse systems, extra treatment or distribution costs associated with water reuse).
Item 7:
Retrofit or replacement of existing landscape irrigation/agricultural systems to more efficient landscape/agricultural irrigation systems (rain and moisture sensing equipment)
Item 8:
Water meter replacement with traditional water meters.*
Item 9:
Projects that result from a water audit or water conservation plan.*
Item 10:
Storage tank replacement/rehabilitation to reduce water loss.*
Item 11:
New water efficient landscape/agricultural irrigation system, where there currently is not one.*
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Energy Efficiency:
Energy efficiency is the use of improved technologies and practices to reduce the energy consumption of water projects, use energy in a more efficient way, and/or produce/utilize renewable energy. Examples include:
Component
Cost
Item 1:
Renewable energy projects such as wind, solar, geothermal, and micro-hydroelectric, and biogas combined heat and power systems that provide power to a POTW.
Item 2:
POTW-owned renewable energy projects.
Item 3:
Collection system infiltration/inflow (I/I) detection equipment.
Item 4:
POTW energy management planning, including energy assessments, energy audits, optimization studies, and sub-metering of individual processes to determine high energy use areas
Item 5:
Projects that achieve a reduction in energy consumption (pumps, motors).*
$34,054
Item 6:
Projects that cost effectively eliminate pumps or pumping stations.*
$34,054
Item 7:
I/I correction projects that save energy from pumping and reduced treatment costs.*
Item 8:
I/I correction where excessive groundwater infiltration is contaminating the influent requiring otherwise unnecessary treatment processes.*
Item 9:
Replacing old motors with premium energy efficiency motors.*
Item 10:
Upgrade of POTW lighting to energy efficient sources.*
Item 11:
SCADA systems where substantial energy savings can be demonstrated.*
Item 12:
Variable Frequency Drive (VFD) controllers where substantial energy savings can be demonstrated.*
Total Cost:
$68,108
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
This project will eliminate the need for 4 existing pump stations and consolidating the flow into one more energy efficient pump station.
Environmentally Innovative Projects:
Environmentally innovative projects include those that demonstrate new and/or innovative approaches to delivering services or managing water resources in a more sustainable way. Examples include:
Component
Cost
Item 1:
Total integrated water resources management planning likely to result in a capital project.
Item 2:
Utility sustainability plan consistent with EPA’s sustainability policy.
Item 3:
Greenhouse gas inventory or mitigation plan and submission of a GHG inventory to a registry as long as it is being done for an SRF eligible facility.
Item 4:
Planning activities by a POTW to prepare for adaptation to the long-term effects of climate change and/or extreme weather.
Item 5:
Construction of US Building Council LEED certified buildings, or renovation of an existing building on POTW facilities.
Item 6:
Decentralized wastewater treatment solutions to existing deficient or failing onsite wastewater systems.
Item 7:
Constructed wetlands projects used for municipal wastewater treatment, polishing, and/or effluent disposal.*
Item 8:
Projects that result from total/integrated water resource management planning consistent with the decision criteria for environmentally innovative projects and that are CWSRF eligible.*
Item 9:
Projects that facilitate adaptation of POTWs to climate change identified by a carbon footprint assessment or climate adaption study.*
Item 10:
POTW upgrades or retrofits that remove phosphorus for beneficial use, such as biofuel production with algae.*
Item 11:
Projects that significantly reduce or eliminate the use of chemicals in wastewater treatment.*
Item 12:
Treatment technologies that significantly reduce the volume of residuals, generation of residuals, or lower the amount of chemicals in the residuals.*
Item 13:
Educational activities and demonstration projects for water or energy efficiency.*
Item 14:
Projects that achieve the goals/objectives of utility asset management plans.*
$10,000,000
Item 15:
Sub-surface land application of effluent and other means for groundwater recharge, such as spray irrigation and overland flow.*
Total Cost:
$10,000,000
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Project proposed in LFUCG's Remedial Measures Plan, submitted to USEPA on April 13, 2012. The Remedial Measures Plan includes goals and objectives required to meet the requirements of the Consent Decree with USEPA and the Kentucky Division of Water. Costs associated with this component are actually $16,888,634.
Asset Management:
If a category is selected, the applicant must provide supporting documentation in PDF format to substantiate claims.
Asset Management Components
Last Rate Adjustment Date:
07.01.2019
Download Fee Schedule
Rate Adjustment Age (months):
54
System’s monthly water bill, based on 4,000 gallons, as a percentage of MHI:
0.57%
The system has an Asset Management Plan (AMP).
Note: AMP scoring credit requires at least one of the following components:
The AMP includes an Asset Inventory.
The AMP includes a Strategic Plan.
The AMP includes a Capital Improvement Plan.
Download Supporting Document
The system(s) involved in this project have specifically allocated funds for the rehabilitation and replacement of aging and deteriorating infrastructure.
If any box(es) above are checked, please describe each below.
LFUCG has a Consent Decree (CD) with USEPA and the Kentucky Division of Water that outlines the time lines required for the elimination of recurring SSO's. The second of three Remedial Measures Plans (RMPs), as required by the CD, was sent to the regulatory agencies on April 13, 2012. This project is included in this RMP submittal. LFUCG Department of Finance and Administration have developed a financial model to incorporate a rate structure to implement this project. The last rate increases were approved by LFUCG Council in 2008 and 2009 to finance the initial compliance efforts and additional increases being developed at this time.
Activity
Date
Profile Created:
11.22.2004
Profile Last Modified:
02.27.2020
General Info Last Modified:
02.27.2020
Narrative Last Modified:
05.02.2016
Admin Info Last Modified:
10.16.2013
Budget Info Last Modified:
10.16.2013
Impacts Info Last Modified:
05.16.2016
Plans & Specs Info Last Modified:
05.16.2016
Components Info Last Modified:
10.16.2013
GIS Last Modified:
08.22.2016
Deficiencies found in Sustainable Infrastructure Tab:
Asset Management Tab:
− The Capital Improvement Plan must have at least one of the required listed components.
Privacy
|
Security
|
Disclaimer
|
Accessibility Statement
Copyright ©
2024
Kentucky Infrastructure Authority