Clean Water Project Profile:
Project Title:
Richmond - TC15 Overflow Elimination Project
Project Number:
SX21151053
AWMPC:
BGADD
Funding Status:
Not Funded
Date Approved by AWMPC:
10.21.2016
Project Status:
Approved
Primary County:
Madison
Project Schedule:
0-2 Years
Planning Unit:
Unit 7
E-ClearingHouse SAI:
ECH Status:
Primary System:
KY0107107
Richmond Utilities - Otter Creek
ADD WMC Contact:
Karyn Leverenz
Legal Applicant:
City of Richmond
Entity Type:
Incorporated City
Narrative
Applicant
Administration
Budget
& Schedule
Impacts
Components
Sustainable
Infrastructure
Audit
Project Title:
Richmond - TC15 Overflow Elimination Project
Project Description:
This project includes a capacity analysis and computer modeling report to determine the necessary improvements required to alleviate the overflows. It is anticipated that approximately 2,900 linear feet (lf) of 8-inch and 2,715 lf of 10-inch gravity sewer along with 37 manholes will need to be replaced with approximately 2,900 lf of 12-inch and 2,715 lf of 15-inch and 37 manholes.
Need For Project:
Briefly describe how this project promotes public health or achieves and/or maintains compliance with the Clean Water Act or Safe Drinking Water Act:
The TC15 drainage basin of the Richmond Utilities Sanitary Sewer Collection System is subject to frequent wet weather induced overflows at three primary locations: TC15-M4- 11, TC15-M8-18, and TC15-M10-3. During the previous year, wet weather overflows in these locations have occurred at least 10 times. The cause of the overflows is not limited to inflow and infiltration in the collection system. There are confirmed deficiencies in the infrastructure that includes six 90 degree turns in the alignment; the presence of larger diameter gravity collectors feeding into small diameter collectors; parallel line installations, and changes in cross section area of lines entering and leaving manholes. The result of these deficiencies is compounded by the high level of development in the collection system since the main line was originally installed. The three subject overflows are on the federal EPA Overflow List and have been designated for elimination in the Kentucky Division of Water (KYDOW) approved Sanitary Sewer Overflow Plan.
Project Alternatives:
Alternate A:
Note: If project includes the construction of a new treatment plant or upgrade to existing plant, please explain regionalization options here.
Install a new pump station located near TC15-M4-11to pump the sewage beyond TC15-M10-3 to a point in the trunk sewer that can convey the total flow without causing overflows in the system.
Alternate B:
Replace approximately 2,900 lf of 8-inch, 2,715 lf of 10-inch gravity sewer and 37 manholes with approximately 2,900 lf of 12-inch, 2,715 lf of 15-inch and 37 manholes.
Entity Information
Entity Type:
Incorporated City
Entity Name:
City of Richmond
PSC Group ID:
8805700
Office EMail:
lcassity@richmond.ky.us
Web URL:
Office Phone:
859-623-1000
Fax:
859-623-7618
Entity Address Information
Mail Address
Physical Address
Address Line 1:
PO Box 250
Address Line 2:
City, State Zip:
Richmond
,
KY
40475
Entity Contact Information
Contact Type
Name
Title
EMail
Phone
Cell
Business Contact:
Lisa Cassity
City Clerk
lcassity@richmond.ky.us
859-623-1000
Authorized Official:
Robert Blythe
Mayor
rblythe@richmond.ky.us
859-623-1000
Information Source:
Kentucky Department for Local Government
Date Last Modified:
03.28.2024
Project Administrator (PA) Information
Name:
Scott Althauser
Title:
General Manager
Organization:
Richmond Water Sewer and Gas
EMail:
salthauser@richmondutilities.com
Phone:
859-623-2323
Fax:
859-624-0805
Address Line 1:
300 Hallie Irvine St
Address Line 2:
PO Box 700
City, State Zip:
Richmond
,
KY
40476
Applicant Contact (AC) Information
Name:
Lisa Cassity
Title:
City Clerk
Organization:
City of Richmond
EMail:
lcassity@richmond.ky.us
Phone:
859-623-1000
Fax:
859-623-7618
Address Line 1:
P.O. Box 250
Address Line 2:
239 West Main Street
City, State Zip:
Richmond
,
KY
40476
Project Engineer (PE) Information
This project requires a licensed Professional Engineer.
A Professional Engineer has been procured for this project.
Licensed Engineer Information
License Number:
PE 20981
PE Name:
David F. Schrader
Firm Name:
Bell Engineering
Address Type:
Work
Address Line 1:
2480 Fortune Drive
Address Line 2:
Suite 350
Address Line 3:
City, State Zip:
Lexington
,
KY
40509
License Status:
Current
Disciplinary Actions:
No
Issue Date:
07.21.1999
Expiration Date:
06.30.2024
Phone:
859∙278∙5412
Fax:
859∙278∙2911
EMail:
dschrader@hkbell.com
Engineering Firm Information
Permit Number:
152
Firm Name:
Bell Engineering
Phone:
859∙278∙5412
Fax:
859∙278∙2911
Web URL:
http://www.hkbell.com/
E-Mail:
jroberts@hkbell.com
Address Line 1:
2480 Fortune Dr
Address Line 2:
Suite 350
City, State Zip:
Lexington
,
KY
40509
Issue Date:
03.29.1993
Expir. Date:
12.31.2024
Permit
Status
Current
Disciplinary
Actions
No
David F. Schrader
Current
20,981
1,263
Estimated Budget
As-Bid Budget
Project Cost Categories
Cost Category
Cost
Administrative Expenses:
$20,000
Legal Expenses:
$100,000
Land, Appraisals, Easements:
$20,000
Relocation Expense & Payments:
Planning:
$68,500
Engineering Fees - Design:
$91,000
Engineering Fees - Construction:
$26,000
Engineering Fees - Inspection:
$80,000
Engineering Fees - Other:
$33,000
Construction:
$1,594,000
Equipment:
Miscellaneous:
$250,000
Contingencies:
$160,000
Total Project Cost:
$2,442,500
Construction Cost Categories
Cost Category
Cost
WWTP Secondary Portion:
WWTP Advanced Portion:
Inflow & Infiltration Correction:
$1,594,000
Major Sewer Rehabilitation:
Collector Sewers:
Interceptor Sewers, including Pump Stations:
Combined Sewer Overflow Correction:
NPS Urban:
Non-Categorized Cost:
Total Construction Cost:
$1,594,000
Total Sustainability Costs:
$18,000
Note:
Sustainability costs are included within other costs
reported in this tab. This breakout, when provided,
is for SRF review purposes.
Project Funding Sources
Total Project Cost:
$2,442,500
Total Committed Funding:
Funding Gap:
Not Funded
Funding Source
Loan or
Grant ID
Fiscal
Year
Amount
Status
Applicable
Date
KIA SRF Fund A Loan (CW)
A18-013
2018
$1,348,000
Declined
09-05-2017
21SB036 Cleaner Water Program (FY 2022)
21CWS073
2022
$0
Withdrawn
01-29-2024
KIA SRF Fund A Loan (CW)
A23-113
2023
$2,442,500
Expired
05-17-2022
Total Committed
Funding Source Notes
City intends to apply for KIA SRF Fund A Loan Madison co Allocation - CWP in amount of $1,327,903
Estimated Project Schedule
Facility Plan Approval Date:
11.07.2017
Estimated Environmental Review Submittal Date:
10.14.2017
Estimated Bid Date:
06.01.2022
Estimated Construction Start Date:
07.01.2022
Estimated Construction Completion Date:
08.01.2023
The following systems are beneficiaries of this project:
KY0107107
Richmond Utilities - Otter Creek
Checked box indicates primary system for this project.
Project Ranking by AWMPC:
Regional Ranking(s):
Planning Unit Ranking:
Total Points:
 
Plans and Specifications:
Plans and specs have been sent to DOW.
Plans and specs have been reviewed by DOW.
Plans and specs have been sent to PSC.
Plans and specs have been reviewed by PSC.
Economic Impacts
Jobs Created:
Jobs Retained:
MHI Basis:
2025: ACS 2018-2022 5yr Estimates
2024: ACS 2017-2021 5yr Estimates
2023: ACS 2016-2020 5yr Estimates
2022: ACS 2015-2019 5yr Estimates
2021: ACS 2014-2018 5yr Estimates
2020: ACS 2013-2017 5yr Estimates
2019: ACS 2012-2016 5yr Estimates
2018: ACS 2011-2015 5yr Estimates
2017: ACS 2010-2014 5yr Estimates
2016: ACS 2009-2013 5yr Estimates
2015: ACS 2008-2012 5yr Estimates
2014: ACS 2007-2011 5yr Estimates
2013: ACS 2006-2010 5yr Estimates
2012: ACS 2005-2009 5yr Estimates
Demographic Impacts (GIS Census Overlay)
Serviceable
Demographic
Project
Area
Included
Systems
Included
Utilities
Population:
35,218
35,218
Households:
16,152
16,152
MHI:
$45,677
*
$45,677
MHI MOE:
$2,081
$2,081
MOE as Percent:
5%
5%
**NSRL:
2
2
Population and household counts are based on the 2020 Census DEC Redistricting Data (PL 94-171) dataset.
Median Household Income (MHI) Source:
American Community Survey 2018-2022 5 Yr Estimates (Table B19013
*(for the primary system operated by the above listed beneficiary utilities).
MHI MOE = Med HH Income Margin of Error.
** NSRL (Non-Standard Rate Levels):
0 = Greater than or equal to Kentucky MHI (KMHI).
1 = Between 80% KMHI and KMHI (exclusive).
2 = Less than or equal to 80% KMHI.
- KMHI =
$60,183
- 80% KMHI =
$48,146
New Customers
New Residential Customers:
New Commercial Customers:
New Institutional Customers:
New Industrial Customers:
New or Improved Service
Service Demographic
Survey
Based
Census
Overlay*
To Unserved Households:
To Underserved Households:
To Total Households:
**Cost Per Household:
*
GIS Census block overlay figures are estimates of population and households potentially served by systems and projects based on a proximity analysis of relevant service lines to census block boundaries published for the 2010 SF1 dataset.
**
Cost per household is based on surveyed household counts, not GIS overlay values.
CW Specific Impacts:
Wastewater Volumes (MGD):
For this project:
For included system(s):
24.320
Reduced by this project:
0.085
Other CW Specific Impacts:
This project provides regionalization and/or consolidation of wastewater treatment systems.
This project will eliminate a package treatment plant that is more than 25 years old.
This project will eliminate a package treatment plant that has received notices of violations within the last two state fiscal years (July through June).
This project includes an on-site mound, and/or decentralized WW treatment system.
This project is necessary to achieve full or partial compliance with a court order, agreed order, or a judicial or administrative consent decree.
Primary system has not received any CWA Notices of Violation within the previous state fiscal year (July through June).
This project is consistent with the approved facility plan.
This project will have a positive impact on drinking water sources within a 5 mile radius.
Planning Needs:
Combined Sewer Overflow (CSO) Correction.
Sanitary Sewer Overflow (SSO) Correction.
Replacement or Rehabilitation of Aging Infrastructure.
New Treatment Plant.
New Collector Sewers and Appurtenances.
Decentralized Wastewater Treatment Systems.
Upgrade to Advanced Treatment.
This project addresses PFAS or other emerging contaminants.
Rehab/Upgrade/Expansion of Existing Treatment Plant.
New Interceptor Sewers and Appurtenances.
Stormwater Control.
Non-Point Source (NPS) Pollution Control.
Recycled Water Distribution.
Planning
Other (specify):
Project Inventory (Mapped Features):
There are no mapped features for this project.
Administrative Components:
The following administrative components are included in this project:
Planning
Sewer System Evaluation Survey Report
Design
Construction
Management
Audits on Record
Associated With Applicant
Audit
Year
Entity Name
Entity
Relationship
2023
Richmond, City of
Parent
2022
Richmond, City of
Parent
2021
Richmond, City of
Parent
2020
Richmond, City of
Parent
2023
Richmond Utilities
Child
2022
Richmond Utilities
Child
2021
Richmond Utilities
Child
2020
Richmond Utilities
Child
Water Treatment Plants Eliminated:
This project includes the elimination of water treatment plant(s).
Sanitary Sewer Components:
This project includes a new wastewater treatment plant.
This project includes an expansion of an existing wastewater treatment plant.
This project includes rehabilitation of an existing wastewater treatment plant.
This project includes upgrades to an existing wastewater treatment plant.
This project includes rehabilitation or replacement of aging infrastructure.
This project includes new collector sewers.
This project includes new interceptor sewers.
This project includes elimination of existing sewer system components.
Security Components:
This project includes cyber-security components.
Green
Infrastructure
Water
Efficiency
Energy
Efficiency
Environmentally
Innovative
Asset
Management
Green Infrastructure:
Green stormwater infrastructure includes a wide array of practices at multiple scales that manage wet weather and that maintains and restores natural hydrology by infiltrating, evapotranspiring and harvesting and using stormwater. On a regional scale, green infrastructure is the preservation and restoration of natural landscape features, such as forests, floodplains, and wetlands, coupled with policies such as infill and redevelopment that reduce overall imperviousness in a watershed. On the local scale, green infrastructure consists of site and neighborhood-specific practices, such as:
Component
Cost
Item 1:
Implementation of green streets.
Item 2:
Wet Weather management systems for parking areas.
Item 3:
Implementation of comprehensive urban forestry programs.
Item 4:
Stormwater harvesting and reuse.
Item 5:
Downspout disconnection.
Item 6:
Comprehensive retrofit programs designed to keep wet weather discharges out of sewer systems.
Item 7:
Establishment or restoration of riparian buffers, floodplains, wetlands or other natural features.
Item 8:
Management of wetlands.
Item 9:
Purchase of land or easements on land that has a direct benefit to water quality.
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Water Efficiency:
The use of improved technologies and practices to deliver equal or better services with less water. Water efficiency encompasses conservation and reuse efforts, as well as water loss reduction and prevention, to protect water resources for the future. Examples include:
Component
Cost
Item 1:
Installing or retrofitting water efficient devices such as plumbing fixtures and appliances (toilets, showerheads, urinals).
Item 2:
Installing any type of water meter in previously unmetered areas (can include backflow prevention if in conjunction with meter replacement).
Item 3:
Replacing existing broken/malfunctioning water meters with AMR or smart meters, meters with leak detection, backflow prevention
Item 4:
Retrofitting/Adding AMR capabilities or leak equipment to existing meters.
Item 5:
Developing water audit and conservation plans, which are reasonably expected to result in a capital project.
Item 6:
Recycling and water reuse projects that replace potable sources with non-potable sources (Gray water, condensate, and wastewater effluent reuse systems, extra treatment or distribution costs associated with water reuse).
Item 7:
Retrofit or replacement of existing landscape irrigation/agricultural systems to more efficient landscape/agricultural irrigation systems (rain and moisture sensing equipment)
Item 8:
Water meter replacement with traditional water meters.*
Item 9:
Projects that result from a water audit or water conservation plan.*
Item 10:
Storage tank replacement/rehabilitation to reduce water loss.*
Item 11:
New water efficient landscape/agricultural irrigation system, where there currently is not one.*
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Energy Efficiency:
Energy efficiency is the use of improved technologies and practices to reduce the energy consumption of water projects, use energy in a more efficient way, and/or produce/utilize renewable energy. Examples include:
Component
Cost
Item 1:
Renewable energy projects such as wind, solar, geothermal, and micro-hydroelectric, and biogas combined heat and power systems that provide power to a POTW.
Item 2:
POTW-owned renewable energy projects.
Item 3:
Collection system infiltration/inflow (I/I) detection equipment.
$18,000
Item 4:
POTW energy management planning, including energy assessments, energy audits, optimization studies, and sub-metering of individual processes to determine high energy use areas
Item 5:
Projects that achieve a reduction in energy consumption (pumps, motors).*
Item 6:
Projects that cost effectively eliminate pumps or pumping stations.*
Item 7:
I/I correction projects that save energy from pumping and reduced treatment costs.*
Item 8:
I/I correction where excessive groundwater infiltration is contaminating the influent requiring otherwise unnecessary treatment processes.*
Item 9:
Replacing old motors with premium energy efficiency motors.*
Item 10:
Upgrade of POTW lighting to energy efficient sources.*
Item 11:
SCADA systems where substantial energy savings can be demonstrated.*
Item 12:
Variable Frequency Drive (VFD) controllers where substantial energy savings can be demonstrated.*
Total Cost:
$18,000
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
This project includes flow monitoring and computer simulations of the existing sanitary sewer system to help identify needed improvements that will help eliminate sanitary sewer overflows. Implementation of the improvements identified in this project may eliminate as much as 0.085 mgd of flow into the collection system thus reducing pumping and treatment costs.
Environmentally Innovative Projects:
Environmentally innovative projects include those that demonstrate new and/or innovative approaches to delivering services or managing water resources in a more sustainable way. Examples include:
Component
Cost
Item 1:
Total integrated water resources management planning likely to result in a capital project.
Item 2:
Utility sustainability plan consistent with EPA’s sustainability policy.
Item 3:
Greenhouse gas inventory or mitigation plan and submission of a GHG inventory to a registry as long as it is being done for an SRF eligible facility.
Item 4:
Planning activities by a POTW to prepare for adaptation to the long-term effects of climate change and/or extreme weather.
Item 5:
Construction of US Building Council LEED certified buildings, or renovation of an existing building on POTW facilities.
Item 6:
Decentralized wastewater treatment solutions to existing deficient or failing onsite wastewater systems.
Item 7:
Constructed wetlands projects used for municipal wastewater treatment, polishing, and/or effluent disposal.*
Item 8:
Projects that result from total/integrated water resource management planning consistent with the decision criteria for environmentally innovative projects and that are CWSRF eligible.*
Item 9:
Projects that facilitate adaptation of POTWs to climate change identified by a carbon footprint assessment or climate adaption study.*
Item 10:
POTW upgrades or retrofits that remove phosphorus for beneficial use, such as biofuel production with algae.*
Item 11:
Projects that significantly reduce or eliminate the use of chemicals in wastewater treatment.*
Item 12:
Treatment technologies that significantly reduce the volume of residuals, generation of residuals, or lower the amount of chemicals in the residuals.*
Item 13:
Educational activities and demonstration projects for water or energy efficiency.*
Item 14:
Projects that achieve the goals/objectives of utility asset management plans.*
Item 15:
Sub-surface land application of effluent and other means for groundwater recharge, such as spray irrigation and overland flow.*
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Asset Management:
If a category is selected, the applicant must provide supporting documentation in PDF format to substantiate claims.
Asset Management Components
Last Rate Adjustment Date:
07.01.2020
Download Fee Schedule
Rate Adjustment Age (months):
42
System’s monthly water bill, based on 4,000 gallons, as a percentage of MHI:
1.24%
The system has an Asset Management Plan (AMP).
Note: AMP scoring credit requires at least one of the following components:
The AMP includes an Asset Inventory.
The AMP includes a Strategic Plan.
The AMP includes a Capital Improvement Plan.
Download Supporting Document
The system(s) involved in this project have specifically allocated funds for the rehabilitation and replacement of aging and deteriorating infrastructure.
Download Supporting Document
If any box(es) above are checked, please describe each below.
A facilities management plan has been drafted and will be submitted to the KYDOW in August 2016. This plan includes an analysis of the rate impact of the project and implementation of a funding program.
Activity
Date
Profile Created:
07.27.2016
Profile Last Modified:
12.22.2021
General Info Last Modified:
11.14.2016
Narrative Last Modified:
07.27.2016
Admin Info Last Modified:
07.27.2016
Budget Info Last Modified:
12.07.2021
Impacts Info Last Modified:
07.27.2016
Plans & Specs Info Last Modified:
Components Info Last Modified:
07.27.2016
GIS Last Modified:
Deficiencies found in Impacts Tab:
Demographic Impacts Section:
− Warning: There are no surveyed household counts for this project.
Deficiencies found in Sustainable Infrastructure Tab:
Asset Management Tab:
− The Capital Improvement Plan must have at least one of the required listed components.
This project has no mapped components.
Privacy
|
Security
|
Disclaimer
|
Accessibility Statement
Copyright ©
2024
Kentucky Infrastructure Authority