Drinking Water Project Profile:
This profile is read-only (constructed or withdrawn).
Project Title:
Ohio County Water District Water Main Upgrade Project
Project Number:
WX21183039
AWMPC:
GRADD
Funding Status:
Fully Funded
Date Approved by AWMPC:
03.20.2015
Project Status:
Constructed
Primary County:
Ohio
Project Schedule:
Constructed
Planning Unit:
Ohio
E-ClearingHouse SAI:
KY201703130447
ECH Status:
Approved
Primary System:
KY0920332
Ohio County Water District
ADD WMC Contact:
Dana Garrett
Legal Applicant:
Ohio County Water District
Entity Type:
Water District (KRS 74)
Narrative
Applicant
Administration
Budget
& Schedule
Impacts
Components
Sustainable
Infrastructure
Audit
Project Title:
Ohio County Water District Water Main Upgrade Project
Project Description:
ADDITIONAL SCOPE OF WORK IN PROJECT PROFILE WX21183044 - SAI KY201709111089 This project proposes the replacement of a current 6-inch asbestos/concrete line with approximately 5,500 LF of 8-inch PVC line in order to increase the capacity and the ability serve customers receiving water from the existing 500,000 gallon Hoover Hill Tank. Approximately 800 homes/businesses will benefit from this project with improved water quality, reliability, service and delivery. It will also improve the disinfection by-product levels (TTHM/HAA) by increasing water flow and usage to an area susceptible to such issues. This project will also provide a vital backup to an 8-inch water line crossing at Rough River, as well as to an existing 440 GPM pump station. Should either the water line or pump station fail a major disruption of water service in the northern service area would occur. The Hoover Hill project also contains very definite regionalization potential for the Ohio County Water District to provide water to additional wholesale water customers. ADDITIONAL SCOPE OF WORK ADDED TO PROJECT PROFILE - SAI KY201703130447 The district has requested to change order additional work in the scope of the project to include the following: The proposed work includes the replacement of non-working valves and a failing PVC road bore discovered during construction of the original project and which was covered under SAI #KY20150421-0378 and AI ID: 3305; PLN20150001. New work proposed includes the replacing approximately 2,115 linear feet of two inch line with six-inch PVC pipe to be installed along Apple House Road, a six-inch tapping sleeve and valve with kickers and a one-inch manual air release valve – all to be installed on Apple House road. The cost of the additional work totals $51,995.00 Original Scope of Work covered under SAI# KY201504210378: This project proposes installing 16-inch line that will replace the current 8- and 10-inch lines already in place. The proposed project will eliminate one existing pump station at a significant savings of nearly $40,000 annually to the water district while improving reliability of the system to effectively deliver water to the northern section of Ohio County and the southern section of Daviess County. This project proposes the installation of approximately 15,500 LF of 16-inch water main lines beginning at Bluegrass Crossing Industrial Park water tank and ending at the Industrial Park East Water Tank. This project will dramatically increase the reliability of service to two major industrial parks, as well at the anticipated potential growth in these areas The estimated cost of this project totals $1,630,000
Need For Project:
Briefly describe how this project promotes public health or achieves and/or maintains compliance with the Clean Water Act or Safe Drinking Water Act:
This project will both enhance current services to existing customers, including two major industrial parks, while allowing for potential growth in the service areas.
Project Alternatives:
Alternate A:
Note: If project includes the construction of a new treatment plant or upgrade to existing plant, please explain regionalization options here.
Replace and/or rehab current pump station at a cost estimated cost on nearly $100,000 to the water district.
Alternate B:
The construction of a second pump station to support and offer the Bluegrass Crossing Industrial Park a reliable water supply should its tank ever fail.
Entity Information
Entity Type:
Water District (KRS 74)
Entity Name:
Ohio County Water District
PSC Group ID:
27500
Office EMail:
ehickman@ocwdky.org
Web URL:
Office Phone:
270-298-7704
Fax:
270-298-9890
Entity Address Information
Mail Address
Physical Address
Address Line 1:
124 E Washington St
Address Line 2:
City, State Zip:
Hartford
,
KY
42347
Entity Contact Information
Contact Type
Name
Title
EMail
Phone
Cell
Business Contact:
Eric Hickman
General Manager
ehickman@ocwdky.org
270-298-7704
270-519-0885
Authorized Official:
Eric Hickman
General Manager
ehickman@ocwdky.org
270-298-7704
270-519-0885
Information Source:
Kentucky Infrastructure Authority
Date Last Modified:
02.14.2024
Project Administrator (PA) Information
Name:
Skyler Stewart
Title:
Infrastructure Planner
Organization:
Green River Area Development District
EMail:
skylerstewart@gradd.com
Phone:
270-926-4433
Fax:
270-684-0714
Address Line 1:
300 GRADD Way
Address Line 2:
City, State Zip:
Owensboro
,
KY
42301
Applicant Contact (AC) Information
Name:
Walt Beasley
Title:
General Superintendent
Organization:
Ohio County Water District
EMail:
waltb32@gmail.com
Phone:
270-298-7704
Fax:
270-298-9890
Address Line 1:
PO Box 207
Address Line 2:
City, State Zip:
Hartford
,
KY
42347
Project Engineer (PE) Information
This project requires a licensed Professional Engineer.
A Professional Engineer has been procured for this project.
Licensed Engineer Information
License Number:
PE 2810
PE Name:
J. Roy Wauford
Firm Name:
J. R. Wauford & Company, Consulting Engineers, Inc.
Address Type:
Work
Address Line 1:
J. R. Wauford & Company
Address Line 2:
P.O. Box 140350, 2835 Lebanon Rd.
Address Line 3:
City, State Zip:
Nashville
,
TN
37214
License Status:
Deceased
Disciplinary Actions:
No
Issue Date:
10.05.1954
Expiration Date:
06.30.2018
Phone:
615∙883∙3243
Fax:
EMail:
gregd@jrwauford.com
Engineering Firm Information
Permit Number:
511
Firm Name:
J. R. Wauford & Company, Consulting Engineers, Inc.
Phone:
615∙883∙3243
Fax:
Web URL:
http://www.jrwauford.com/
E-Mail:
debrad@jrwauford.com
Address Line 1:
2835 Lebanon Pike
Address Line 2:
City, State Zip:
Nashville
,
TN
37214
Issue Date:
09.22.1993
Expir. Date:
12.31.2024
Permit
Status
Current
Disciplinary
Actions
No
J. Roy Wauford
Deceased
2,810
530
Estimated Budget
As-Bid Budget
Project Cost Categories
Cost Category
Cost
Administrative Expenses:
$42,000
Legal Expenses:
$18,000
Land, Appraisals, Easements:
Relocation Expense & Payments:
Planning:
Engineering Fees - Design:
$78,000
Engineering Fees - Construction:
$56,000
Engineering Fees - Inspection:
Engineering Fees - Other:
$6,000
Construction:
$1,281,000
Equipment:
Miscellaneous:
$30,000
Contingencies:
$119,000
Total Project Cost:
$1,630,000
Construction Cost Categories
Cost Category
Cost
Treatment:
Transmission and Distribution:
$1,281,000
Lead Remediation:
Source:
Storage:
Purchase of Systems:
Restructuring:
Land Acquisition:
Non-Categorized :
Total Construction Cost:
$1,281,000
Total Sustainability Costs:
$2,000,000
Note:
Sustainability costs are included within other costs
reported in this tab. This breakout, when provided,
is for SRF review purposes.
Project Funding Sources
Total Project Cost:
$1,630,000
Total Committed Funding:
$1,630,000
Funding Gap:
Fully Funded
Funding Source
Loan or
Grant ID
Fiscal
Year
Amount
Status
Applicable
Date
KIA SRF Fund F Loan (DW)
F15-069
2015
$1,630,000
Committed
06-04-2015
KIA SRF Fund F Loan (DW)
F15-069
2016
$3,400,000
Bypassed
06-04-2015
Total Committed
$1,630,000
Funding Source Notes
Estimated Project Schedule
Estimated Environmental Review Submittal Date:
Estimated Bid Date:
04.15.2015
Estimated Construction Start Date:
06.01.2015
Estimated Construction Completion Date:
The following systems are beneficiaries of this project:
KY0920332
Ohio County Water District
Checked box indicates primary system for this project.
Project Ranking by AWMPC:
Regional Ranking(s):
Planning Unit Ranking:
Total Points:
 
Plans and Specifications:
Plans and specs have been sent to DOW.
Plans and specs have been reviewed by DOW.
Plans and specs have been sent to PSC.
Plans and specs have been reviewed by PSC.
Economic Impacts
Jobs Created:
Jobs Retained:
MHI Basis:
2025: ACS 2018-2022 5yr Estimates
2024: ACS 2017-2021 5yr Estimates
2023: ACS 2016-2020 5yr Estimates
2022: ACS 2015-2019 5yr Estimates
2021: ACS 2014-2018 5yr Estimates
2020: ACS 2013-2017 5yr Estimates
2019: ACS 2012-2016 5yr Estimates
2018: ACS 2011-2015 5yr Estimates
2017: ACS 2010-2014 5yr Estimates
2016: ACS 2009-2013 5yr Estimates
2015: ACS 2008-2012 5yr Estimates
2014: ACS 2007-2011 5yr Estimates
2013: ACS 2006-2010 5yr Estimates
2012: ACS 2005-2009 5yr Estimates
Demographic Impacts (GIS Census Overlay)
Serviceable
Demographic
Project
Area
Included
Systems
Included
Utilities
Population:
14,967
14,966
Households:
6,268
6,268
MHI:
$55,041
*
$55,041
MHI MOE:
$11,916
$11,916
MOE as Percent:
22%
22%
**NSRL:
1
1
Population and household counts are based on the 2020 Census DEC Redistricting Data (PL 94-171) dataset.
Median Household Income (MHI) Source:
American Community Survey 2018-2022 5 Yr Estimates (Table B19013
*(for the primary system operated by the above listed beneficiary utilities).
MHI MOE = Med HH Income Margin of Error.
** NSRL (Non-Standard Rate Levels):
0 = Greater than or equal to Kentucky MHI (KMHI).
1 = Between 80% KMHI and KMHI (exclusive).
2 = Less than or equal to 80% KMHI.
- KMHI =
$60,183
- 80% KMHI =
$48,146
New Customers
New Residential Customers:
New Commercial Customers:
New Institutional Customers:
New Industrial Customers:
New or Improved Service
Service Demographic
Survey
Based
Census
Overlay*
To Unserved Households:
To Underserved Households:
3,000
To Total Households:
3,000
**Cost Per Household:
$543
*
GIS Census block overlay figures are estimates of population and households potentially served by systems and projects based on a proximity analysis of relevant service lines to census block boundaries published for the 2010 SF1 dataset.
**
Cost per household is based on surveyed household counts, not GIS overlay values.
Geographic Impacts
For Project Area
Counties
Ohio
Legislative Districts
District Name
Legislator
House 014
Scott Lewis
Senate 05
Stephen Meredith
Congressional 2
Brett Guthrie
HUC 10 Watersheds
HUC 10 Code
Watershed Name
0511000305
Lewis Creek-Green River
0511000405
Muddy Creek-Rough River
Geographic Impacts
For Included System(s)
Counties
Breckinridge
Butler
Daviess
Grayson
McLean
Ohio
Legislative Districts
District Name
House 007
Suzanne Miles
House 010
Josh Calloway
House 012
Jim Gooch Jr.
House 014
Scott Lewis
House 015
Rebecca Raymer
House 018
Samara Heavrin
Senate 05
Stephen Meredith
Senate 08
Gary Boswell
Congressional 2
Brett Guthrie
DW Specific Impacts:
This project relates to a public health emergency.
This project will assist a non-compliant system to achieve compliance.
This project will assist a compliant system to meet future requirements.
This project will provide assistance not compliance related.
This project is necessary to achieve full or partial compliance with a court order, agreed order, or a judicial or administrative consent decree.
Primary system has not received any SDWA Notices of Violation within the previous state fiscal year (July through June).
Primary system has had an action level exceedance (lead concentrations exceed an action level of 15 ppb in more than 10% of customer taps sampled) within the last compliance period.
Primary system has received a lead trigger level exceedance (lead concentrations exceed a trigger level of 10 ppb in more than 10% of customer taps sampled) within the last compliance period.
Project Readiness LSL (Lead Inventory and Lead Service Line Replacement):
Lead Service Line Inventory:
A description of goals to be achieved and products to be created (e.g., electronic or GIS database; customer communication tools) when creating a lead service line inventory procedure, including a proposed timeline for achieving each goal.
Lead Service Line Replacement:
A strategy for informing customers before a LSLR and a template for an agreement with the private property owner to replace the LSL.
A process for documenting all property owners declining replacement of privately owned portion of LSL.
A procedure for customers to flush service lines and premise plumbing of particulate lead.
A proposed plan for conducting LSL replacement utilizing all requested funding.
A funding strategy for conducting LSLRs utilizing all requested funding.
Project Inventory (Mapped Features):
Point Features:
DOW
PermitID
Count
Feature Type
Purpose
Status
Existing
Capacity
Proposed
Capacity
Units
KY0920332
1
PUMP STATION
PROJECT WILL ELIMINATE PUMP STATION
ELIMINATE
750.00
GPM
Linear Features:
DOW
Permit ID
Line Type
Purpose
Activity
Size
(in.)
Material
Length
(LF)
KY0920332
WATER LINE: FINISHED
DISTRIBUTION
REHAB - REPLACE UNDERSIZED LINES
6.00
PVC
1,943
KY0920332
WATER LINE: FINISHED
TRANSMISSION
REHAB - REPLACE UNDERSIZED LINES
16.00
PVC
15,516
Total Length
17,459
Administrative Components:
The following administrative components are included in this project:
Planning
Design
Construction
Management
Audits on Record
Associated With Applicant
Audit
Year
Entity Name
Entity
Relationship
2022
Ohio County Water District
Parent
2021
Ohio County Water District
Parent
2020
Ohio County Water District
Parent
Regionalization Components:
Public Water Systems Eliminated:
This project includes the elimination of public water system(s) through merger or acquisition.
Water Treatment Plants Eliminated:
This project includes the elimination of water treatment plant(s).
Supplementation of Raw Water Supply:
This project includes supplementing the existing raw water supply.
Supplementation of Potable Water Supply:
This project includes supplementing the existing potable water supply.
Emergency Only Water Supply:
This project provides emergency only water supply.
Water Source Protection:
This project will preventatively address PFAS or other emerging contaminants of the source water.
This project will address current PFAS or other emerging contaminants of the source water.
This project includes the rehabilitation of a dam or reservoir used primarily for drinking water.
This project includes land acquisition for water source protection.
Water Treatment Components:
This project includes water treatment components.
Water Distribution and Storage Components:
This project includes water distribution and/or storage components.
Water Line Extensions:
This project includes water line extension(s).
Redundancy Components:
This project includes emergency power generators for distribution and/or storage activities.
This project includes redundant distribution and/or storage processes.
Explanation of how redundant distribution and/or storage processes will be achieved:
Currently, water is pumped in only one direction from Bluegrass Crossings Business Center to the Industrial Park East. This project will allow for the redundant flow of water back to Bluegrass Crossings Business Center if ever needed.
Finished Water Quality:
This project includes infrastructure to address inadequate water turnover and disinfection byproducts (DBPs).
Service Line Inventory:
This project includes implementation of a service line inventory.
Water Line Replacement:
This project replaces problem water lines (breaks, leaks, or restrictive flows due to age), water lines consisting of lead and/or asbestos-cement (AC), and/or inadequately sized water lines.
Total length of line replacement:
17,459
LF
In-place or in-situ repair medhods will be used in lieu of water line replacement.
This project replaces lead service lines.
Roads Serviced by Line Replacements:
Water Loss in the Last 12 Months:
The system has experienced the following water loss over the past 12 months:
Water loss volume (MG):
83.190
Water loss percent:
10%
Water Storage and Pressure Components:
This project includes the construction of new water tank(s).
This project includes the replacement of existing water tank(s).
This project includes the rehabilitation of existing water tank(s).
This project includes the construction of new pump station(s).
This project includes the rehabilitation of existing pump station(s).
Security:
This project includes security components for water distribution infrastructure.
Green
Infrastructure
Water
Efficiency
Energy
Efficiency
Environmentally
Innovative
Asset
Management
Green Infrastructure:
Green stormwater infrastructure includes a wide array of practices at multiple scales that manage wet weather and that maintains and restores natural hydrology by infiltrating, evapotranspiring and harvesting and using stormwater. On a regional scale, green infrastructure is the preservation and restoration of natural landscape features, such as forests, floodplains, and wetlands, coupled with policies such as infill and redevelopment that reduce overall imperviousness in a watershed. On the local scale, green infrastructure consists of site and neighborhood-specific practices, such as:
Component
Cost
Item 1:
Bioretention
Item 2:
Trees
Item 3:
Green Roofs
Item 4:
Permeable Pavement
Item 5:
Cisterns
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Water Efficiency:
The use of improved technologies and practices to deliver equal or better services with less water. Water efficiency encompasses conservation and reuse efforts, as well as water loss reduction and prevention, to protect water resources for the future. Examples include:
Component
Cost
Item 1:
Installing or retrofitting water efficient devices such as plumbing fixtures and appliances (toilets, showerheads, urinals).
Item 2:
Installing any type of water meter in previously unmetered areas (can include backflow prevention if in conjunction with meter replacement).
Item 3:
Replacing existing broken/malfunctioning water meters with AMR or smart meters, meters with leak detection, backflow prevention.
Item 4:
Retrofitting/adding AMR capabilities or leak equipment to existing meters.
Item 5:
Conducting water utility audits, leak detection studies, and water use efficiency baseline studies, which are reasonably expected to result in a capital project or in a reduction in demand to alleviate the need for additional capital investment.
Item 6:
Developing conservation plans/programs reasonable expected to result in a water conserving capital project or in a reduction in demand to alleviate the need for capital investment.
Item 7:
Recycling and water reuse projects that replace potable sources with non-potable sources (Gray water, condensate, and wastewater effluent reuse systems, extra treatment or distribution costs associated with water reuse).
Item 8:
Retrofit or replacement of existing landscape irrigation systems to more efficient landscape irrigation systems.
Item 9:
Water meter replacement with traditional water meters.*
Item 10:
Distribution pipe replacement or rehabilitation to reduce water loss and prevent water main breaks.*
Item 11:
Storage tank replacement/rehabilitation to reduce water loss.*
Item 12:
New water efficient landscape irrigation system, where there currently is not one.*
Item 13:
Implementation of incentive programs to conserve water such as rebates.
Item 14:
Installing WaterSense labeled products (
https://www.epa.gov/watersense
)
Item 15:
Projects that result from a water efficiency related assessments (such as water audits, leak detection studies, conservation plans, etc.) as long as the assessments adhered to the standard industry practices referenced above.
Item 16:
Distribution system leak detection equipment, portable or permanent.
Item 17:
Automatic flushing systems (portable or permanent).
Item 18:
Pressure reducing valves (PRVs).
Item 19:
Internal plant water reuse (such as backwash water recycling).
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Energy Efficiency:
Energy efficiency is the use of improved technologies and practices to reduce the energy consumption of water projects, use energy in a more efficient way, and/or produce/utilize renewable energy. Examples include:
Component
Cost
Item 1:
Renewable energy projects, which are part of a public health project, such as wind, solar, geothermal, and micro-hydroelectric that provides power to a utility.
Item 2:
Utility-owned or publicly-owned renewable energy projects.
Item 3:
Utility energy management planning, including energy assessments, energy audits, optimization studies, and sub-metering of individual processes to determine high energy use areas.
Item 4:
Energy efficient retrofits, upgrades, or new pumping systems and treatment processes (including variable frequency drives (VFDs).*
Item 5:
Pump refurbishment to optimize pump efficiency.*
Item 6:
Projects that result from an energy efficient related assessment.*
Item 7:
Projects that cost effectively eliminate pumps or pumping stations.*
Item 8:
Projects that achieve the remaining increments of energy efficiency in a system that is already very efficient.*
Item 9:
Upgrade of lighting to energy efficient sources.*
Item 10:
Automated and remote control systems (SCADA) that achieve substantial energy savings.*
Total Cost:
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Environmentally Innovative Projects:
Environmentally innovative projects include those that demonstrate new and/or innovative approaches to delivering services or managing water resources in a more sustainable way. Examples include:
Component
Cost
Item 1:
Total integrated water resources management planning, or other planning framework where project life cycle costs are minimized, which enables communities to adopt more efficient and cost-effective infrastructure solutions.
Item 2:
Plans to improve water quantity and quality associated with water system technical, financial, and managerial capacity.
Item 3:
Source water protection planning (delineation, monitoring, modeling).
Item 4:
Planning activities to prepare for adaptation to the long-term effects of climate change and/or extreme weather.
Item 5:
Utility sustainability plan consistent with EPA’s sustainability policy.
Item 6:
Greenhouse gas inventory or mitigation plan and submission of a GHG inventory to a registry as long as it is being done for an SRF eligible facility.
Item 7:
Construction of US Building Council LEED certified buildings, or renovation of an existing building.
Item 8:
Projects that significantly reduce or eliminate the use of chemicals in water treatment.*
Item 9:
Treatment technologies or approaches that significantly reduce the volume of residuals, minimize the generation of residuals, or lower the amount of chemicals in the residuals.*
Item 10:
Trenchless or low impact construction technology.*
Item 11:
Using recycled materials or re-using materials on-site.*
Item 12:
Educational activities and demonstration projects for water or energy efficiency (such as rain gardens).*
Item 13:
Projects that achieve the goals/objectives of utility asset management plans*
$2,000,000
Total Cost:
$2,000,000
* Indicates a business case may be required for this item.
If any box(es) above are checked, please describe each below.
Over the course of the 50-year life expectancy of the proposed new lines and will also result in the elimination of one pump station the total cost saving to the water district is $2,000,000
Asset Management:
If a category is selected, the applicant must provide supporting documentation in PDF format to substantiate claims.
Asset Management Components
Last Rate Adjustment Date:
12.03.2020
Download Fee Schedule
Rate Adjustment Age (months):
37
System’s monthly water bill, based on 4,000 gallons, as a percentage of MHI:
1.04%
The system has an Asset Management Plan (AMP).
The system(s) involved in this project have specifically allocated funds for the rehabilitation and replacement of aging and deteriorating infrastructure.
If any box(es) above are checked, please describe each below.
Activity
Date
Profile Created:
09.17.2014
Profile Last Modified:
09.10.2019
General Info Last Modified:
09.10.2019
Narrative Last Modified:
10.12.2017
Admin Info Last Modified:
08.13.2019
Budget Info Last Modified:
01.29.2015
Impacts Info Last Modified:
01.29.2015
Plans & Specs Info Last Modified:
Components Info Last Modified:
01.29.2015
GIS Last Modified:
02.21.2017
Deficiencies found in Administration Tab:
Project Engineer:
− The project engineer's license is not current.